| 1 | Admitted-Fee/PreQual/Technical/Finance DHEMOMAIN COLLIERY PO BARADHEMO DIST BURDWAN WEST BENGAL 713367 | 713367 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.1 L
EMD Value
₹10,100
Closing Date
5 Feb 2025, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Area Engineer(EnM)
Sodepur Area,Area Engineer(EnM)
1. Enagagement of Contractual Manpower for miscellaneous Engineering job at Dhemomain PIT Colliery. 2.Enagagement of Contractual Manpower for miscellaneous
2025_ECL_326508_1
ECL/SDPA/AE(EnM)/e-T/24-25/995
Open Tender
Miscellaneous Works
Item Rate
35 days
Sodepur Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,100
7 Feb 2025
22 Jan 2025
7 Feb 2025
22 Jan 2025
5 Feb 2025
22 Jan 2025
22 Jan 2025 - 25 Jan 2025
Amount
Items Description
Engagement of contractual manpower for miscellaneous Engineering job at Dhemomain PIT Colliery under Sodepur Area
Lowering and fitting of complete 16 links track link assembly and liking of breakdown track link assembly for SDL,- 611-952 of Dhemomain Pit Colliery.
Lowering and fitting of complete 16 links track link assembly and lifting of breakdown track link assembly for SDL.- 611-972 of Dhemomain Pit Colliery
Lowering and fitting of traction motor of SDL 611-972.
Lowering and fitting of hydraulie pump of SDL 611- 972
Recapping of North side winding rope
Recapping of south side winding rope
Dismantling of Warm shaft, drum, lifting of warm shaft from -1L/7D carron Haulage to surface for fitting bearing, fitting of brass bush bearing at haulage site, Fitting of Warm and thrust bearing, Sent Warm shaft to haulage site and fitting of Warm shaft.
Transportation of 300 Amp/SSOV District all main switch from surface to 1SWL/2SR and lifting of b/d Switch to surface for repairing.
Lowering & Fitting of traction motor of SDL 611-952
Lowering and fitting of hydraulic pump of SDL 611-952
Transportation of 100 HP motor from surface to - 1L/7D Carron Haulage site and Lifting of 100 HP b/d motor from -1L/7D to surface.
Transportation of Tugger drum from surface to 16R/14L tugger haulage site and lifting of breakdown drum up to surface for repairing.
Manual transportation and laying of 200 mt 70 sq. mm power cable from surface to BGML drift up to 450 mt for roof bolting at BGML drift
Transportation of 100 mt 70 sq. mm power cable manually from BGML drift to pit bottom and from pit bottom to working district by haulage evacuation system.
Engagement of contractual manpower for miscellaneous Engineering job at Dhemomain PIT Colliery under Sodepur Area
Lowering and fitting of complete 32 links track link assembly and lifting of breakdown track link assembly for SDL- 611-952 of Dhemomain Pit Colliery.
Lowering and fitting of complete 32 links track link assembly and lifting of breakdown track link assembly for SDL- 611-972 of Dhemomain Pit Colliery
Lowering & Fitting of traction motor of SDL 611-972
Lowering and fitting of hydraulic pump of SDL 611-952
Lifting of thrust/arm unit and after fitting bearing, transporting and fitting at haulage.
Shifting of SDL 611-972 from 13L (W)/29-30R loading point to 13L (W)/32-33R loading point
Transportation of MLA-8 from surface to IL/(E) D pump site and lifting of b/d pump.
Shifting of SDL 611-952 from 13L (E)/29-28R loading point to 13L(E)/27-26R loading point
Transportation of Voldrum tugger haulage bedplate,Voldrum tugger drum, 40 HP Tugger motor and necessary electricals from 12L/29R to 11 L/29R( manually) and fitting at 11L/29R, new tugger site. Shifting of Voldrum tugger haulage is required for establishment of new loading point at 12L for development of rise side property of 12L.
Lowering of 13D MLA 5 500 GPM pump from 15L/13D to 16L/13D (shifting of pump, bedplate, motor, all electricals including fitting of delivery and suction pipe)
Overhead cost & Others
Add: CMPF @ 12%
Add: Bonus @ 8.33%
Add: Pension @ 7%
Total impact of GST for the purpose of CTC
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .