| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAdmitted-Finance | ₹1.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.0 Cr+₹2.8 L (2.73%)Admitted-Finance | ₹1.0 Cr+₹2.8 L (2.73%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S SUNDARI L1 | K GUBENDRAAN S AND CO L2 |
|---|---|---|---|---|---|
| 1.00Name Of Work : Providing Paver block in Church to school @ pannaipatti village in Pothampatti | |||||
| 2.00 | Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation. | 22.5 | Sqm | 96.6 ₹2,173.5 Lowest | 100 ₹2,250 |
| 3.00 | Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete. | 15 | cum | 4,682.68 ₹70,240.2 Lowest | 4,682.68 ₹70,240.2 Lowest |
| 4.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum | 39 | cum | 5,368.72 ₹2,09,380.08 Lowest | 5,368.72 ₹2,09,380.08 Lowest |
| 5.00 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., | 260 | Sqm | 416 ₹1,08,160 Lowest | 600 ₹1,56,000 |
| 6.00 | Construction granular sub base providing material 25mm to 4.75mm IRC HBG metal @ 65% 4.75 to 2.36mm IRC HBG metal @ 20%& 2.36mm below IRC HBG metal @ 15% spreading in uniform layers with motor grader on prepared surface mix in place method with rotovator at OMC and compacting with three wheel | 82.5 | Sqm | 1,481.49 ₹1,22,222.93 Lowest | 1,481.49 ₹1,22,222.93 Lowest |
| 7.00 | Supply and laying inter locking paver block 80/60 mm thick of Required shape in cement mortar 1:2 using 10-12mm size HBG stone jelly including cost of centering shuttering laying vibrating finishing curing land the cost include transporting charges etc completed | 825 | Sqm | 657 ₹5,42,025 Lowest | 658.28 ₹5,43,081 |
| 8.00Name Of Work : Providing Cement concrete road in 2nd street @ pannaipatti village in Pothampatti | |||||
| 9.00 | Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation. | 8.64 | Sqm | 96.6 ₹834.62 Lowest | 96.6 ₹834.62 Lowest |
| 10.00 | Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete. | 16.56 | cum | 4,682.68 ₹77,545.18 Lowest | 4,682.68 ₹77,545.18 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.0 L
Closing Date
22 Jul 2022, 3:00 pmClosed
ADDITIONAL COLLECTOR (D) MADURAI
0/0 ADDITIONAL COLLECTOR (D) DRDA MADURAI
Providing Interlocking CC Paver blocks and other improvements to the Streets and Lanes _17 nos. in AGAMT-II-2021-22 Village panchayats of Usilampatti Block in Madurai District in Package no.USI_01
2022_RDTN_239715_1
568/2022/D7 /usi01/24.06.22
Open Tender
Civil Works
Item Rate
usilampatti
REFER TENDER DOCUMENT
4 documents required · 4 mandatory
₹0
₹1.0 L
1 Aug 2022
6 Jul 2022
22 Jul 2022
6 Jul 2022
22 Jul 2022
7 Jul 2022
Amount
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Construction granular sub base providing material 25mm to 4.75mm IRC HBG metal @ 65% 4.75 to 2.36mm IRC HBG metal @ 20%& 2.36mm below IRC HBG metal @ 15% spreading in uniform layers with motor grader on prepared surface mix in place method with rotovator at OMC and compacting with three wheel
Supply and laying inter locking paver block 80/60 mm thick of Required shape in cement mortar 1:2 using 10-12mm size HBG stone jelly including cost of centering shuttering laying vibrating finishing curing land the cost include transporting charges etc completed
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement concrete 1:2:4 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement concrete 1:2:4 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Construction granular sub base providing material 25mm to 4.75mm IRC HBG metal @ 65% 4.75 to 2.36mm IRC HBG metal @ 20%& 2.36mm below IRC HBG metal @ 15% spreading in uniform layers with motor grader on prepared surface mix in place method with rotovator at OMC and compacting with three wheel
Supply and laying inter locking paver block 80/60 mm thick of Required shape in cement mortar 1:2 using 10-12mm size HBG stone jelly including cost of centering shuttering laying vibrating finishing curing land the cost include transporting charges etc completed
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Construction granular sub base providing material 25mm to 4.75mm IRC HBG metal @ 65% 4.75 to 2.36mm IRC HBG metal @ 20%& 2.36mm below IRC HBG metal @ 15% spreading in uniform layers with motor grader on prepared surface mix in place method with rotovator at OMC and compacting with three wheel
Supply and laying inter locking paver block 80/60 mm thick of Required shape in cement mortar 1:2 using 10-12mm size HBG stone jelly including cost of centering shuttering laying vibrating finishing curing land the cost include transporting charges etc completed
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Construction granular sub base providing material 25mm to 4.75mm IRC HBG metal @ 65% 4.75 to 2.36mm IRC HBG metal @ 20%& 2.36mm below IRC HBG metal @ 15% spreading in uniform layers with motor grader on prepared surface mix in place method with rotovator at OMC and compacting with three wheel
Supply and laying inter locking paver block 80/60 mm thick of Required shape in cement mortar 1:2 using 10-12mm size HBG stone jelly including cost of centering shuttering laying vibrating finishing curing land the cost include transporting charges etc completed
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Construction granular sub base providing material 25mm to 4.75mm IRC HBG metal @ 65% 4.75 to 2.36mm IRC HBG metal @ 20%& 2.36mm below IRC HBG metal @ 15% spreading in uniform layers with motor grader on prepared surface mix in place method with rotovator at OMC and compacting with three wheel
Supply and laying inter locking paver block 80/60 mm thick of Required shape in cement mortar 1:2 using 10-12mm size HBG stone jelly including cost of centering shuttering laying vibrating finishing curing land the cost include transporting charges etc completed
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement concrete 1:2:4 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Construction granular sub base providing material 25mm to 4.75mm IRC HBG metal @ 65% 4.75 to 2.36mm IRC HBG metal @ 20%& 2.36mm below IRC HBG metal @ 15% spreading in uniform layers with motor grader on prepared surface mix in place method with rotovator at OMC and compacting with three wheel
Supply and laying inter locking paver block 80/60 mm thick of Required shape in cement mortar 1:2 using 10-12mm size HBG stone jelly including cost of centering shuttering laying vibrating finishing curing land the cost include transporting charges etc completed
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Construction granular sub base providing material 25mm to 4.75mm IRC HBG metal @ 65% 4.75 to 2.36mm IRC HBG metal @ 20%& 2.36mm below IRC HBG metal @ 15% spreading in uniform layers with motor grader on prepared surface mix in place method with rotovator at OMC and compacting with three wheel
Supply and laying inter locking paver block 80/60 mm thick of Required shape in cement mortar 1:2 using 10-12mm size HBG stone jelly including cost of centering shuttering laying vibrating finishing curing land the cost include transporting charges etc completed
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement concrete 1:2:4 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement concrete 1:2:4 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Construction granular sub base providing material 25mm to 4.75mm IRC HBG metal @ 65% 4.75 to 2.36mm IRC HBG metal @ 20%& 2.36mm below IRC HBG metal @ 15% spreading in uniform layers with motor grader on prepared surface mix in place method with rotovator at OMC and compacting with three wheel
Supply and laying inter locking paver block 80/60 mm thick of Required shape in cement mortar 1:2 using 10-12mm size HBG stone jelly including cost of centering shuttering laying vibrating finishing curing land the cost include transporting charges etc completed
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Construction granular sub base providing material 25mm to 4.75mm IRC HBG metal @ 65% 4.75 to 2.36mm IRC HBG metal @ 20%& 2.36mm below IRC HBG metal @ 15% spreading in uniform layers with motor grader on prepared surface mix in place method with rotovator at OMC and compacting with three wheel
Supply and laying inter locking paver block 80/60 mm thick of Required shape in cement mortar 1:2 using 10-12mm size HBG stone jelly including cost of centering shuttering laying vibrating finishing curing land the cost include transporting charges etc completed
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Construction granular sub base providing material 25mm to 4.75mm IRC HBG metal @ 65% 4.75 to 2.36mm IRC HBG metal @ 20%& 2.36mm below IRC HBG metal @ 15% spreading in uniform layers with motor grader on prepared surface mix in place method with rotovator at OMC and compacting with three wheel
Supply and laying inter locking paver block 80/60 mm thick of Required shape in cement mortar 1:2 using 10-12mm size HBG stone jelly including cost of centering shuttering laying vibrating finishing curing land the cost include transporting charges etc completed
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Construction granular sub base providing material 25mm to 4.75mm IRC HBG metal @ 65% 4.75 to 2.36mm IRC HBG metal @ 20%& 2.36mm below IRC HBG metal @ 15% spreading in uniform layers with motor grader on prepared surface mix in place method with rotovator at OMC and compacting with three wheel
Supply and laying inter locking paver block 80/60 mm thick of Required shape in cement mortar 1:2 using 10-12mm size HBG stone jelly including cost of centering shuttering laying vibrating finishing curing land the cost include transporting charges etc completed
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Construction granular sub base providing material 25mm to 4.75mm IRC HBG metal @ 65% 4.75 to 2.36mm IRC HBG metal @ 20%& 2.36mm below IRC HBG metal @ 15% spreading in uniform layers with motor grader on prepared surface mix in place method with rotovator at OMC and compacting with three wheel
Supply and laying inter locking paver block 80/60 mm thick of Required shape in cement mortar 1:2 using 10-12mm size HBG stone jelly including cost of centering shuttering laying vibrating finishing curing land the cost include transporting charges etc completed
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K GUBENDRAAN S AND CO
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .