| 1 | 1₹26.5 LAccepted-AOC | ₹26.5 L Quoted ₹29.9 L | 1 | Accepted-AOC low the price so accepted |
| 2 | Rejected-Technical | - | - | Rejected-Technical TECHNICALLY NOT QUALIFIED |
| Sl No | Description | Qty | Unit | R SELLAKANNU L1 | D palaniammal L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc., complete - Open Earth Work Excavation Foot path | 41 | m3 | 93.45 ₹3,831.45 Lowest | 95 ₹3,895 |
| 2.00 | Supplying and filling in foundation and basement with Stone Dust in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. Foot path | 9 | m3 | 251.52 ₹2,263.68 Lowest | 260 ₹2,340 |
| 3.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification Foot path | 9 | m3 | 4,870.5 ₹43,834.5 Lowest | 4,875 ₹43,875 |
| 4.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - For plane surfaces such as rectangular or square RCC columns, sunshades, top and bottom slab of RCC boxing, etc.toilet column | 12 | m2 | 281.5 ₹3,378 Lowest | 286 ₹3,432 |
| 5.00 | foot path | 236 | m2 | 1,131.5 ₹2,67,034 Lowest | 1,140 ₹2,69,040 |
| 6.00 | toilet slab | 16 | m2 | 943 ₹15,088 Lowest | 946 ₹15,136 |
| 7.00 | septic tank slab | 3 | m2 | 943 ₹2,829 Lowest | 946 ₹2,838 |
| 8.00 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requirements of IS standards. - Upto Basement toilet | 5 | m3 | 7,834.5 ₹39,172.5 Lowest | 7,840 ₹39,200 |
| 9.00 | septic tank | 0.4 | m3 | 7,715.04 ₹3,086.02 Lowest | 7,715.04 ₹3,086.02 Lowest |
| 10.00 | Supply and fabrication of steel required for all RCC items of works involved in the schedule, cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as as per design given and specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc complete as per standard specification toilet | 0.47 | MT | 88,873.5 ₹42,214.91 Lowest | 88,873.5 ₹42,214.91 Lowest |
Tender Value
₹26.5 L
EMD Value
₹26,530
Closing Date
12 Feb 2026, 3:00 pmClosed
THE COMMISSIONER
ATTUR MUNICIPALITY
Providing Park at State Bank colony Near NH 79 ward no 2 TS No1 14 in Attur Municipality
2026_MAWS_653486_1
1938/2024/E1
Open Tender
Civil Works - Others
Works
45 days
ATTUR MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹26,530
9 Sept 2026
9 Feb 2026
12 Feb 2026
9 Feb 2026
12 Feb 2026
9 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc., complete - Open Earth Work Excavation Foot path | 41 | m3 | - | - |
| 2 | Supplying and filling in foundation and basement with Stone Dust in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. Foot path | 9 | m3 | 1 | ₹9 |
| 3 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification Foot path | 9 | m3 | 2 | ₹18 |
| 4 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - For plane surfaces such as rectangular or square RCC columns, sunshades, top and bottom slab of RCC boxing, etc.toilet column | 12 | m2 | 3 | ₹36 |
| 5 | foot path | 236 | m2 | 4 | ₹944 |
| 6 | toilet slab | 16 | m2 | 5 | ₹80 |
| 7 | septic tank slab | 3 | m2 | 6 | ₹18 |
| 8 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requirements of IS standards. - Upto Basement toilet | 5 | m3 | 7 | ₹35 |
| 9 | septic tank | 0.4 | m3 | 8 | ₹3.2 |
| 10 | Supply and fabrication of steel required for all RCC items of works involved in the schedule, cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as as per design given and specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc complete as per standard specification toilet | 0.48 | MT | 9 | ₹4.27 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_783618.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
BOQ_783618.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .