Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC 7C GOVIND NAGAR MATHURA | MATHURA | MATHURA | ₹2.1 Cr | L1 | Accepted-AOC Preparation Bond for Rs. 20878020.88 Only |
| 2 | L2₹2.2 Cr+₹6.2 L (2.99%)Rejected-Finance 64 SHANKAR MARRIAGE HOME WEST ARJUN NAGAR AGRA | AGRA | AGRA | UTTAR PRADESH | ₹2.2 Cr+₹6.2 L (2.99%) | L2 | Rejected-Finance Rejected due to higher Rates |
| 3 | Rejected-Technical BARABANKI | UTTAR PRADESH | 225001 | - | - | Rejected-Technical Technical Bid Non responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technical Bid Non responsive |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technical Bid Non responsive |
Tender Value
₹3.5 Cr
EMD Value
₹19.5 L
Closing Date
19 Dec 2025, 12:30 pmClosed
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
Widending and Strenghtning work of Gatholi to Puchari link road (ODR) of Dharmarth Yojana in Distt. Mathura
2025_CEAGR_1097105_1
5377/14M-AC/2025 dated 17-11-2025
Open Tender
Civil Works
Percentage
365 days
Mathura
Widending and Strenghtning work
2 documents required · 2 mandatory
₹2,360
₹19.5 L
Yes
Agra
25 Mar 2026
12 Dec 2025
19 Dec 2025
12 Dec 2025
19 Dec 2025
12 Dec 2025
15 Dec 2025
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. As per MORT&H Specification No. 301 (3.6).
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
Construction of embankment with approved material obtained from borrow pits all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. as per MoRT&H clause 305 (3.16) & as directed by Engineer Incharge including all machinery charges & including all labour, T&P etc required for proper completion of the work. (Carted Earth)
Providing, laying spreading & compacting of granular sub-base by providing coarse graded (Gr-1) materials, spreading in uniform layers with Motor Grader on prepared surface, mixing by mix in placed method with Rotovator at OMC and compacting with in layers with smooth wheeled Vibratory Roller to achieve the desired density, complete and including all machinery charges & including all labour, T&P etc required for proper completion of the work. as directed by Engineer Incharge. As per MoRT&H clause 401(b).
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MoRT&H Specification 406.
Providing & applying Primer Coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spreading primer at the rate of 0.70 Kg./Sqm. Using machanical means. Before Applying prime coat, the surface will be cleaned with Mechanical broom and water will also be sprinkled with water tanker to keep the surface Moist. The Prime coat will be applied 24 hrsbefore the application of bituminous course including all Taxes, Material, Labour, T&P etc required for proper completion of the work.
Providing and laying dense graded bituminous macadam 100-120 TPH HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
Providing & applying Tack Coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 Kg./Sqm. on the prepared primed granular/old painted surface, cleaned with Mechanical broom, including all Taxes, Material, Labour, T&P etc required for proper completion of the work. (For BC)
Providing and laying Bituminous Concrete with 100-120 TPH HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grade premixed with bituminous binder VG-30 @ 5.40% of mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with to the required grade, level and alignment, rolling with smooth Wheeled vibratory & Tandom Rollars to acheive the desired compaction as per MORT&H Specifications clause 509 Complete in all respects.
Consolidation of machine crushed stone ballast of approved quarry of 53~22.4 mm size to water bound macadam of G-3 specification including spreading in uniform thickness, hand packing rolling with power roller 8 to 10 tonnes in stages to proper grade and camber applying and brooming with crushable screening material i.e. stone dust to fill-up the interstices of coarse aggregate, watering & rolling making necessary earthen bund to protect edges, lighting, guarding, barricadding etc. including the cost of all materials, labour, T & P etc. required for proper completion of work. as per MORT&H specifications no 404 (4.9) .
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with approved grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. As per MORT&H Specification No. 6.02 (602).
Construction of Drain, & Hume Pipe Culvert Plain Cement cement concrete in 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate) nominal mix in Foundation and crushed stone aggregate 40 mm nominal size machenically mixed, placed in foundation and compected. As per S.I. No. 12.04
Reinforced Cement Concrete (M-20) in Open Foundation complete as per Drawing and Technical Specifications Clause 1500, 1700 & 2100: As per SOR Chapter 6 S.I. No.12.08 C Case I
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth/Above level (Thermo-Mechanically Treated bars of grade Fe-500D or more.). As per DSR S.I. No. 5.22.6
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:. As per DSR S.I. No. 6.1.1
Pointing with cement mortar (1:3) on brickwork in substructure as per drawing and technical specification Clauses 1300 & 2200. As per SOR Chapter 6 S.I. No.13.02
Plastering with cement mortar 1:3 on brick work in sub-structure complete as per drawing and Technical Specifications Clauses 1300 & 2200. As per SOR Chapter 6 S.I. No 13.03
Plain Cement Concrete (PCC Grade M15) in Open Foundation complete as per Drawing and Technical Specifications. Clause 1500, 1700 & 2100. As per S.I. No. 12.08 A ase II
Supply and laying & fixing of 350mm dia NP-3 Hume Pipe in proper alignment, joint filling and slopes etc. Complete as dwawing and technical specification.
Supply and laying & fixing of 600mm dia NP-3 Hume Pipe in proper alignment, joint filling and slopes etc. Complete as dwawing and technical specification.
Supply and laying & fixing of 1000mm dia NP-3 Hume Pipe in proper alignment, joint filling and slopes etc. Complete as dwawing and technical specification.
Maintainance Charge including @ All Items total work amount etc as per Direction of E/I for the period of Five Years from the actual completion of work. (Total work amount-34199282.70)
Maintainance of First Year (@0.00% of Total Work Amount of item 1 to 21)
Maintainance of Second Year (@ 0.25% of Total Work Amount of item 1 to 21)
Maintainance of Third Year (@ 0.50% of Total Work Amount of item 1 to 21)
Maintainance of Fourth Year (@ 0.75% of Total Work Amount of item 1 to 21)
Maintainance of Fifth Year (@ 1% of Total Work Amount of item 1 to 21)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.82 MB
BOQ_2023661.xls
BOQ • 0.31 MB
1T2_GantholiPuchhari.pdf
Tender Documents • 2.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .