| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹8.0 CrAccepted-Finance 1517 HEMKUNT CHAMBERS NEHRU PLACE NEW DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | ₹8.0 Cr | L-1 | Accepted-Finance financially qualified |
| 2 | L-2₹8.3 Cr+₹29.2 L (3.65%)Accepted-Finance PLOT NO 113 ECOTECH III UDYOG KENDRA II ECOTECH III GAUTAM BUDDHA NAGAR UTTAR PRADESH 201306 UDYAM UP 28 0018392 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201306 | ₹8.3 Cr+₹29.2 L (3.65%) | L-2 | Accepted-Finance financially qualified |
| 3 | L-3₹8.8 Cr+₹85.5 L (10.7%)Accepted-Finance 312 318 3RD FLOOR ARCAE MALL MALVIYA MARG C SCHEME JAIPUR 302001 | JAIPUR | JAIPUR | RAJASTHAN | 302001 | ₹8.8 Cr+₹85.5 L (10.7%) | L-3 | Accepted-Finance financially qualified |
| 4 | L-4₹9.0 Cr+₹97.6 L (12.2%)Accepted-Finance | ₹9.0 Cr+₹97.6 L (12.2%) | L-4 | Accepted-Finance financially qualified |
| 5 | L-5₹9.4 Cr+₹1.5 Cr (18.2%)Accepted-Finance | ₹9.4 Cr+₹1.5 Cr (18.2%) | L-5 | Accepted-Finance financially qualified |
| Sl No | Description | Qty | Unit | BSG SOLAR ECO ENERGY PRIVATE LIMITED L5 | SUNGARNER ENERGIES LIMITED L2 | M/s Solar Pulse Energy Private Limited L7 | ENVIRO INFRA ENGINEERS LIMITED L6 | STOCKWELL SOLAR SERVICES PRIVATE LIMITED L3 | KLK Ventures Private Limited L1 | Mittal Machinery Store - Saharanpur L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Part A DESIGN, ENGINEERING, SUPPLY, INSTALLATION AND COMMISSIONING OF 500 KW GROUND MOUNTED SOLAR POWER PROJECT AT THALA UARLA, HADOLI, PARGOD & CHALOH Rates for the Supply of material (Must be quoted FOR site, freight, insurance, including loading, unloading, storage, handling at site) | ||||||||||
| 2.00 | Supply of SPV Modules as specified in the Tender documents | 4 | Nos | 3,96,02,400 ₹3,96,02,400 | 3,68,16,000 ₹3,68,16,000 | 4,32,76,800 ₹4,32,76,800 | 4,36,76,800 ₹4,36,76,800 | 3,88,00,000 ₹3,88,00,000 | 3,48,00,000 ₹3,48,00,000 Lowest | 4,13,40,000 ₹4,13,40,000 |
| 3.00 | Supply of Inverters as specified in the Tender documents | 4 | Nos | 45,52,000 ₹45,52,000 | 74,50,500 ₹74,50,500 | 38,12,480 ₹38,12,480 | 65,82,400 ₹65,82,400 | 40,00,000 ₹40,00,000 | 31,36,000 ₹31,36,000 Lowest | 41,74,000 ₹41,74,000 |
| 4.00 | Supply of Inverter transformer as specified in the Tender documents | 4 | Nos | 40,96,800 ₹40,96,800 | 65,35,000 ₹65,35,000 | 41,28,536 ₹41,28,536 | 32,56,800 ₹32,56,800 Lowest | 40,00,000 ₹40,00,000 | 34,22,000 ₹34,22,000 | 37,74,000 ₹37,74,000 |
| 5.00 | Supply of Panels & Switchgears as specified in the Tender documents | 4 | Nos | 40,96,800 ₹40,96,800 | 35,83,000 ₹35,83,000 | 25,78,300 ₹25,78,300 | 19,54,080 ₹19,54,080 Lowest | 36,00,000 ₹36,00,000 | 30,68,000 ₹30,68,000 | 37,74,000 ₹37,74,000 |
| 6.00 | Supply of Module mounting structure as specified in the Tender documents | 4 | Nos | 98,52,804 ₹98,52,804 | 84,56,000 ₹84,56,000 | 55,36,560 ₹55,36,560 | 81,42,000 ₹81,42,000 | 80,00,000 ₹80,00,000 | 54,64,000 ₹54,64,000 Lowest | 1,13,22,000 ₹1,13,22,000 |
| 7.00 | Spare Modules ( 0.50% of total supply of solar modules) | 4 | Nos | 1,98,012 ₹1,98,012 | 2,30,252 ₹2,30,252 | 6,69,344 ₹6,69,344 | 2,16,384 ₹2,16,384 | 2,00,000 ₹2,00,000 | 1,44,000 ₹1,44,000 Lowest | 2,64,400 ₹2,64,400 |
| 8.00 | Mandatory spares excluding modules | 4 | Nos | 34,14,000 ₹34,14,000 | 27,46,400 ₹27,46,400 | 18,90,232 ₹18,90,232 | 10,86,336 ₹10,86,336 | 2,00,000 ₹2,00,000 Lowest | 2,00,000 ₹2,00,000 Lowest | 3,09,600 ₹3,09,600 |
| 9.00 | Cables ( all DC, LT & HT) | 4 | Nos | 34,14,000 ₹34,14,000 | 28,76,160 ₹28,76,160 | 19,54,080 ₹19,54,080 Lowest | 62,30,400 ₹62,30,400 | 24,00,000 ₹24,00,000 | 23,60,000 ₹23,60,000 | 37,74,000 ₹37,74,000 |
| 10.00 | Supply of Balance of Systems for the Solar Part for commissioning of the Plant as specified in tender documents | 4 | Nos | 1,12,17,628 ₹1,12,17,628 | 22,76,000 ₹22,76,000 Lowest | 1,53,37,580 ₹1,53,37,580 | 1,08,18,240 ₹1,08,18,240 | 80,00,000 ₹80,00,000 | 99,82,800 ₹99,82,800 | 75,48,000 ₹75,48,000 |
Tender Value
₹8 Cr
EMD Value
₹16 L
Closing Date
12 Jun 2025, 5:00 pmClosed
Project Manager (Solar)
HIMURJA SDA Complex Kasumpti
Ground Mounted Solar Power Project
2025_NCES_103448_1
HIMURJA (F-7) /WB/Phase-II/SPP/500 KW/5/ 2025-26
Open Tender
Solar Power Plants
Fixed-rate
HIMURJA SDA Complex Kasumpti
Please refer Tender documents.
4 documents required · 4 mandatory
₹20,000
Director, Himurja
₹16 L
HIMURJA SDA Complex Kasumpti
22 Sept 2025
5 Apr 2025
13 Jun 2025
5 Apr 2025
12 Jun 2025
5 Apr 2025
5 Apr 2025 - 11 Jun 2025
10 Apr 2025
Part A DESIGN, ENGINEERING, SUPPLY, INSTALLATION AND COMMISSIONING OF 500 KW GROUND MOUNTED SOLAR POWER PROJECT AT THALA UARLA, HADOLI, PARGOD & CHALOH Rates for the Supply of material (Must be quoted FOR site, freight, insurance, including loading, unloading, storage, handling at site)
Supply of SPV Modules as specified in the Tender documents
Supply of Inverters as specified in the Tender documents
Supply of Inverter transformer as specified in the Tender documents
Supply of Panels & Switchgears as specified in the Tender documents
Supply of Module mounting structure as specified in the Tender documents
Spare Modules ( 0.50% of total supply of solar modules)
Mandatory spares excluding modules
Cables ( all DC, LT & HT)
Supply of Balance of Systems for the Solar Part for commissioning of the Plant as specified in tender documents
Part B Rates for installation of 500 kw Solar Power Project, and other allied activities for successful completion of the Solar Power Project
Design, Engineering, Supply, Installation & Commissioning and performance testing of the equipments supplied and other services specified in the tender document.
Civil and allied works for construction of Module mounting structure, foundations etc for all the equipment supplied
Freight, Insurance, Loading unloading, storage at site, handling at site for allied works
Part C RATES FOR OPERATION & MAINTENENACE FOR FIVE YEARS
Operation and Maintenance of the Solar PV Ground Mounted Solar Power Project for first year
Operation and Maintenance of the Solar PV Ground Mounted Solar Power Project for second year
Operation and Maintenance of the Solar PV Ground Mounted Solar Power Project for third year
Operation and Maintenance of the Solar PV Ground Mounted Solar Power Project for fourth year
Operation and Maintenance of the Solar PV Ground Mounted Solar Power Project for fifth year
Operation and Maintenance of the Solar PV Project with BESS for sixth year
Operation and Maintenance of the Solar PV Project with BESS for seventh year
Operation and Maintenance of the Solar PV Project with BESS for eigth year
SUNGARNER ENERGIES LIMITED (BID ID -524324)
STOCKWELL SOLAR SERVICES PRIVATE LIMITED (BID ID -513240)
Mittal Machinery Store - Saharanpur (BID ID -513017)
BSG SOLAR ECO ENERGY PRIVATE LIMITED (BID ID -513282)
ENVIRO INFRA ENGINEERS LIMITED (BID ID -513264)
M/s Solar Pulse Energy Private Limited (BID ID -524067)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_151839.xls
BOQ • 0.28 MB
167573514.pdf
Tender Documents • 0.04 MB
167573518.html
Tender Documents • 0.05 MB
169168014.pdf
Tender Documents • 0.38 MB
170163431.pdf
Tender Documents • 0.58 MB
tenderdocument.pdf
Tender Documents • 2.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .