| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAccepted-AOC | L1 | Accepted-AOC low | |
| 2 | L2₹11.6 L+₹7,700.16 (0.67%)Rejected-Finance | L2 | Rejected-Finance HIGH |
| Sl No | Description | Qty | Unit | K.ADHIKESAVAN L1 | DURAI L2 |
|---|---|---|---|---|---|
| 1.00Providing Cement Concrete Pavement with RCC Slab Culvert at Avanavadi Arunthathiyar Palaiyam in Vengaram-Avanavadi Panchayat | |||||
| 2.00 | Earth work excavation for foundation and depositing on bank with initial lead of 10 mts and initial lift of 2.0 in hard stiff clay stiff black cotton soil, hard red earth shales, murram, gravel, stoney earth and earth mixed with 50% fair sized boulders and gravelly soil etc., complete for boxing as per IS 20A. | 8.8 | Cu.m | 112 ₹985.6 Lowest | 130 ₹1,144 |
| 3.00 | Base course concrete with C.C.1:4:8 mix using 40mm I.S.S. size HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing for base course as per standared specification. | 84.7 | Cu.m | 4,961 ₹4,20,196.7 Lowest | 5,000 ₹4,23,500 |
| 4.00 | Centering and shuttering for sides including cost and convayance and labour charges etc complete. | 121 | Cu.m | 318 ₹38,478 Lowest | 320 ₹38,720 |
| 5.00 | Cement Concrete Pavement with C.C.1:2:4 HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing, laying compacting, etc., complete | 68.48 | Sqm | 6,324 ₹4,33,067.52 Lowest | 6,350 ₹4,34,848 |
| 6.00Culvert | |||||
| 7.00 | Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation | 8.42 | Cu.m | 224 ₹1,886.98 Lowest | 250 ₹2,106 |
| 8.00 | Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges,etc, | 1.4 | Cu.m | 4,961 ₹6,945.4 Lowest | 5,000 ₹7,000 |
| 9.00 | Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete. | 5.02 | Cu.m | 5,289 ₹26,550.78 Lowest | 5,300 ₹26,606 |
| 10.00 | Supplying and erecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angle | 17.13 | Cu.m | 477 ₹8,171.01 Lowest | 500 ₹8,565 |
Tender Value
Refer Docs
EMD Value
₹11,741
Closing Date
11 Mar 2024, 6:00 pmClosed
BlockDevelopmentOfficer(V.Pt), VandavasiBlock,
BlockDevelopmentOfficer(V.Pt), VandavasiBlock,
Providing Cement Concrete Pavement with RCC Slab Culvert at Avanavadi Arunthathiyar Palaiyam in Vengaram-Avanavadi Panchayat in Vandavasi Block of Tiruvannamalai District under AGAMT 2024-2025
2024_RDTN_439056_1
1246/2024/A13-1 Dt28.02.2024 Vengaram Avanavadi Arunthathiyar cc
Open Tender
Civil Works
Lump-sum
180 days
BlockDevelopmentOfficer(V.Pt), VandavasiBlock
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹11,741
Yes
2 Sept 2025
5 Mar 2024
11 Mar 2024
5 Mar 2024
11 Mar 2024
5 Mar 2024
Amount
Providing Cement Concrete Pavement with RCC Slab Culvert at Avanavadi Arunthathiyar Palaiyam in Vengaram-Avanavadi Panchayat
Earth work excavation for foundation and depositing on bank with initial lead of 10 mts and initial lift of 2.0 in hard stiff clay stiff black cotton soil, hard red earth shales, murram, gravel, stoney earth and earth mixed with 50% fair sized boulders and gravelly soil etc., complete for boxing as per IS 20A.
Base course concrete with C.C.1:4:8 mix using 40mm I.S.S. size HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing for base course as per standared specification.
Centering and shuttering for sides including cost and convayance and labour charges etc complete.
Cement Concrete Pavement with C.C.1:2:4 HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing, laying compacting, etc., complete
Culvert
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges,etc,
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete.
Supplying and erecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angle
Above GL
Supply and fabrication of steel for RCC items including all cost and conveyance of steel, labour charges for cutting, binding, tying to shape, etc,
Reinforced Cement Concrete 1:1.2:3mix using 20 mm size ISS HBG metal including cost and conceyance of all materials and to site labour charges, etc, complete
Cement Concrete 1:2:4 mix using 20 mm size ISS HBG metal including cost and conceyance of all materials and to site labour charges, etc, complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
DURAI
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .