Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.9 LAccepted-AOC | 1 | Accepted-AOC The lowest rate quoted by the contractor KUMAR WORK CONTRACTOR | |
| 2 | 2₹6.1 L+₹17,664.09 (2.98%)Rejected-Finance | 2 | Rejected-Finance Higher bidder value |
| Sl No | Description | Qty | Unit | BHARATHI L2 | KUMAR WORK CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by TWAD board Officers | 6.49 | cum | 271 ₹1,758.79 | 263 ₹1,706.87 Lowest |
| 2.00 | P.C.C 1:4:8 (one cement, four sand and eigth course aggregate) using 40 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the TWAD Board Officers. | 0.64 | cum | 5,505 ₹3,523.2 | 5,345 ₹3,420.8 Lowest |
| 3.00 | Earth filling in basement & sides of foundation with excavated earth including ramming and consolidation etc., complete | 2.89 | cum | 47 ₹135.83 | 46 ₹132.94 Lowest |
| 4.00 | Supply and filling the foundation and basement with M.sand in layers complying with standard specification including consolidation and watering etc. complete and as directed by TWAD Board Officers. | 0.93 | cum | 1,789 ₹1,663.77 | 1,737 ₹1,615.41 Lowest |
| 5.00Brick work in CM 1:5 (one cement and five sand) using country bricks of size 8.75" X 4.25" X 2.00" including cost of all materials, labour charges, curing etc., complete and as directed by TWAD Board Officers. | |||||
| 6.00 | For foundation and basement | 4.23 | cum | 6,284 ₹26,581.32 | 6,101 ₹25,807.23 Lowest |
| 7.00 | For super structure | 3.39 | cum | 6,380 ₹21,628.2 | 6,194 ₹20,997.66 Lowest |
| 8.00 | Reinforced cement concrete 1 : 1 1/2: 3(one cement,oneand half sand and three coarse aggregate)using 20mm size hard broken stone jelly(machine crushed) for the following members.The rate to excludethe cost of steel for reinforcement,centering,shuttering, strutting but includingcost of mixing of concrete,placing,vibrating with Mechanical Vibrator, finishing and curing etc. complete and as directed by TWAD Board Officers. | 0.58 | cum | 9,338 ₹5,416.04 | 9,066 ₹5,258.28 Lowest |
| 9.00 | Steel centering for soffits of RCC members including shuttering,strutting to the centring and providing supports etc.complete for the following members using MS Sheets of size 90cm x 60cm and BG 10 Gaugesstiffened with welded MS angles of size 25 x 25 x3mm laid over Silver Oak(country wood) joists of size 10 x 6.5 cm (spaced at about 90cm C/C) and supported by Casurania props of 10 cm to 13 cm dia. spaced at 75 cm C/C and as directed by TWAD Board Officers.The centring materials should be supplied and should be removed after the specified stripping time of the concrete as per IS 456/1978. | 5.31 | sqm | 563 ₹2,989.53 | 547 ₹2,904.57 Lowest |
| 10.00 | Plastering with C.M. 1:5(One part of cement and Five parts of sand) with 12mm thick over brickwork portion including labour charges for mixing finishing and curing etc., complete and as directed by TWAD Board Officers. | 38.5 | sqm | 290 ₹11,165 | 282 ₹10,857 Lowest |
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
16 Dec 2025, 3:00 pmClosed
Block Development officer BP Acharapakkam
Block Development office BP Acharapakkam
Providing Pumping Main Pipeline 90 mm dia, Pump Room and Motor to Vinayaganallur Colony in Vedanthanagal Panchayat in Acharapakkam Panchayat Union
2025_RDTN_630486_1
DIPR/1011/CDP A5
Open Tender
Civil Works
Item Rate
90 days
vedanthangal
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,000
Yes
Block Development office BP Acharapakkam
7 Jan 2026
9 Dec 2025
16 Dec 2025
9 Dec 2025
16 Dec 2025
9 Dec 2025
9 Dec 2025
Amount
Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by TWAD board Officers
P.C.C 1:4:8 (one cement, four sand and eigth course aggregate) using 40 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the TWAD Board Officers.
Earth filling in basement & sides of foundation with excavated earth including ramming and consolidation etc., complete
Supply and filling the foundation and basement with M.sand in layers complying with standard specification including consolidation and watering etc. complete and as directed by TWAD Board Officers.
Brick work in CM 1:5 (one cement and five sand) using country bricks of size 8.75" X 4.25" X 2.00" including cost of all materials, labour charges, curing etc., complete and as directed by TWAD Board Officers.
For foundation and basement
For super structure
Reinforced cement concrete 1 : 1 1/2: 3(one cement,oneand half sand and three coarse aggregate)using 20mm size hard broken stone jelly(machine crushed) for the following members.The rate to excludethe cost of steel for reinforcement,centering,shuttering, strutting but includingcost of mixing of concrete,placing,vibrating with Mechanical Vibrator, finishing and curing etc. complete and as directed by TWAD Board Officers.
Steel centering for soffits of RCC members including shuttering,strutting to the centring and providing supports etc.complete for the following members using MS Sheets of size 90cm x 60cm and BG 10 Gaugesstiffened with welded MS angles of size 25 x 25 x3mm laid over Silver Oak(country wood) joists of size 10 x 6.5 cm (spaced at about 90cm C/C) and supported by Casurania props of 10 cm to 13 cm dia. spaced at 75 cm C/C and as directed by TWAD Board Officers.The centring materials should be supplied and should be removed after the specified stripping time of the concrete as per IS 456/1978.
Plastering with C.M. 1:5(One part of cement and Five parts of sand) with 12mm thick over brickwork portion including labour charges for mixing finishing and curing etc., complete and as directed by TWAD Board Officers.
Special ceiling plastering for RCC Slab with C.M.1:3(One part of cement and Three parts of sand) 10mm thickover RCC surface including labour charges for mixing finishingand curing etc., complete as directed by TWAD Board Officers.
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Supply and fixing of MS door (Single leaf) of sizes 1.00 x 2.00m in MS angle 50 x 50 x 4mm and MS flat 35 x 6mm with MS sheet of 18 gauge including ventilating arrangements using 20mm square MS rods with locing arrangements including two coats of approved enamel painting over one coat of primer
Supply, fabricating and fixing in position of RTS rods including cost of steel and binding wire etc., complete.
Supply and fixing of RCC box type jolly of size 0.6 x 0.45 m
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
White washing two coats using fine screened shell lime for the new plastered surface for inner and outer side of the room including the cost of materials labour charges etc., complete and as directed by TWAD Board Officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Earth work excavation in all types of soil lead And lift ss 20 B etc complete Including All Labour Charges Including Cost and Conveyance etc Complete. .(1.00mx0.60mx1.05m)
Supply and Following of 90mm dia PVC Pipe Including Cost and Conveyance etc Complete. 6 KSC
Supply and Fixing of PVC Pipe Including Cost and Conveyance etc Complete
Refilling excavated earth Including All Labour Charges Including Cost and Conveyance etc Complete.
Supply and delivery of clear water vertical wet type Three phase submersible pump 5.00 HP conforming to IS034/2002 and as amended thereafter and BEE 3 Star Rated capable of discharging noted LPM against head of water column due to all causes. The pump shall be with stainless steel shaft and dynamically balanced bronze or Cast SS impeller, brass screws and CI FG 200 grade pump bowl/diffuser with ISI mark. The pump shall be directly coupled to a continuos rated two pole suitable wet type vertical squirrel cage induction motor suitable for operation in AC single phase 230V+/- 10 %,50 HZ +/-5 %
Labour charges for the erection of submersible pumpset in borewell/openwell including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days
Supply and delivery of three Phase panel board.D.O.L with two level guard and auto start
Supply and Delivery Of 50 mm HDPE Pipe Including all the labour charges etc.compete.
Supply and Following of 3Core 4.00Sqr mm Submersible Cable Including Cost and Conveyance etc Complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
BHARATHI (BID ID -1533581)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_753923.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_753923.xls
BOQ • 0.32 MB
Technical.pdf
Tender Documents • 1.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .