| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC | ₹1.9 L | L1 | Accepted-AOC accepted |
| 2 | L2₹2.8 LRejected-AOC | ₹2.8 L | L2 | Rejected-AOC rejected |
| Sl No | Description | Qty | Unit | CK BUILDERS L1 | RM Constructions L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work open excavation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. Complying with Standard Specifications as per SS 20 A MORTH 24 & 25 | 28.6 | M3 | 168.08 ₹4,807.09 | 168.08 ₹4,807.09 |
| 2.00 | Removal of Excavated Earthwork as per Standard Specification etc complete., | 17.16 | M3 | 55.9 ₹959.24 | 55.9 ₹959.24 |
| 3.00 | Plain Cement Concrete 1:4:8 Mix (one part cement, four part sand and Eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with Standard Specifications as per TNDSS No. 28 V, VI (S2) V,VI (S5A) VII | 2.86 | M3 | 4,827.26 ₹13,805.96 | 4,827.26 ₹13,805.96 |
| 4.00 | Supplying and erecting centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface such as RCC slabs rectangular beams all beams lintels etc., centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10 cm to 13 cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86. | 99 | M2 | 287.72 ₹28,484.28 | 500 ₹49,500 |
| 5.00 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. | 11.88 | M3 | 6,252.82 ₹74,283.50 | 6,252.82 ₹74,283.50 |
| 6.00 | Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. TNDSS NO: 30 V, VI (S3), VII-3. | 3.96 | M3 | 8,346.46 ₹33,051.98 | 8,346.46 ₹33,051.98 |
| 7.00 | Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3. | 420 | kg | 88 ₹36,960 | 250 ₹1.1 L |
| 8.00 | Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete. | 13.2 | M2 | 158.37 ₹2,090.48 | 158.37 ₹2,090.48 |
Tender Value
₹2.4 L
EMD Value
₹2,350
Closing Date
18 Mar 2024, 3:00 pmClosed
Executive Officer
Karimangalam Town Panchayat
Maintenance of Drain at Morappur road near Ramasamy Kovil in Karimangalam Town Panchayat
2024_DTP_446765_1
107/2024/a1
Open Tender
Civil Works
90 days
Karimangalam Town Panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,350
Yes
Karimangalam Town Panchayat
7 May 2026
11 Mar 2024
19 Mar 2024
11 Mar 2024
18 Mar 2024
11 Mar 2024
15 Mar 2024
Amount
Earth work open excavation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. Complying with Standard Specifications as per SS 20 A MORTH 24 & 25
Removal of Excavated Earthwork as per Standard Specification etc complete.,
Plain Cement Concrete 1:4:8 Mix (one part cement, four part sand and Eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with Standard Specifications as per TNDSS No. 28 V, VI (S2) V,VI (S5A) VII
Supplying and erecting centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface such as RCC slabs rectangular beams all beams lintels etc., centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10 cm to 13 cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86.
Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge.
Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. TNDSS NO: 30 V, VI (S3), VII-3.
Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3.
Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete.
RM Constructions (BID ID -1038119)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_532020.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid