Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹51.3 LAccepted-AOC AT GOPINATHPUR PO NARAYANPUR PS K NUAGAM DIST GANJAM PIN 761209 | GANJAM | ODISHA | 761209 | ₹51.3 L | 1 | Accepted-AOC 1st lowest |
| 2 | 2₹53.0 L+₹1.8 L (3.44%)Rejected-AOC | ₹53.0 L+₹1.8 L (3.44%) | 2 | Rejected-AOC 2nd lowest |
| 3 | 3₹58.9 L+₹7.7 L (15.0%)Rejected-AOC | ₹58.9 L+₹7.7 L (15.0%) | 3 | Rejected-AOC 3rd lowest |
| 4 | 3₹58.9 L+₹7.7 L (15.0%)Rejected-AOC | ₹58.9 L+₹7.7 L (15.0%) | 3 | Rejected-AOC 3rd lowest |
| 5 | 3₹58.9 L+₹7.7 L (15.0%)Rejected-AOC JEYPORE DIST KORAPUT | JEYPORE | KORAPUT | ODISHA | ₹58.9 L+₹7.7 L (15.0%) | 3 | Rejected-AOC 3rd lowest |
Tender Value
₹58.9 L
EMD Value
₹59,000
Closing Date
12 May 2026, 5:00 pmClosed
Divisional Officer
ROADS & BUILDINGS DIVISION, JEYPORE
Improvement of runway side slopes near extension area at Jeypore Airport, ROADS
2026_EICCL_128565_1
SE Rand B 02 2026 27
Open Tender
Civil Works - Roads
Percentage
120 days
Koraput
2 documents required · 2 mandatory
₹10,000
₹59,000
Yes
2 Sept 2026
28 Apr 2026
13 May 2026
28 Apr 2026
12 May 2026
28 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in Hard soil soil including shoring, centring, shuttering, propping bullahs, piling and dewatering(if required) with dressing and levelling the bed and laying the excavated earth in layers not exceeding 0.3 m in depth at places away from work site and stacking of useful materials near by the work site with in intial leads and lifts including cost of all labour and T&P for the works etc. complete as directed by the Engineer-in-charge. | 38.7 | cum | 276.89 | ₹10,715.64 |
| 2 | Supplying & filling in foundation & plinth with sand in 23.5cm(9 inch) thick layers including watering & ramming with cost, conveyance, royalties, taxes of the materials & labour with T&P required for the work etc.,complete as per direction of Engineer-in-Charge. (Measurement will be taken on finished compacted section only) | 7.65 | cum | 700.06 | ₹5,355.46 |
| 3 | Supplying all materials, labour, T&P and providing cement concrete ( 1:3:6) with 40mm size crusher broken hard black granite chips including watering, curing,cost of all materials, conveyance of all materials to work site with payment of royalty, all taxes etc all complete as per P.W.D specification and direction of Engineer-in-charge | 7.65 | cum | 5,984.46 | ₹45,781.12 |
| 4 | R.C.C.work of Grade M-20 having minimum compressive strength in work test of 200kg/Cm2 in 15cm cubes at 28 days after mixing and tests conducted in accordance with IS 456 & IS 516 using 20mm down graded size black crusher broken hard granite stone chips of approved quality & from approved quarry including hoisting, lowering & laying concrete & compacting by using vibrators, watering & curing for 4 (four) weeks centring, shuttering & finishing the exposed surface smooth providing grooves or beads where necessary including cost & conveyance royalties & taxes of all materials T&P & labour required for the work etc., complete in all respect but excluding cost & conveyance of M.S.Rods,HYSD bars or tor steel and binding wires of 18 to 20 gauge & labour charges for straightening, cutting, bending etc.,of the M.S.Rods or tor steel & binding wires & laying the grills in proper position as per direction of Engineer-in-Charge. A) Drain Base | 6.75 | cum | 6,493.86 | ₹43,833.56 |
| 5 | Drain Wall | 8.55 | cum | 8,549.71 | ₹73,100.02 |
| 6 | Drain Slab | 6.6 | cum | 7,596.71 | ₹50,138.29 |
| 7 | Supplying, Cutting, Straightening coiled or bent up M.S. rods or Tor steel of SAIL(HYSD Fe-500) welding or jointing if necessary, bending, binding, tying the grills and laying in position as required for R.C.C. works and hoisting, lowering and placing in position in all floors according to approved designs and drawings including cost, conveyance, of M.S. rods or Tor steel and binding wires of 18 to 20 gauge required for the work and cost of all labour, sundries, T&P etc. complete in all respect as directed by the Engineer-in-charge All reinforcement steel and structural steel shall be procured from primary producers of steel-SAIL/RINL/ TATA/ JINDAL(Panther)/ SHYAM STEEL. | 9.86 | qtl | 9,537.95 | ₹94,044.19 |
| 8 | Plain cement concrete (1:2:4) using 6mm to 12mm size (18mm not to exceed 25 percent) hard black broken granite chips of approved quality from approved quarry including hoisting, lowering and laying concrete, watering and curing including cost of all labour T & P royalties etc. required for the work as directed by the Engineer-In-Charge | 60.6 | cum | 7,591.01 | ₹4,60,015.21 |
| 9 | Rough stone dry packing in aprons and revetments, stone pitching in slopes and boulder apron of CD works etc with hard stone including cost of all materials, labour, T&P, taxes, royalty etc complete in all respect and as per direction of the Engineer-in-charge. | 2,205 | cum | 2,317.96 | ₹51,11,101.8 |
stage.html
html • 0.06 MB
technical_589046.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.88 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_589046.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .