Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹95,933.61Admitted-Finance | ₹95,933.61 | L1 | Admitted-Finance |
| 2 | L2₹98,811.62Admitted-Finance | ₹98,811.62 | L2 | Admitted-Finance |
| 3 | L3₹1.0 LAdmitted-Finance | ₹1.0 L | L3 | Admitted-Finance |
Tender Value
₹1.2 L
EMD Value
₹2,398
Closing Date
31 Jan 2026, 6:00 pmClosed
Pradhan, Todey Tangta GP
Todey Tangta Gram Panchayat
Construction of Toilet near Gumba at Bindu
2025_GTA_981591_3
PR/TTGP/ e-NIT/12(15CFC)/2025-26
Open Tender
CIVIL WORKS
25 days
Bindu, Todey Tangta GP
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2,398
12 Feb 2026
24 Jan 2026
3 Feb 2026
24 Jan 2026
31 Jan 2026
24 Jan 2026
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1.500 mm.
Laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small piecec in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth
Cost of boulder 150 mm size delivered and stacked at site
Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes. (b) River bazree.
Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes. (ii) River bazree.
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction. (a) For works in foundation, basement and up to roof of ground floor/up to 4m. Tor steel/Mild steel. other than SAIL/TATA/RINL/JSW/JSPL/Shyam/SRMB/ISSL/BMASL/Electrosteel
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor). (a) 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of the Engineer-in-charge. .
Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface]. (i) with 1:6 cement mortar. (c)15 mm. thick plaster.
Neat cement Punning about 1.5 mm thick in wall dado etc
Labour Cess @ 1 % including GST
Please Enable Macros to View BoQ information
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_2430484.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid