Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹52.4 L
EMD Value
₹1.0 L
Closing Date
12 May 2026, 4:00 pmClosed
Executive Engineer RnB Division Budgam
engineering complex budgam
Construction of Sr. Secondary ACR at GHSS Budgam
2026_PWDJK_309218_1
NIT_No_10_DB_2026-27
Open Tender
Civil Works
Percentage
120 days
Budgam
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,600
Executive Engineer RnB Division Budgam
₹1.0 L
13 May 2026
2 May 2026
13 May 2026
2 May 2026
12 May 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanicall means in trenches for foundations, drains, pipes, cables etc.upto required depthh and size, including dressing of sides and ramming of bottoms, including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soil | 91.83 | Cum | 256.85 | ₹23,586.54 |
| 2 | Providing and laying of stone soling, hand packed, including carriage of same from approved source upto site of work complete. Av lead of 30 kms | 15.74 | Cum | 1,000 | ₹15,740 |
| 3 | P/ L in position cement concrete in 1:4:8(1 cement :4 coarse sand : 8 graded crushed stone aggregate, 40mm nominal size) excluding the cost of centering and shuttering. | 14.35 | Cum | 5,202.9 | ₹74,661.61 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 21.53 | Cum | 5,733.6 | ₹1,23,444.41 |
| 5 | Reinforced cement concrete work in 1: 1.5 : 3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20mm nominal size)excluding the cost of centering, shuttering, finishing and reinforcement but including carriage of all materials from approved sources upto site of work complete. | 33.58 | Cum | 7,788.4 | ₹2,61,534.47 |
| 6 | Reinforced cement concrete work in 1: 1.5 : 3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20mm nominal size)excluding the cost of centering, shuttering, finishing and reinforcement but including carriage of all materials from approved sources upto site of work complete. | 56.88 | Cum | 9,821.85 | ₹5,58,666.83 |
| 7 | Reinforcement for RCC work including straightening cutting, bending, placing in position and binding all complete (Thermo mechanically treated bars) including all carriages complete. | 10,945.66 | Kgs | 123.2 | ₹13,48,505.31 |
| 8Centering & shuttering including strutting, propping etc including removal of form work. | |||||
| 8.01 | Foundations, footings, bases for columns, plinth | 73.1 | Sqm | 286.35 | ₹20,932.19 |
| 8.02 | Walls (anythickness) including attached pilasters, buttresses, plinthand string courses etc. | 76.44 | Sqm | 628.95 | ₹48,076.94 |
stage.html
html • 0.03 MB
finance_1001193.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_1001193.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .