Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 LAccepted-AOC | ₹2.5 L | 1 | Accepted-AOC Less than the Estimate Amount |
| 2 | 2₹2.5 LRejected-Finance | ₹2.5 L | 2 | Rejected-Finance More than the Estimate Amount |
| Sl No | Description | Qty | Unit | SRI MOOKAMBIGAI CONSTRUCTIONS L1 | V.R.MURUGAN L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation in all soils and sub soils except in hard rock requiring blasting and depositing on bank with initial lead of 10m and initial lift of 2m inclusive of shoring, shuttering, bailing out water wherever necessary, refilling the foundation with excavated earth other than sandy soil in layers of not more than 150mm thick layers well rammed and depositing the surplus earth within the compound in place shown by the departmental officers and clearing and levelling the site etc,. complete. | 20 | M3 | 115 ₹2,300 | 118 ₹2,360 |
| 2.00 | Plain Cement concrete 1:4:8 [one cement, four M-sand and eight course aggregates] using 40mm size Hard Broken/Machine crushed Granite Stone Jelly including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification. | 20 | M3 | 5,410 ₹1.1 L | 5,450 ₹1.1 L |
| 3.00 | Plain Cement Concrete M20 (Nominal Mix) using 20mm and 10mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, expansion joint (bitumen bad)soft water, labour charges for mixing, transporting, laying and curing concrete working at depths, Hire charges for Tools and plants for cement pavement work etc.. complete as per relevant standard specifications, | 20 | M3 | 7,029 ₹1.4 L | 7,050 ₹1.4 L |
| 4.00Add G.S.T. @ 18% | |||||
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
5 Feb 2026, 3:00 pmClosed
Assistant Commissioner
Zone 4 Murugampalayam
Providing of CC Pavement at Vanjipalayam AD Colony 1st street in ward no 40
2026_MAWS_646862_25
E1/0034/2026/Z4
Open Tender
Civil Works
90 days
Tcmc Zone 4
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,000
9 Apr 2026
25 Jan 2026
5 Feb 2026
25 Jan 2026
5 Feb 2026
25 Jan 2026
Earthwork excavation for foundation in all soils and sub soils except in hard rock requiring blasting and depositing on bank with initial lead of 10m and initial lift of 2m inclusive of shoring, shuttering, bailing out water wherever necessary, refilling the foundation with excavated earth other than sandy soil in layers of not more than 150mm thick layers well rammed and depositing the surplus earth within the compound in place shown by the departmental officers and clearing and levelling the site etc,. complete.
Plain Cement concrete 1:4:8 [one cement, four M-sand and eight course aggregates] using 40mm size Hard Broken/Machine crushed Granite Stone Jelly including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification.
Plain Cement Concrete M20 (Nominal Mix) using 20mm and 10mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, expansion joint (bitumen bad)soft water, labour charges for mixing, transporting, laying and curing concrete working at depths, Hire charges for Tools and plants for cement pavement work etc.. complete as per relevant standard specifications,
Add G.S.T. @ 18%
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.62 MB
BOQ_775656.xls
BOQ • 0.34 MB
25TCW40.pdf
Tender Documents • 0.88 MB
Download all tender documents and submit your bid