| 1 | L1₹1.9 CrAdmitted-Finance 753 G 6 ANANTHAM NAGAR E B COLONY SOUTH MANTHITHOPPU ROAD KOVILPATTI 628 501 | KOVILPATTI | THOOTHUKUDI | TAMIL NADU | 628501 | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical EMD Not Matching |
| Sl No | Description | Qty | Unit | BK BAALAA AND CO L1 |
|---|---|---|---|---|
| 1.00Line works | ||||
| 1.01 | Clearing juliflora jungle without uprooting including all cost of labour, lead, lift etc complete. | 2,250 | sqm | 7 ₹15,750 Lowest |
| 2.00 | Labour charges for removal of large trees | 15 | Nos. | 180 ₹2,700 Lowest |
| 3.00 | Conducting check survey,pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead lift etc complete. | 11 | Locs | 2,000 ₹22,000 Lowest |
| 4.00 | Earthwork excavation in hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead lift etc complete. | 225 | cum | 250 ₹56,250 Lowest |
| 5.00 | Earthwork excavation in soft disintegrated rock or kankar not requiring blasting. | 225 | cum | 350 ₹78,750 Lowest |
| 6.00 | Earthwork excavation in MR and DMR not requiring blasting. | 450 | cum | 400 ₹1,80,000 Lowest |
| 7.00 | Earth work excavation in hard rock including contol blasting and stacking | 450 | cum | 1,500 ₹6,75,000 Lowest |
| 8.00 | Earth work excavation in hard rock measured in solid including Wedging & Cheisling | 150 | cum | 3,000 ₹4,50,000 Lowest |
| 9.00 | Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour,fuel,oil,transport etc complete | 248 | Hours | 300 ₹74,400 Lowest |
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
29 Nov 2022, 2:00 pmClosed
CE/TP-II/Trichy
The Chief Engineer, Transmission Projects II, Periyamilaguparai, Near Collectorate, Trichy - 1.
Erection of 110 KV SC line on DC tower with panther conductor from Nanguneri 230 KV SS (Common point D) to Existing Kalakadu 110KV SS.
2022_EB_258458_1
CE/TP-II/TRY/C-25/22-23
Open Tender
Civil Works
Works
120 days
Nanguneri
As per Tender Specification
4 documents required · 4 mandatory
₹0
₹1.6 L
Yes
9 Dec 2022
26 Oct 2022
30 Nov 2022
26 Oct 2022
29 Nov 2022
26 Oct 2022
Amount
Line works
Clearing juliflora jungle without uprooting including all cost of labour, lead, lift etc complete.
Labour charges for removal of large trees
Conducting check survey,pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead lift etc complete.
Earthwork excavation in hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead lift etc complete.
Earthwork excavation in soft disintegrated rock or kankar not requiring blasting.
Earthwork excavation in MR and DMR not requiring blasting.
Earth work excavation in hard rock including contol blasting and stacking
Earth work excavation in hard rock measured in solid including Wedging & Cheisling
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour,fuel,oil,transport etc complete
Providing shoring and shuttering in foundation using wooden planks and scantling including all cost of materials, labour, lead, lift etc complete.
Supply and fixing of stub and cleat using levelling instrument with supply of template and assembling at site and shifting the template from loc to loc including cost of all materials for template ,labour, fabrication charges etc complete.
For QD tower
Transporting and fixing of stub and cleat using levelling instrument with supply of template and assembling at site and shifting the template from loc to loc including cost template ,labour, fabrication charges etc complete.(Stub only supplied by department)
KCR tower
HCR tower
GCR tower
PCC 1:4:8 using 40mm metal (machine crushed) for foundation without formwork including cost of all materials lead lift etc complete.
PCC 1:3:6 using 40mm metal(machine crushed) for foundation without formwork including cost of all materials lead lift etc complete.
PCC 1:2:4 using 20mm metal for foundation & chimney , chimney, DP coping with formwork including cost of all materials lead lift etc complete.
RCC 1:1.5:3 using 12-20mm metal with formwork for tower & chimney including cost of formwork, materials labour lead lift etc complete.
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting bending tying and fixing in position as per specification including cost of all materials lead lift cost of binding wire etc complete
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete.
Supply,Providing pipe type earthing including necessary excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost of materials, lead, lift etc complete.(as per std specification)
Supply,Transport and erection of GI tower/tower extension angles ,square cross arm including cost of materials, T &P,labour, lead, lift etc complete.as per approved drawing , BOM and standard specification.
MS tower parts
HT tower parts
Transport and erection of GI tower angles including cost of all T &P,labour, lead, lift etc complete.as per standard specification.
Supply and fixing of hot dipped glavanised iron Bolt and Nut, packing washers,Spring washers, conforming to IS 2427/1988, and IS 387 part XIII of latest issue including cost of materials, lead,lifts,etc,complete.
Transport and Labour charges for Hoisting of 7 units of 90kN suspension insulators with all allied hardwares and necessary fittings , including cost of Hardware fittings, etc,complete.
without PA rod
With PA rod
Transport and Labour charges for Hoisting of 8 units of 120kN suspension insulators with all allied hardwares and necessary fittings , including cost of Hardware fittings, etc,complete.
Lowering the HT/LT Line during stringing of power conductor and earthwire stringing and restringing the same in original position including labour,lead ,lift etc complete
Providing special type trussels for major and minor road crossing including cost of all materials,labour, lead lift etc. Complete.
Providing ordinary bamboo trussels along the line line while carrying-out the stringing work to avoid damages to the conductor including cost of all materials,labour, lead lift etc. Complete.
supply and Labour charges for fixing of number plates, danger board,phase plate(R,Y,B) including all cost of materials,labour transport,lead, lift,etc complete
Supply,fabrication and fixing of name board with 18 gauge plate including cost of materials, labour for writing name of the line etc complete.(1.2m*0.45m size)
Transport of 3 Nos of Panther conductor ,paying out, jointing,rough sagging, tensioning, clipping, providing vibration dambers for tension locations, MSJ,U bolt,D Shackle and repair sleeve wherever necessary including giving jumper connection for power conductor including transport charges, providing trussels wherever necessary loading unloading major and minor t&Ps lead lift etc complete.(including all fittings)
Single span with LC
Single span without LC
Continuous span without LC
Transport of 7/3.55mm earthwire , paying out, jointing, rough sagging, tensioning, including giving jumber connection including Supply of all Hardware Fittings ,transport charges, loading unloading,major and minor t&Ps, lead lift etc complete.
Single span with LC
Single span without LC
Continuous span without LC
PCC 1:2:4 using 20mm metal for muffing coping concrete with form work and plastering including cost of all materials,labour, lead, lift,etc complete .
Painting with two coats of anticorrosive paint over tower leg at a height of 45cm including all cost of materials,labour, lead lift etc complete
Providing temporary guys at tension location at both sides during stringing of new wire including all cost of earth work, hire charges for turn buckle, anchor pieze, cost of stay wire, refilling labour etc and watch ward if required etc complete.
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.
Removal of surplus earth in a low lying area As per the direction of Engineer-incharge at site.
Providing special type earthing arrangements for terminal tower including necessary excavation for fixing 3m long 50mm dia GI "B" class pipe, 60cm dia with 5cm shell thick of RCC Collar and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost pf materials, lead, lift etc., complete.as per standard specification.
Supplying, fabrication and erection of bird guard in transmission tower including cost of all materials lead lift etc complete.
Supplying, fabrication and erection of bird flapper in transmission line including cost of all materials lead lift etc complete.
SGST & CGST (If applicable quote the value, if not enter '0')
IGST (If applicable quote the value, if not enter '0')
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_305638.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .