Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹7.3 CrAccepted-AOC MOHAL WARD NO 10 ROBERTSGANJ SONBHADRA | SONBHADRA | UTTAR PRADESH | 231205 | ₹7.3 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹7.5 CrRejected-Finance BHANSHAN CHOLA PUR VARANASI | VARANASI | UTTAR PRADESH | 221001 | ₹7.5 Cr | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹8.4 CrRejected-Finance | ₹8.4 Cr | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹8.6 CrRejected-Finance 0 | ₹8.6 Cr | L-4 | Rejected-Finance L-4 |
| 5 | L-5₹8.8 CrRejected-Finance DISTRICT PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | ₹8.8 Cr | L-5 | Rejected-Finance L-5 |
| Sl No | Description | Qty | Unit | M/S HAZRAT ALI L1 | DESCON INFRASTRUCTURES PRIVATE LIMITED L7 | M/S RAJ CONSTRUCTION L4 | APS AND COMPANY PRIVATE LIMITED L5 | SAHIL ENTERPRISES L2 | UMA ASSOCIATES INFRATECH DEVELOPERS PVT LTD L6 | SAINIK CONSTRUCTION PVT LTD L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 5,442 | Cum | 21.3 ₹1.2 L | 40 ₹2.2 L | 30 ₹1.6 L | 40 ₹2.2 L | 35 ₹1.9 L | 45 ₹2.4 L | 59 ₹3.2 L |
| 2.00 | Construction of Embankment with Material Deposited from Roadway Cutting: Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 5,442 | Cum | 35.5 ₹1.9 L | 61 ₹3.3 L | 30 ₹1.6 L | 45 ₹2.4 L | 41 ₹2.2 L | 54 ₹2.9 L | 62 ₹3.4 L |
| 3.00 | Construction of Embankment with Material obtained from Right of way: Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 11,250 | Cum | 78.11 ₹8.8 L | 150 ₹16.9 L | 70 ₹7.9 L | 85 ₹9.6 L | 85 ₹9.6 L | 90 ₹10.1 L | 105 ₹11.8 L |
| 4.00 | Providing, laying, spreading and compacting of existing granular material adding cement and admixture using truck mounted / self propelled cement spreader shall have variable working width with microprocessor, controlled spray rate through augers and cellular wheels. The aggregate shall be in situ pulverized/stabilize using four wheeled drive recycler having working depth up to 50 cm with variable depth control system. Compacting with vibratory roller to achieve design unconfined compressive strength.(with additive) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 11,670 | Cum | 2,343.33 ₹2.7 Cr | 2,100 ₹2.5 Cr | 900 ₹1.1 Cr | 1,400 ₹1.6 Cr | 895 ₹1.0 Cr | 1,691 ₹2.0 Cr | 1,300 ₹1.5 Cr |
| 5.00 | Providing, laying and spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC cement and 3.50% Emulsion in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 5,838 | Cum | 2,485.35 ₹1.5 Cr | 2,200 ₹1.3 Cr | 6,065 ₹3.5 Cr | 5,000 ₹2.9 Cr | 4,850 ₹2.8 Cr | 5,844 ₹3.4 Cr | 4,600 ₹2.7 Cr |
| 6.00 | Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 58,382 | Sqm | 7.81 ₹4.6 L | 9 ₹5.3 L | 10 ₹5.8 L | 10 ₹5.8 L | 5.5 ₹3.2 L | 9 ₹5.3 L | 8.7 ₹5.1 L |
| 7.00 | Providing and laying bituminous concrete with higher capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 2,335 | Cum | 7,456.05 ₹1.7 Cr | 17,500 ₹4.1 Cr | 10,000 ₹2.3 Cr | 10,500 ₹2.5 Cr | 8,550 ₹2.0 Cr | 9,909 ₹2.3 Cr | 9,800 ₹2.3 Cr |
| 8.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 2,972 | Cum | 85.21 ₹2.5 L | 120 ₹3.6 L | 90 ₹2.7 L | 55 ₹1.6 L | 90 ₹2.7 L | 120 ₹3.6 L | 115 ₹3.4 L |
| 9.00 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material (U type drain, HP culvert & RCC culvert) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 2,824 | Cum | 71.01 ₹2.0 L | 100 ₹2.8 L | 83 ₹2.3 L | 55 ₹1.6 L | 40 ₹1.1 L | 54 ₹1.5 L | 97 ₹2.7 L |
| 10.00 | P. C.C. with M15 cement , coarse sand and 4 cm gauge Dalla grit including all taxes , royalty and including supply of martial , labour and T&P etc. required for proper completion of work as per direction of E/I . (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 217 | Cum | 3,621.51 ₹7.9 L | 5,790 ₹12.6 L | 5,000 ₹10.8 L | 4,000 ₹8.7 L | 4,500 ₹9.8 L | 540 ₹1.2 L | 5,120 ₹11.1 L |
Tender Value
₹10.8 Cr
EMD Value
₹21.5 L
Closing Date
22 Apr 2025, 12:00 pmClosed
SE, Vns Circle, PWD, Varanasi
SE, Vns Circle, PWD, Varanasi
Chhittampur Km-1 se Rajwari Via Dharauhra Ch 0-000 se 10-615 ke Widening evm Strengthening ka karya
2025_CEUVZ_1026348_1
1551/183 Com-Vns Circle/2025-26 Dated 01-04-2025
Open Tender
Civil Works
360 days
Varanasi
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,590
₹21.5 L
Yes
SE, Vns Circle, PWD, Varanasi
4 Feb 2026
9 Apr 2025
22 Apr 2025
9 Apr 2025
22 Apr 2025
9 Apr 2025
9 Apr 2025
Amount
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of Embankment with Material Deposited from Roadway Cutting: Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of Embankment with Material obtained from Right of way: Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing, laying, spreading and compacting of existing granular material adding cement and admixture using truck mounted / self propelled cement spreader shall have variable working width with microprocessor, controlled spray rate through augers and cellular wheels. The aggregate shall be in situ pulverized/stabilize using four wheeled drive recycler having working depth up to 50 cm with variable depth control system. Compacting with vibratory roller to achieve design unconfined compressive strength.(with additive) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing, laying and spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC cement and 3.50% Emulsion in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and laying bituminous concrete with higher capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material (U type drain, HP culvert & RCC culvert) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
P. C.C. with M15 cement , coarse sand and 4 cm gauge Dalla grit including all taxes , royalty and including supply of martial , labour and T&P etc. required for proper completion of work as per direction of E/I . (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
RCC Grade M20 using batching plant transit mixer & Concrete pump ( M-20 Grade) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Sand Filling in Foundation Trenches as per Drawing & Technical Specification MORT&H Specification No-304 (Sr. No-12.3) ( HP culvert & RCC culvert) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. ( HP culvert & RCC culvert) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. ( HP culvert & RCC culvert) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Struck pointing with cement mortar consisting 1 part cement and 2 parts of sand of 1.25 fineness modulus including supply of all materials labour and T&P etc. required for proper completion of the work. As per SOR No-574 ( HP culvert & RCC culvert) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing & laying HP 600mm dia NP-3 with coller etc. complete. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing & laying HP 1000mm dia NP-3 with coller etc. complete. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
RCC Grade M25 using batching plant transit mixer & Concrete pump (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing weep holes in brick masonry/ stone masonry plain/ reinforced concrete abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structure slope of 1(V) 20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 As per SOR No-MORD 600/12.9 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Running of 5HP pump for dewatering including arrangement of pump suction and delivery pipes and other accessories at site including cost of POL As Per SOR NS (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
SAHIL ENTERPRISES (BID ID -5125056)
SAINIK CONSTRUCTION PVT LTD (BID ID -5127177)
M/S RAJ CONSTRUCTION (BID ID -5136323)
APS AND COMPANY PRIVATE LIMITED (BID ID -5137378)
UMA ASSOCIATES INFRATECH DEVELOPERS PVT LTD (BID ID -5132567)
DESCON INFRASTRUCTURES PRIVATE LIMITED (BID ID -5136120)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.28 MB
Tenderdocument.pdf
Tender Documents • 0.15 MB
Tenderdocument_2.pdf
Tender Documents • 0.30 MB
Tenderdocument_3.pdf
Tender Documents • 30.44 MB
Download all tender documents and submit your bid