| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹31.8 LAccepted-AOC | ₹31.8 L | L-1 | Accepted-AOC L1 |
| 2 | L-2₹32.5 L+₹75,200.59 (2.37%)Rejected-Finance | ₹32.5 L+₹75,200.59 (2.37%) | L-2 | Rejected-Finance Refer Minutes |
| 3 | L-3₹37.8 L+₹6.0 L (18.8%)Rejected-Finance WEST JYOTINAGAR URVASI PATH H NO 16 BAMUNIMAIDAM GUWAHATI 21 | GUWAHATI | ASSAM | ₹37.8 L+₹6.0 L (18.8%) | L-3 | Rejected-Finance Refer Minutes |
| 4 | L-4₹37.9 L+₹6.2 L (19.4%)Rejected-Finance | ₹37.9 L+₹6.2 L (19.4%) | L-4 | Rejected-Finance Refer Minutes |
| 5 | Rejected-Technical | - | - | Rejected-Technical Refer Minutes |
| Sl No | Description | Qty | Unit | MS UNIQUE CONSTRUCTION AND SUPPLY L3 | Sri Dinesh Goswami L4 | MADHU SUDAN BAISHYA L2 | GOPAL DEKA L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | (A) Boundary Wall with M.S. Gate : - 2.6:Earth work in excavation by mechanical means(Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth,1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth,lead up to 50 m and lift up to 1.5 m,as dorected by Engineer-in-Charge: 2.6.1: All kinds of soil | 146.93 | Cum | 207.5 ₹30,488.64 | 208.53 ₹30,639.57 | 178 ₹26,153.54 | 174.63 ₹25,658.75 Lowest |
| 2.00 | 4.1 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work up to plinth level: 4.1.5: – 1:3:6 (1 cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources). | 8.12 | Cum | 6,901.73 ₹56,042.08 | 6,935.9 ₹56,319.52 | 5,945 ₹48,273.4 | 5,808.39 ₹47,164.13 Lowest |
| 3.00 | 5.1 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement – All work up to plinth level: 5.1.2 – 1:1.5:3 (1 cement 1.5 coarse sand (zone III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 38.53 | Cum | 8,447.84 ₹3,25,495.35 | 8,489.66 ₹3,27,106.72 | 7,277 ₹2,80,382.81 | 7,109.57 ₹2,73,931.73 Lowest |
| 4.00 | 5.3 : Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases above plinth level floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement :1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregates 20 mm nominal size derived from natural sources). | 16.58 | Cum | 10,826.49 ₹1,79,503.25 | 10,880.09 ₹1,80,391.88 | 9,325 ₹1,54,608.5 | 9,111.4 ₹1,51,067.09 Lowest |
| 5.00 | 5.9 : Centering and shuttering including strutting, propping etc. and removal of form for : 5.9.1 : Foundations, footing, bases of columns, etc. for mass concrete. | 46.98 | Sqm | 311.03 ₹14,612.17 | 312.57 ₹14,684.5 | 268 ₹12,590.64 | 261.76 ₹12,297.37 Lowest |
| 6.00 | 5.9.5 : Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 182.07 | Sqm | 614.43 ₹1,11,869.91 | 617.48 ₹1,12,423.72 | 529 ₹96,315.03 | 517.1 ₹94,147.94 Lowest |
| 7.00 | 5.9.6 : Columns, Pillars,Piers, Aboutments, Posts and Struts. | 238.05 | Sqm | 812.29 ₹1,93,366.23 | 816.31 ₹1,94,323.49 | 699 ₹1,66,396.95 | 683.61 ₹1,62,733.96 Lowest |
| 8.00 | 16.12 : Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete. 16.12.1 : With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 | 179.1 | Sqm | 613.27 ₹1,09,837.02 | 616.31 ₹1,10,380.76 | 528 ₹94,564.8 | 516.12 ₹92,437.09 Lowest |
| 9.00 | 6.1 : Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in : 6.1.1 : Cement mortar 1:4 (1 cement 4 coarse sand) | 12.82 | Cum | 6,950.82 ₹89,109.51 | 6,985.23 ₹89,550.65 | 5,987 ₹76,753.34 | 5,849.7 ₹74,993.15 Lowest |
| 10.00 | 6.13 : Half brick masonry with common burnt clay F.P.S. ( non modular) bricks of class designation 7.5 in superstructure above plinth level up floor V level. 6.13.2 : Cement mortar 1:4 ( 1 cement : 3coarse sand). | 205.2 | Sqm | 1,028.23 ₹2,10,992.9 | 1,033.32 ₹2,12,037.42 | 886 ₹1,81,807.2 | 865.34 ₹1,77,568.28 Lowest |
Tender Value
₹37.4 L
EMD Value
₹74,767
Closing Date
18 Sept 2025, 2:00 pmClosed
EE
EE office Bamunimaidam Ghy-21
Construction of Boundary Wall with MS Gate and Upgradation of 2 (two) storied RCC ADCI office Building Jonai Dist Dhemaji
2025_ICD_47070_1
EEG/73/79/Pt-I/170-172/513-519 dt 27/08/2025
Open Tender
Civil Works
Item Rate
150 days
ADCI office Jonai Dhemaji
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,200
₹74,767
Yes
1 Nov 2025
29 Aug 2025
18 Sept 2025
29 Aug 2025
18 Sept 2025
6 Sept 2025
29 Aug 2025 - 18 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .