Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC | ₹2.3 L | L1 | Accepted-AOC All requirement documents have been submitted in the bid and the lowest price has been quoted. |
| 2 | Rejected-Technical | - | - | Rejected-Technical Work Experiance has not been submitted |
| Sl No | Description | Qty | Unit | RAVINDRA KUMAR SAW L1 |
|---|---|---|---|---|
| 1.00 | Preparatory work, cutting and dismantling of iron materials (Joist plate, i-cross section beam, etc) | 2 | Job | 28,536 ₹57,072 Lowest |
| 2.00 | Cutting of structure, Adjustment/alignment of weighbridge platform and joist as per size | 2 | Job | 19,392 ₹38,784 Lowest |
| 3.00 | Welding of deck plate and joist with complete assembling and fitting | 2 | Job | 12,512 ₹25,024 Lowest |
| 4.00 | Painting of complete deck plate | 2 | Job | 2,464 ₹4,928 Lowest |
| 5.00 | Cost of oxygen | 16 | Nos | 550 ₹8,800 Lowest |
| 6.00 | Cost of electrodes | 20 | Kg | 1,520 ₹30,400 Lowest |
| 7.00 | Cost of primer | 16 | Ltr. | 290 ₹4,640 Lowest |
| 8.00 | Cost of anti corrosion paint | 27 | Ltr. | 350 ₹9,450 Lowest |
| 9.00 | Cost of MS Nut & Bolts | 25 | Kg | 115 ₹2,875 Lowest |
| 10.00 | Cost of Washer | 9 | Kg | 90 ₹810 Lowest |
Tender Value
₹2.7 L
EMD Value
₹3,400
Closing Date
20 Nov 2025, 5:00 pmClosed
PE(EnM) TTKOCP
Tetariakhar OCP Balumath Latehar Jharkhand
Repairing/Overhauling weighing platform and reinforcement joist of 40Te and 50Te electronic road weighbridges installed at Tetarikhar OCP under Rajhara Area.
2025_CCL_347050_1
PE(EnM)/TTK/NIT/2025-26/14 dtd. 08.11.2025
Open Tender
Electrical and Maintenance Works
Item Rate
20 days
Tetariakhar OCP
As per NIT
2 documents required · 2 mandatory
₹3,400
16 Jan 2026
8 Nov 2025
21 Nov 2025
8 Nov 2025
20 Nov 2025
8 Nov 2025
8 Nov 2025 - 19 Nov 2025
Amount
Preparatory work, cutting and dismantling of iron materials (Joist plate, i-cross section beam, etc)
Cutting of structure, Adjustment/alignment of weighbridge platform and joist as per size
Welding of deck plate and joist with complete assembling and fitting
Painting of complete deck plate
Cost of oxygen
Cost of electrodes
Cost of primer
Cost of anti corrosion paint
Cost of MS Nut & Bolts
Cost of Washer
Gas cutting set charge
Welding machine charge
Grinding machine charge
Heavy duty crane charges
Labour Charges- Skilled Manpower (1noX6days)
Semi-Skilled Manpower (2nosX6days)
Un-Skilled Manpower (3noX6days)
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.44 MB
BOQ_359742.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .