Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹36.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹37.5 L+₹1.1 L (2.92%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹38.7 L+₹2.2 L (6.04%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹39.6 L+₹3.2 L (8.69%)Admitted-Fee/PreQual/Technical/Finance NOT EXPLICITLY MENTIONED IN THE DOCUMENT FOR THIS COMPANY | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Unbalance Additional Perfromance Security Not submitted as per ENIT |
Tender Value
₹45.8 L
EMD Value
₹91,540
Closing Date
14 May 2026, 4:00 pmClosed
XEN PWD REASI
XEN PWD REASI
Construction of Elementary Building Less Schools at Govt. PS DADAGALA District Reasi under SAMAGRA SHIKSHA PAB 2025-26
2026_PWDJK_308658_1
e-NIT No.06 of 2026-27 Dated 25-04-2026
Open Tender
Civil Works
Percentage
240 days
Reasi
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
XEN PWD REASI
₹91,540
30 May 2026
25 Apr 2026
16 May 2026
25 Apr 2026
14 May 2026
25 Apr 2026
25 Apr 2026 - 11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 149.53 | Cum | 592.9 | ₹88,656.34 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed All kinds of soil : | - | Cum | 479.3 | - |
| 3 | providing and laying in position specified grade excluding the cost of centering & shuttering – All work upto plinth level. 1:4:8 (1 Cement: 4 Coarse Sand: 8 graded stone aggregates. | 23.04 | Cum | 5,202.9 | ₹1,19,874.82 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 16.47 | Cum | 7,788.4 | ₹1,28,274.95 |
| 5 | providing and laying in position specified grade excluding the cost of centering & shuttering – All work upto plinth level. 1:3:6 (1 Cement: 3 Coarse Sand: 6 graded stone aggregates. 20 % stone boulders. | 52.38 | Cum | 4,818.1 | ₹2,52,372.08 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 42.61 | cum | 9,821.85 | ₹4,18,509.03 |
| 7 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 8.22 | Cum | 9,395.7 | ₹77,232.65 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo Mechanically Treated bars of grade Fe-500D or more | 4,837 | kgs | 123.2 | ₹5,95,918.4 |
| 9 | Centering /Shuttering for concrete works including strutting proping and removal of same. Foundations, footings, bases for columns etc for mass concrete | 191.56 | Sqm | 286.35 | ₹54,853.21 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form forLintel, beams, plinth beams, girders, bressumers and cantilevers | 112.03 | Sqm | 577.55 | ₹64,702.93 |
stage.html
html • 0.02 MB
finance_999996.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_999996.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .