Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.3 LAdmitted-Finance | -7.21% | ₹22.3 L | L1 | Admitted-Finance |
| 2 | L2₹24.8 L+₹2.6 L (11.6%)Admitted-Finance | +3.55% | ₹24.8 L+₹2.6 L (11.6%) | L2 | Admitted-Finance |
| 3 | L3₹25.7 L+₹3.4 L (15.3%)Admitted-Finance | +7.00% | ₹25.7 L+₹3.4 L (15.3%) | L3 | Admitted-Finance |
| 4 | L4₹25.8 L+₹3.5 L (15.7%)Admitted-Finance | +7.40% | ₹25.8 L+₹3.5 L (15.7%) | L4 | Admitted-Finance |
| 5 | L5₹28.3 L+₹6.0 L (27.2%)Admitted-Finance A1 PANCHARATNA APPT CHENDHRE ALIBAG RAIGAD MAHARASHTRA 402201 | RAIGAD | MAHARASHTRA | 402201 | +17.99% | ₹28.3 L+₹6.0 L (27.2%) | L5 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
10 Jul 2026, 10:30 amClosed
DGM CC
Contract Cell Dept., Admin. Bldg., RCF Thal Factory, Alibag, Raigad - 402208
CONTRACT FOR REPAIRING AND MAINTENANCE OF FACTORY BOUNDARY WALL FOR THE YEAR 2026-27 AT RCF THAL
2026_RCFL_913815_1
TH/CC/89333/26/D24-09(XVI)/318
Open Tender
Civil Works
Works
548 days
RCF Thal Alibag
Please refer Tender documents.
13 documents required · 13 mandatory
₹0
Exempted
21 Sept 2026
19 Jun 2026
10 Jul 2026
19 Jun 2026
10 Jul 2026
19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | EXCAVATION FOR FOUNDATION UPTO 1.50 M LIFT INCLUDING REMOVING THE EXCAVATED MATERIALS UPTO A DISTANCE OF 50 METRES BEYOND THE BUILDING AREA AND LIFT AS SPECIFIED, STACKING AND SPREADING, NECESSARY DEWATERING UNLESS PROVIDED ELSEWHERE, PREPARING THE BED FOR THE FOUNDATION AND REQUIRED BACKFILLING, RAMMING, WATERING, SHORING AND STRUTTING ETC. COMPLETE AS DIRECETD IN EARTH, SOILS OF ALL TYPES, SAND, GRAVEL AND SOFT MURUM. | 50 | CUM | 239 | ₹11,950 |
| 2 | PROVIDING DRY/TRAP/GRANITE/QUARTZITE/GNEISS RUBBLE STONE SOLING 15 CM TO 20 CM THICK INCLUDING HAND PACKING AND COMPACTING COMPLETE. | 40 | CUM | 1,382 | ₹55,280 |
| 3 | DISMANTLING STONE MASONRY IN LIME OR CEMENT INCLUDING STACKING THE MATERIALS AS DIRECTED WITH ALL LEADS, LIFTS, COMPLETE. | 60 | CUM | 380 | ₹22,800 |
| 4 | PROVIDING & LAYING IN SITU CEMENT CONCRETE IN GRADE 1:3:6 (M-10) (CEMENT CONSUMPTION 4.4 BAGS/CUM) OF TRAP METAL FOR FOUNDATION AND BEDDING, INCLUDING BAILING OUT WATER MANUALLY, FORMWORK, COMPACTING AND CURING. | 20 | CUM | 5,247 | ₹1,04,940 |
| 5 | PROVIDING & LAYING IN SITU CEMENT CONCRETE IN GRADE 1:2:4 (M-15) (CEMENT CONSUMPTION 6.4 BAGS/CUM) OF TRAP METAL FOR COPING AND BEDDING AT MID HEIGHT/PARAPET LEVEL OF STONE/BRICK MASONRY AS DIRECTED BY EIC, INCLUDING FORMWORK, COMPACTING AND CURING ETC. COMPLETE. | 10 | CUM | 5,723 | ₹57,230 |
| 6 | PROVIDING UNCOARSED RUBBLE MASONRY OF TRAP / GRANITE / GNEISS / STONES IN CEMENT MORTAR 1:6 IN FOUNDATION AND PLINTH OF INNER WALLS / IN PLINTH OF EXTERNAL WALLS INCLUDING BAILING OUT WATER, STRIKING JOINTS ON UN EXPOSED FACES AND WATERING COMPLETE. (RCF RUBBLE TO BE RECOVERED AS PER NIT) | 50 | CUM | 5,025 | ₹2,51,250 |
| 7 | PROVIDING UNCOARSED RUBBLE MASONRY OF TRAP / GRANITE / GNEISS / STONES IN CEMENT MORTAR 1:6 IN SUPERSTRUCTURE INCLUDING RACKING OUT JOINTS WHEN PLASTERING IS TO BE DONE / STRIKING JOINTS WHEN NO PLASTERING IS TO BE DONE WATERING AND SCAFFOLDING COMPLETE. (RCF RUBBLE TO BE RECOVERED AS PER NIT) | 200 | CUM | 5,534 | ₹11,06,800 |
| 8 | PROVIDING FLUSH POINTING WITH CEMENT MORTAR 1:3 FOR STONE MASONRY INCLUDING SCAFFOLDING AND CURING COMPLETE. | 1,000 | SQM | 182 | ₹1,82,000 |
| 9 | PROVIDING SECOND CLASS BURNT BRICK MASONRY WITH CONVENTIONAL/I.S. TYPE BRICKS IN CEMENT MORTAR 1:5 IN SUPERSTRUCTURE INCLUDING STRIKING JOINTS, RACKING OUT JOINTS, WATERING AND SCAFFOLDING COMPLETE. | 10 | CUM | 7,755 | ₹77,550 |
| 10 | PROVIDING CEMENT PLASTER 12 MM THICK IN SINGLE COAT IN CEMENT MORTAR 1:4 WITHOUT NEERU FINISH TO STONE/BRICK MASONRY, IN ALL POSITIONS INCLUDING SCAFFOLDING AND CURING COMPLETE. | 150 | SQM | 249 | ₹37,350 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.28 MB
BOQ_960337.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .