Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 CrAccepted-Finance 75 J N ROAD HADDO PORT BLAIR SOUTH ANDAMAN PORT BLAIR 744102 | PORT BLAIR | SOUTH ANDAMAN | ANDAMAN AND NICOBAR ISLANDS | 744102 | L1 | Accepted-Finance Being L1 |
Tender Value
₹6.9 Cr
EMD Value
₹13.7 L
Closing Date
10 Jun 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE, CD-III,APWD. PROTHRAPUR
O/o EE, CD-III,APWD. PROTHRAPUR
Up gradation of Rural Road from Burmanallah to Pema Junction via Maccapahad under PMGSY III Batch I 2024 25 Package No AN01PB107 Length 5.530 Km
2025_APWD_140908_1
NIT NO. 02/EE/CD-III/2025-26
Open Tender
Civil Works - Roads
Percentage
365 days
Burmanallah
Please refer Tender Document
8 documents required · 8 mandatory
₹5,000
O/o EE, CD-III, APWD, PROTHRAPUR
₹13.7 L
O/o SE,CC-I,APWD SVP
9 Jul 2025
6 May 2025
11 Jun 2025
7 May 2025
10 Jun 2025
19 May 2025
14 May 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PAVEMENT WORK
Clearing and grubbing road land
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 | 0.52 | Ha | 1,24,542 | ₹64,139.13 |
| 2 | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 | 293.62 | cum | 885.22 | ₹2,59,914.76 |
| 3 | Removing all types of Hume Pipes
Removing all types of Hume pipes and stacking within a lead of 1000m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause202.
(C) Above 900 mm dia hume pipe | 10 | M. | 990 | ₹9,900 |
| 4 | Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 16,479 | sqm | 12.34 | ₹2,03,350.86 |
| 5 | Construction of Embankment with Material Obtained from Roadway Cutting
Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the subgrade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. | 3,604.78 | cum | 314.45 | ₹11,33,523.46 |
| 6 | Construction of Embankment with Material Obtained from Borrow Pits
Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | 677.19 | cum | 503.39 | ₹3,40,890.54 |
| 7 | Construction of Subgrade and Earthen Shoulders
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead up to 1000 m as per Technical Specification Clause 303.1. | 3,784.59 | cum | 487.48 | ₹18,44,913.76 |
| 8 | For modified soil by construction of sub base using GSB III materials
Construction of Modified Soil by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
Material : 9.5 mm to 4.75 mm @ 35 per cent = 0.447 cum, 4.75 mm to 2.36 mm @ 12.5 per cent = 0.160 cum, 2.36 mm below @ 52.5 per cent = 0.672 cum, Water = 0.100 kilolitre. | 420.22 | cum | 3,526.96 | ₹14,82,081.5 |
| 9 | Granular Sub-base with Well Graded Material (Table 400.1) GSB grade III
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
Material : 9.5 mm to 4.75 mm @ 35 per cent = 0.447 cum, 4.75 mm to 2.36 mm @ 12.5 per cent = 0.160 cum, 2.36 mm below @ 52.5 per cent = 0.672 cum, Water = 0.100 kilolitre. | 2,206.13 | cum | 3,526.96 | ₹77,80,918.16 |
| 10 | Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill). carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
Material : Coarse aggregate 45 mm to 22.4 mm @ 30 per cent = 0.399 cum, Aggregates 22.4 mm to 2.36 mm @ 40 per cent = 0.532 cum, Fine aggregate/Crushed sand 2.36 mm to 75 micron @30 per cent = 0.399 cum, water = 0.08 kl. | 4,375.07 | cum | 3,618.73 | ₹1,58,32,207.92 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_219750.xls
BOQ • 0.41 MB
169867960.html
Tender Documents • 0.06 MB
169956666.pdf
Tender Documents • 3.26 MB
171499691.pdf
Tender Documents • 0.57 MB
TenderDocumentPMGSYIIIRuralRoadFromBurmanallahtoPemaJunction.pdf
Tender Documents • 2.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .