| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 LAccepted-AOC | ₹8.6 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹8.9 L+₹36,310 (4.24%)Rejected-AOC | ₹8.9 L+₹36,310 (4.24%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | K M PALANISAMY AND CO L1 | Shree Saravana Contructions L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation in hard stiff clay,black cotton, hard red earth, shales,murrams, ordinary gravel stoney earth mixed with 50% fair sized boulders etc.,with an initial lead of 10m and lift of 2m. and as directed by Officers. (TP DATA - MAIN DATA) For Foundation First depth of 0 to 2 m FOR HSC, HRE | 23 | cum | 263 ₹6,049 Lowest | 300 ₹6,900 |
| 2.00 | FOR DMR | 36 | cum | 644 ₹23,184 Lowest | 675 ₹24,300 |
| 3.00 | Filling with clean M.Sand complying with standard specification including watering ramming and consolidation etc.,complete and as directed by Officers. Sand filling | 4 | cum | 1,855 ₹7,420 Lowest | 1,900 ₹7,600 |
| 4.00 | Levelling coarse in cement concrete 1:4:8 (one cement,four sand and eight aggregate) using 40mm hard broken stone for foundation and leveling coarse including cost of all materials, mixing,placing, ramming, curing, finishing etc., complete and as directed by Officers. PCC Laying (beyond 1.5 m and upto 4.5 m from GL) | 4 | cum | 5,663 ₹22,652 Lowest | 5,700 ₹22,800 |
| 5.00 | Reinforced Cement Concrete with M30 Design Mix for the following members excluding the cost of reinforcement and fabricating, centering, shuttering and strutting charges but including the cost of all materials, mixing, placing in position, lifting, vibrating, finishing & curing, etc. complete.and as directed by Officers. Beyond 1.50 m & upto 4.50 m below GL | 12 | cum | 9,267 ₹1,11,204 Lowest | 9,300 ₹1,11,600 |
| 6.00 | Reinforced Cement Concrete with M30 Design Mix for the following members excluding the cost of reinforcement and fabricating, centering, shuttering and strutting charges but including the cost of all materials, mixing, placing in position, lifting, vibrating, finishing & curing, etc. complete.and as directed by Officers. Upto 1.50 m Below GL | 4 | cum | 9,267 ₹37,068 Lowest | 9,300 ₹37,200 |
| 7.00 | Upto 4.50 m above GL from GL | 8 | cum | 9,408 ₹75,264 Lowest | 9,450 ₹75,600 |
| 8.00 | Supply and erection of steel centering,shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG 10 stiffened with MS angle of size 25 X 25 X 3mm for boarding laid over Silver Oak joists of size 10cm X 6.5cm space at 10cm c/c and supported by Casurino Props 10cm - 13cm spaced at 75cm c/c etc.,complete and as directed by Officers. For 0.00 to 3.30 M (Plane Surface) | 9 | sqm | 1,085 ₹9,765 Lowest | 1,125 ₹10,125 |
| 9.00 | For 0.00 to 3.30 M (Curved Surface) | 106 | sqm | 1,627 ₹1,72,462 Lowest | 1,650 ₹1,74,900 |
| 10.00 | For 0.00 to 3.30 M (FOR ROUND COLUMN) FOR CIRCULAR COLUMN | 2 | sqm | 2,170 ₹4,340 Lowest | 2,200 ₹4,400 |
Tender Value
₹10.5 L
EMD Value
₹10,500
Closing Date
19 Sept 2025, 3:00 pmClosed
Executive Officer
113/153 Kavindapadi Main Road Pethampalayam Townpanchayat
Construction of 40000 Litres capacity Sump Ward No Karukampalayam in Pethampalayam Town Panchayat.
2025_DTP_603464_1
401/2025
Open Tender
Civil Works
Works
180 days
Pethampalayam Townpanchayat
AS Per Norms
2 documents required · 2 mandatory
₹0
₹10,500
8 Apr 2026
12 Sept 2025
19 Sept 2025
12 Sept 2025
19 Sept 2025
12 Sept 2025
12 Sept 2025 - 19 Sept 2025
Amount
Earthwork excavation in hard stiff clay,black cotton, hard red earth, shales,murrams, ordinary gravel stoney earth mixed with 50% fair sized boulders etc.,with an initial lead of 10m and lift of 2m. and as directed by Officers. (TP DATA - MAIN DATA) For Foundation First depth of 0 to 2 m FOR HSC, HRE
FOR DMR
Filling with clean M.Sand complying with standard specification including watering ramming and consolidation etc.,complete and as directed by Officers. Sand filling
Levelling coarse in cement concrete 1:4:8 (one cement,four sand and eight aggregate) using 40mm hard broken stone for foundation and leveling coarse including cost of all materials, mixing,placing, ramming, curing, finishing etc., complete and as directed by Officers. PCC Laying (beyond 1.5 m and upto 4.5 m from GL)
Reinforced Cement Concrete with M30 Design Mix for the following members excluding the cost of reinforcement and fabricating, centering, shuttering and strutting charges but including the cost of all materials, mixing, placing in position, lifting, vibrating, finishing & curing, etc. complete.and as directed by Officers. Beyond 1.50 m & upto 4.50 m below GL
Reinforced Cement Concrete with M30 Design Mix for the following members excluding the cost of reinforcement and fabricating, centering, shuttering and strutting charges but including the cost of all materials, mixing, placing in position, lifting, vibrating, finishing & curing, etc. complete.and as directed by Officers. Upto 1.50 m Below GL
Upto 4.50 m above GL from GL
Supply and erection of steel centering,shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG 10 stiffened with MS angle of size 25 X 25 X 3mm for boarding laid over Silver Oak joists of size 10cm X 6.5cm space at 10cm c/c and supported by Casurino Props 10cm - 13cm spaced at 75cm c/c etc.,complete and as directed by Officers. For 0.00 to 3.30 M (Plane Surface)
For 0.00 to 3.30 M (Curved Surface)
For 0.00 to 3.30 M (FOR ROUND COLUMN) FOR CIRCULAR COLUMN
For 3.30 to 4.30 M (Plane Surface)
For 3.30 to 4.30 M (Curved Surface)
Supplying, fabricating and placing in position of RTS rods for reinforcement including cost of steel and binding wire, labour charges etc., complete for RCC works and as directed by Officers. Upto 16 mm dia
Providing and fixing of cut stone (Rough dressed) set in CM 1:3 of size 0.45 X 0.45 X 0.15M at site including cost of all materials, labour charges, curing etc., complete and as directed by Officers. Cut Stone arrangements
Providing RCC Ventilator of 0.15 m dia using 20mm HBG stone including cost of all materials, centering, shuttering, strutting,reinforcement, placing of concrete, finishing, curing and fixing in position on the roof slab with mosquito proof net arrangement and etc.,complete and as directed by officers.
Supply,Delivery and fixing of CI Manhole frame with cover of following size including cost of all materials, fixing of MS clamps,Bolt and nuts etc.,complete and as directed by Officers. Size 0.60m x0.60m
Providing pipe connection work for SR .Rate including supply & laying of pipes, specials and valves etc., complete and as directed by Officers. (Separate Sheet)
Colour washing two coats using emulsion paint including cost of cement paint cost of all materials, labour charges, etc., complete and as directed by Officers. Officers.
Supplying and fixing in position of RCC in side access ladder of following size using 20mm size HBS jelly including cost of all materials, centering, shuttering,strutting,fabrication and placing in position of reinforcement, finishing, curing etc.,complete and as directed by Officers. For the Sump
Provision for supply & fixing of MS ladder including Painting etc. complete.
Refilling the foundation with excavated Soil (other than sand) in layers of not more than 15cm thick, watering, well ramming, consolidating, complying with standard specification and as directed by Officers.
Shree Saravana Contructions (BID ID -1464839)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_721402.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
BOQ_721402.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .