Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.9 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹4.9 L+₹1,000 (0.20%)Rejected-AOC 19 A DURGA BARI SADAR BAZAR MEERUT MEERUT MEERUT UTTAR PRADESH 250001 | MEERUT | UTTAR PRADESH | 250001 | 2 | Rejected-AOC L2 |
Tender Value
₹5.6 L
EMD Value
₹7,000
Closing Date
16 Aug 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Superintending Engineer Electricity Transmission Circle I 57 George Town Prayagraj 211002
Replacement of damaged gasket of 100 MVA T/F-I, at 220 KV Substation Pratapgarh, under Electy. Trans. Division-Pratapgarh.
2024_UPTCL_929442_2
07-ETC-I(A)/2024-2025
Open Tender
Electrical Works
Item Rate
60 days
Pratapgarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE,ETC,PRAYAGRAJ
₹7,000
30 Sept 2024
25 Jun 2024
17 Aug 2024
25 Jun 2024
16 Aug 2024
25 Jun 2024
Amount
Following works are to be carried out for the work of replacement of damaged Gasket of 100 MVA T/F-I (NGEF make) alongwith other associated works with all cost of Men, Materials, Misc Consumables, Crane / Hydra, Normal & Special T&Ps, Rails etc. required for satisfactory Completion of work, as per Technical Specification & direction of the J.E. /A.E. as per details below :
Partially dismantling & safe stacking of Mulsifire air pipe line, water pipe line and proper stacking.
Complete drain out of the Transformer oil from 100 MVA T/F-I tank into 20 KL Oil Tank including opening of valve and filling in Oil Tank.
Dismantling of 100 MVA T/F-I HV/LV/TV/Neutral Bushing and its Turret, opening of all pipe line inlet/Outlet valve, inspection cover, Radiator Header, Gear Box, Buchholz relay, PRV, Oil pump , NRV & Jumpers for replacement of Gasket and jumpering of HV/LV side bushing after erection.
Providing and making of Top Cover Gasket of Transformer, Opening of Nut & Bolt, and removal of damage Gasket, cleaning of top surface & making new Gasket & fixing in proper gasket.
Replacement of Old and damaged gasket from different parts of the Transformers. The scope of works involves removal of Gaskets, Cleaning of surface, Fabrication of Gaskets of appropriate size of Konica/Telbroze/NE cork make and fixing of Gaskets at proper place with adhesive along with other associated works as per details given below-
Providing and making of HV Turret Gasket.
Providing and making of HV Bushing Gasket.
Providing and making of IV Turret Gasket.
Providing and making of IV Bushing Gasket.
Providing and making of Radiator Gasket
Providing and making of Radiator valve Gasket
Providing and making of Gasket of inspection cover.
Providing and making of Radiator pipe line 6 " dia.
Providing and making of C.T. inspection cover HV/LV
Providing and making of 1" Dia pipe pipe line Gasket.
Providing and making of Surge Relay Gasket.
Providing and making of Gasket Buchholz Relay.
Providing and making of Gasket of PRV
Providing and making of OLTC plate.
Providing and making of 1 " dia valve Gasket.
Providing and making of 2 " dia Valve Gasket.
Providing and making of 4" dia Valve Gasket.
Providing and making of TV Bushing Gasket.
Providing and making of N Bushing Gasket.
Providing and making of Flow indicator Gasket.
Providing and making of Gasket of oil pump
Providing and making of Gasket 3" dia Valve.
Providing and making of WTI/OTI Pocket.
Providing and making of Gasket of conservator tank.
Providing and making of Gasket of OltC tank.
Providing and making of nylon washer of radiator, Bushing Air releasing plugs.
Providing and making of Gasket of NRV
Providing and making of Gasket of MOG
Overhauling of diverter switch, removal the diverter switch from chamber cleaning by hot oil, removed the dirty oil and proper cleaning and fixing in original shape.
Erection of Turret HV / LV / IV side and erection of Bushing, Radiator, Header, Oil Pipe Line 6" and 3" Gear Box, OLTC Pipe Line, Pump, Flow meter, inspection Cover etc. for complete of work.
Performing the vacuum stand test, scope of work involves creating the vacuum inside the transformer upto 760 mm of Hg for evacuation of moisture from core & winding and maintaining the pressure at least 72 hours.
Complete Evacuation of main tank and filling of Dry Nitrogen of dew Point -50°C or better in Vacuum up to Pressure of 0.25 Kg./Cm² and the again evacuating the Transformer Tank after Required Time interval (approx. 12 Hrs.) using centrifuging Machine. The Work shall include connecting Pipes of Machine as Required and Measuring Due Point Values of N2 after every Cycle till the Required Value is Achieved.
Centrifuging of T/F Oil storage Tanks, un-interrupted till the desired BDV & PPM Value of the Oil is achieved and then filling & Topping up of the Centrifuged T/F Oil in Transformer as per standard Procedure to Maintain required Oil Level in the Transformer including commissioning of Air Cell if required Centrifuging & Cirulation of T/F OIl in Transformer, un-interrupted till the desired BDV&PPM Value of the Oil & IR Values of Bushings are achieved including Hourly Recording all the Parameters such as Temp. Vacuum, Insulation Resistance etc. Centrifuging Machine, Its Operator and all associated T&Ps shall be arrenged by the Contractor at his own cost.
Erection of Mulsifire system, Air /Water Pipe Lines, Proper replacement of Gasket and Tightening of Nut & Bolts.
Technocrat Electrical
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .