| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹621.3 CrAccepted-AOC | ₹621.3 Cr | L1 | Accepted-AOC Work Order Issued |
| 2 | L2₹685.2 CrRejected-AOC | ₹685.2 Cr | L2 | Rejected-AOC L2 |
Tender Value
₹524.3 Cr
EMD Value
₹10.5 Cr
Closing Date
25 Jan 2024, 2:00 pmClosed
Spl. CE, PWD(Bldg), H_E, Assam, Chandmari, Ghy-3
O/O The CE, PWD(Bldg), Assam, Chandmari, Ghy-3
Establishment of New Medical College and Hospital at R.K. Nagar, Karimganj, Assam on Engineering, Procurement and Construction (EPC) Mode-1 Basis
2023_PWBNH_34265_1
CE/TB-IV/43/2023/5 Dated Guwahati 21st nov 2023
Open Tender
Civil Works - Building
1095 days
Karimganj
Please refer Tender documents.
5 documents required · 5 mandatory
₹30,000
₹10.5 Cr
Yes
18 Mar 2024
29 Nov 2023
29 Jan 2024
29 Nov 2023
25 Jan 2024
14 Dec 2023
Amount
Planning, Designing and Execution of Construction of multistoried RCC framed structure buildings i.e, Teaching Hospital complete including Planning, Designing, preparation of preliminary architectural & detailed working drawings, structural analysis & design by incoprating stipulated specification and adopting NBC-2016 norms, NMC Norms, IPHS guidelines & IS Codes and guidelines complete in all respect on EPC (design, built and handover) basis. The work shall be executed as per detailed / Scope of Work/NMC Norms/DBR/Technical specifications / mentioned in NIT and as per direction of the Engineer-in-Charge. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing and Execution of Construction of multistoried RCC framed structure buildings i.e, Medical College complete including Planning, Designing, preparation of preliminary architectural & detailed working drawings, structural analysis & design by incoprating stipulated specification and adopting NBC-2016 norms, NMC Norms, IPHS guidelines & IS Codes and guidelines complete in all respect on EPC (design, built and handover) basis. The work shall be executed as per detailed / Scope of Work/NMC Norms/DBR/Technical specifications / mentioned in NIT and as per direction of the Engineer-in-Charge. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing and Execution of Construction of multistoried RCC framed structure buildings i.e, Boys Hostel, Girls Hostel, Boys Intern Hostel, Girls Intern Hostel, Doctor's Hostel (Male), Doctor's Hostel (Female) & Nurses Hostel complete including Planning, Designing, preparation of preliminary architectural & detailed working drawings, structural analysis & design by incoprating stipulated specification and adopting NBC-2016 norms, NMC Norms& IS Codes and guidelines complete in all respect on EPC (design, built and handover) basis. The work shall be executed as per detailed / Scope of Work/NMC Norms/DBR/ Technical specifications / mentioned in NIT and as per direction of the Engineer-in-Charge. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing and Execution of Construction of multistoried RCC framed structure buildings i.e, Medical Suptt.'s Residence, Principal's Residence, Matron's Residenced, Warden's Residence. Asstt. Professors Residence, Demonstrator's Residence, Grade-III Staff Residence, Grade-IV Staff Residence complete including Planning, Designing, preparation of preliminary architectural & detailed working drawings, structural analysis & design by incoprating stipulated specification and adopting NBC-2016 norms, NMC Norms& IS Codes and guidelines complete in all respect on EPC (design, built and handover) basis. The work shall be executed as per detailed / Scope of Work/NMC Norms/DBR/ Technical specifications / mentioned in NIT and as per direction of the Engineer-in-Charge. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing and Execution of Construction of multistoried RCC framed structure buildings i.e, Cafeteria, Canteen, Dining (Boys), Dining (Girls), Workshop, Kitchen, Laundry, ESS building, Gas Manifold, STP building, complete including Planning, Designing, preparation of preliminary architectural & detailed working drawings, structural analysis & design by incoprating stipulated specification and adopting NBC-2016 norms, NMC Norms, IPHS guidelines & IS Codes and guidelines complete in all respect on EPC (design, built and handover) basis. The work shall be executed as per detailed / Scope of Work/NMC Norms/DBR/ Technical specifications / mentioned in NIT and as per direction of the Engineer-in-Charge. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing and Execution of Construction of multistoried RCC framed structure buildings i.e, Incinerator Building, Morgue, Pump House, Attendent's Residence, Attendent's Kitchen, Facility building, Shops, Child Care Center, Guard Room, Public Toilet - complete including Planning, Designing, preparation of preliminary architectural & detailed working drawings, structural analysis & design by incoprating stipulated specification and adopting NBC-2016 norms, NMC Norms, IPHS guidelines & IS Codes and guidelines complete in all respect on EPC (design, built and handover) basis. The work shall be executed as per detailed / Scope of Work/NMC Norms/DBR/ Technical specifications / mentioned in NIT and as per direction of the Engineer-in-Charge. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing and Construction on EPC Basis of INFRASTRUCTURE & EXTERNAL DEVELOPMENT – Electrical Works such as Electrical sub station,DG set, LED Street light , CCTV system For External Surveillance , Solar photo voltaic power generation system, Emergency Light and Illuminated digital signages , Boom barrier and Motarized steel gate with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Planning, Designing and construction of Civil External development works (B (i-xi) , Under ground Sump , Horticulture & Landscape , Earth Cutting/Filling Work , External & Internal Road, Pavements , Retaining walls around site, Hardscape, Boundary Wall with gate and guard room, Solar water heating system, , hyderopneumatic water supply system , sewerage+effluent treatment plant ,water cooler , water treatment plant with RO , Tubewell , sewage & drainage pump and ESS & Plant Room approval of the same by the Engineer- in-Charge
Planning, Designing, and Construction on EPC Basis of Medical Gas Pipeline System with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.(Matrix to be Followed as provided with MGPS Technical Specification)
Planning, Designing, and Construction on EPC Basis of Modular Operation Theater With stainless steel technology and Integration with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge. (Matrix to be Followed as provided with MOT Technical Specification)
Supply, Installation, Testing Commissioning of Modular Laboratory Furniture for Medical college and Hospital
Supply, Installation, Testing Commissioning of Equipments, for CSSD, TSSU, Kitchen, Laundry, Tube Wells.
Comprehensive Operation & Maintenance Contract (CMC) Charges for 5 years comprehensive warranty for followings services which will run concurrently with DLP of 12 Months. (i) MGPS
Comprehensive Operation & Maintenance Contract (CMC) Charges for 5 years comprehensive warranty for followings services which will run concurrently with DLP of 12 Months. (i) MOT
Comprehensive Operation & Maintenance Contract (CMC) Charges post 5 years comprehensive warranty for followings E & M Equipments/services: (i). Sub-Station Equipmenmts consisting of HT Panel, Dry type Transformers, HT cable, Bus trunking from Transformer to LT Panel, LT Panel, Automatic Power factor correction panel, Active Harmonic Filters, TVSS (Transient Voltage suppression system),SPD ( Surge protection system), Essential panel, Earthing, required inter-connections,substation safety equipments including LT cabling from sub station to the buildings fed by the sub station. (ii) Diesel Generator Sets (iii) Solar photo Voltaic Power Generation System (iv) Solar Water Heating System – Emergency & illuminating signs (v) Water supply system (vi) Street lighting with LED vii) Motorized Gates viii) UPS System ix) IP based EPABX System
For 1st year (after defect liability period)
For 2nd year (after 1 year of CMC)
For 3rd year (after 2 year of CMC)
For 4th year (after 3 year of CMC)
For 5th year (after 4 year of CMC)
"Comprehensive Operation & Maintenance Contract (CMC) Charges comprehensive warranty for followings Public Health System/ Equipment/ services: (i) Hydopneumatic Water Supplysystem (ii) STP/ETP Plant (iii) Water Cooler (iv) Electromechanical of WTP/RO System: (v) TubeWells and connected Motors/Equipments, (vi) Fire Pump & Accessories
For 1st year (after defect liability period)
For 2nd year (after 1 year of CMC)
For 3rd year (after 2 year of CMC)
For 4th year (after 3 year of CMC)
For 5th year (after 4 year of CMC)
"Comprehensive Operation & Maintenance Contract (CMC) Charges post 5 years comprehensive warranty for followings Equipments: (i). CSSD Equipments (ii) TSSU Equipments (iii) Water Cooler (iv) Modular Laboratory furniture (v) Kitchen Equipments (vi) Laundary Equipments
For 1st year (after defect liability period)
For 2nd year (after 1 year of CMC)
For 3rd year (after 2 year of CMC)
For 4th year (after 3 year of CMC)
For 5th year (after 4 year of CMC)
Lifts: Operation & comprehensive maintenance LIFT units after three year warranty charges/maintenance. Operator shall be available at plant 24X7. The rates shall be inclusive of all spare, accessories, consumables, manpower, tools and tackles , replacement of parts,(except fuel , power and water) including routine servicing and maintenance of equipment etc complete in all respect as per direction of Engineer in charge. Operation& Maintenance For 1st year (concurrently with DLP of 12 Months)
For 1st year (after defect liability period)
For 2nd year (after 1 year of CMC)
For 3rd year (after 2 year of CMC)
For 4th year (after 3 year of CMC)
For 5th year (after 4 year of CMC)
Operation and Maintenance of Services
HVAC WORK:Operation & maintenance (routine & preventive ) and breakdown maintenance of high side & low side of the Air conditioning plant comprising of all the machinery, equipment installed in the A.C. Plant room. Operation& Maintenance For 1st year (concurrently with DLP of 12 Months) For 2nd year (after 1 year of CMC)
For 3rd year (after 2 year of CMC)
For 4th year of CMC)
For 5th year of CMC)
M/s. SGCCL - SBP (JV)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid