Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 126 JULEDHA SARDHANA SARDHANA MEERUT UTTAR PRADESH 250342 | MEERUT | UTTAR PRADESH | 250342 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
11 May 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC-2
Pallavpuram
BUSINESS PLAN EDD2 MEERUT UNDER EDC-2 MEERUT
2022_PVVNL_695139_1
23/EDC-2/MT/2022-23
Open Tender
Electrical Works
Lump-sum
180 days
EDD 2
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EDC-2
₹6,000
13 May 2022
30 Apr 2022
11 May 2022
30 Apr 2022
11 May 2022
30 Apr 2022
180 days
Amount
Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 40 Km. :–
A) 250 KVA Transformer
B) Line Material such as ABC bunch concuctor 3 x 95
C) 11 KV XLPE cable 3 x 120 sq.mm.
Cartage of following material from JE Store to site of work including loading & unloading at both ends maximum distance up to 40 Km. :– A) 250 KVA Transformer
B) Line Material such as ABC bunch conductor 3 x 95
C) 11 KV XLPE cable 3 x 120 sq.mm.
Construction of plinth for 250 KVA T/F of size 3x2.5 mtr x 1 mtr. Including excavation of earth, brick work, CC work, plastering and all required work for plinth
Providing and fixing of wire mess fanceing around the plinth of size 3x2.5 mtr x 1 mtr.
Water level earthing after providing of G.I pipe 32mm Dia and MS. Flat 35x5mm up to 20 mtr depth complet work in all respect.
Removal of following T/F from double pole including opening of HT side jumper and cable from LT side of T/f :- A)100 KVA Transformer
Placing of following T/F on newly constructed plinth including fixing PVC cable at LT side and making the jumpers of HT side properly :- A) 250 KVA Transformer
Removal Damaged and burnt ABC bunch conductor.
Laying lifting & sagging of ABC bunch conductor 3 x 95
Digging the cable trunch for 3x120 XLPE cable
Laying of 11KV XLPE 3x120 sqmm. Cable
Resagging of loose span
Cutting & Chopping of tree branches near and over the line
Fixing of 11 KV TPMO on existing double pole including jumpering of HT side after providing and fixing the required clamps with bolt and nut
Providing & fixing of clamp
Providing & fixing of Nut Bolt
Back Cartage of removed following T/f old & used from site to store centre meerut including laoding and unloading at both end :- A) 100 KVA Transformer
Line Material such as damaged ABC bunch conductor 3 x 95 and XLPE 3x120 11KV cable scrape
M/S ABID CONTRACTOR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .