Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81.7 LAccepted-AOC | ₹81.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹89.8 L+₹8.1 L (9.98%)Rejected-Finance A 94 SECTOR P 3 GREATER NOIDA G B NAGAR | GREATER NOIDA | G B NAGAR | U P | ₹89.8 L+₹8.1 L (9.98%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical DIS-QUALIFIED |
Tender Value
₹91.7 L
EMD Value
₹1.8 L
Closing Date
6 Mar 2026, 5:00 pmClosed
SM_TENDER CELL
GNIDA OFFICE
Renovation and Strengthening of Rampur rotary, Greater Noida.
2026_GNIDA_1119664_13
SM/(E-TENDER CELL)/2026/721 DATED-23.02.2026
Open Tender
Civil Works
Fixed-rate
270 days
GREATER NOIDA
REFER TENDER DOCUMENT
5 documents required · 5 mandatory
₹2,100
₹1.8 L
9 Sept 2026
25 Feb 2026
9 Mar 2026
25 Feb 2026
6 Mar 2026
25 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. (DSR-18/16.82) | 436.98 | Rmt | 14.86 | ₹6,493.52 |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar (DSR-18/15.7.4/AR) | 67.01 | Cum | 779.76 | ₹52,251.72 |
| 3 | Excavation in foundation in ordinary soil (Loam clay or sand) including lift upto 1.50 M and lead upto 30.00M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer incharge upto a distance of 30m from the foundation trenches (where machine con not reach/move) (SOR/251 (A)/4.1.1) | 1,084.28 | Cum | 95 | ₹1,03,006.6 |
| 4 | Cartage of earth or fly ash when added to schedule item no. 253 : IInd Km. and beyond (SOR-20/261(C)) | 813.21 | Cum | 69.1 | ₹56,192.81 |
| 5 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm. depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres. (DSR-18/16.1) | 2,378.15 | Sqm | 83.01 | ₹1,97,410.23 |
| 6 | Granular sub-base with graded material, plant mix method
Construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. MORTH/4.01/401(A) | 416.18 | Cum | 4,389.06 | ₹18,26,638.99 |
| 7 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with grader in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density (MORTH/4.14/406(B)) | 475.63 | Cum | 5,004.19 | ₹23,80,142.89 |
| 8Brick edging in full brick width and half brick depth including excavation, refilling and disposal of surplus earth lead upto 50 metres. | |||||
| 8.01 | With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 (DSR-18/16.7.1) | 418.5 | Rmt | 139.94 | ₹58,564.89 |
| 9 | Providing and applying tack coat with bitumen VG-10 using emulsion pressure distributor at the rate of 0.5kg/Sqm on prepared bituminous surface cleaned with mechanical broom (MORTH-5.02/503) | 2,378.15 | Sqm | 28.24 | ₹67,158.96 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.44 MB
BOQ_2082187.xls
BOQ • 0.29 MB
PreQ_Renov_Rampur.pdf
Tender Documents • 0.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .