| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.8 LAccepted-Finance | ₹40.8 L | L1 | Accepted-Finance lowest bidder |
| 2 | L2₹42.7 LRejected-Finance VILLAGE SHUKARI P O ROPA TEHSIL SAINJ DISTRICT KULLU HP | KULLU | HIMACHAL PRADESH | 172001 | ₹42.7 L | L2 | Rejected-Finance other then lowest bidder |
| Sl No | Description | Qty | Unit | BHIM SAIN L2 | HR BORIS INFRA PRIVATE LIMITED L1 |
|---|---|---|---|---|---|
| 1.00 | Cutting in earth work in all classification such as pick work ,Jumper work , Jumper blast hard blasting by chesling where blasting is prohibited in saturated soil and disposal of all excavated earth upto all leads and lifts as per the direction of Engineer-in-charge. | 2.25 | Cum | 449.93 ₹1,012.34 | 430.38 ₹968.36 |
| 2.00 | Excavation in foundation trenches etc. in earth work lift up to 1.5 mtrs. Stacking the excavated soil not more than 3 metres away from the edge of excavation and then returning the stacked soil in 15 cm layers when required in to plinth and sides of foundations, consolidating each deposited layer by ramming , watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres in pick and and jumper work. Engineer-in-charge. | 20.22 | Cum | 714.15 ₹14,440.11 | 683.1 ₹13,812.28 |
| 3.00 | Providing & laying cement concrete1:4:8(1 cement :4 sand : 8 graded stone aggregate 40 mm nominal size) & curing complete in Foundation and plinth within all leads and lifts. | 0.9 | Cum | 14,443.14 ₹12,998.83 | 13,815.18 ₹12,433.66 |
| 4.00Providing and laying cement concrete 1:1/2:3 (1 cement:1/2 Sand :3 Graded stone aggregate 20mm nominal size and Curing complete excluding the cost of form work & reinforcement or reinforced concrete work in | |||||
| 4.10 | foundation and pilth complete in all respect with in all leads and lifts. | 1.8 | Cum | 18,081.8 ₹32,547.24 | 17,295.63 ₹31,132.13 |
| 4.20 | wall (any thickness but not less then 0.10mtr thickness.)attached pilasters, buttresses,plinth and string courses etc from top of foundation level up to floor two level with in all leads and lifts. | 2.26 | Cum | 18,365.73 ₹41,506.55 | 17,567.22 ₹39,701.92 |
| 5.00Providing from work with steel plates 3.15 mm thick so as to give a fair finish including centering ,shuttering strutting and propping etc. height of propping and centering below supporting floor to cielling not exceeding 4.00 mtr and removal of the same for insitu reinforced concrete and plian concrete work in | |||||
| 5.10 | vertical surface such as walls (any thickness) partitions and the like including atached pillaster buttresses,Plinth and String courses and the like with an all leads and lifts. | 33.6 | Sqm | 598.98 ₹20,125.73 | 572.93 ₹19,250.45 |
| 6.00 | Laying mild/Tor Steel reinforcement for RCC work including bending and placing in position complete upto floor two level to the entire satisfaction of the Engineer in Charge Tor Steel with in all leads and lifts. | 364.97 | Kg | 39.44 ₹14,394.42 | 37.73 ₹13,770.32 |
| 7.00 | L/J and fixing scour pipe of 80 mm dia. With in all leads and lifts. | 6 | Rmt | 179.86 ₹1,079.16 | 172.04 ₹1,032.24 |
Tender Value
₹37.1 L
EMD Value
₹63,200
Closing Date
19 Feb 2026, 5:00 pmClosed
EE JSD Pooh
Executive Engineer Jal Shakti Division Pooh
SH Laying Jointing HDPE Pipe dia 315 mmP S of MS sheets thickness 3mm CO Cut Covers Chambers Job No 1
2026_HPIPH_128125_1
KNR-EE-JSDP-12651-12751
Open Tender
Civil Works
EE JSD Pooh
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Yes
₹63,200
Yes
EE JSD Pooh
4 Apr 2026
10 Feb 2026
20 Feb 2026
10 Feb 2026
19 Feb 2026
10 Feb 2026
12 Feb 2026
Cutting in earth work in all classification such as pick work ,Jumper work , Jumper blast hard blasting by chesling where blasting is prohibited in saturated soil and disposal of all excavated earth upto all leads and lifts as per the direction of Engineer-in-charge.
Excavation in foundation trenches etc. in earth work lift up to 1.5 mtrs. Stacking the excavated soil not more than 3 metres away from the edge of excavation and then returning the stacked soil in 15 cm layers when required in to plinth and sides of foundations, consolidating each deposited layer by ramming , watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres in pick and and jumper work. Engineer-in-charge.
Providing & laying cement concrete1:4:8(1 cement :4 sand : 8 graded stone aggregate 40 mm nominal size) & curing complete in Foundation and plinth within all leads and lifts.
Providing and laying cement concrete 1:1/2:3 (1 cement:1/2 Sand :3 Graded stone aggregate 20mm nominal size and Curing complete excluding the cost of form work & reinforcement or reinforced concrete work in
foundation and pilth complete in all respect with in all leads and lifts.
wall (any thickness but not less then 0.10mtr thickness.)attached pilasters, buttresses,plinth and string courses etc from top of foundation level up to floor two level with in all leads and lifts.
Providing from work with steel plates 3.15 mm thick so as to give a fair finish including centering ,shuttering strutting and propping etc. height of propping and centering below supporting floor to cielling not exceeding 4.00 mtr and removal of the same for insitu reinforced concrete and plian concrete work in
vertical surface such as walls (any thickness) partitions and the like including atached pillaster buttresses,Plinth and String courses and the like with an all leads and lifts.
Laying mild/Tor Steel reinforcement for RCC work including bending and placing in position complete upto floor two level to the entire satisfaction of the Engineer in Charge Tor Steel with in all leads and lifts.
L/J and fixing scour pipe of 80 mm dia. With in all leads and lifts.
Providing and fixing Brass valve of 80 mm dia. Of nominal pressure and designaton PN- with cape within alll leads and lifts
Lowering, Laying, jointing HDPE pipe (confirming to IS 4984-2016 ) in proper position by butt fusion jointing procedure including hydraulic testing as per relevent IS Code complete with all materials for jointing procedures like butt fusion welding machine with hydraulic jack , top loading clamp etc. pump and accessories for hydraulic testing and all labours as directed by engineer in charges as confirming to IS- 7634 (Part -II):2012 amended upto date).
HDPE Pipe 315 MM
Providing and laying MS sheet 3mm thik
Applying priming coat over new steel and other metel with ready mixed priming paint brushing ,red oxide,zinc oxide chrome.
Painting two coat over new steel and other metal suface Anti corrosive paint other than white.
Cutting in earth work (Rock Cutting ) in all classification such as pick work ,Jumper work , Jumper blast hard blasting by chesling where blasting is prohibited in saturated soil and disposal of all excavated earth upto all leads and lifts as per the direction of Engineer-in-charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
Tendernotice_2.pdf
PDF • 0.79 MB
Tendernotice_3.pdf
PDF • 2.29 MB
Tendernotice_4.pdf
PDF • 0.19 MB
BOQ_189264.xls
BOQ • 0.34 MB