Er. Mohammad Waseem
Office of the Executive Engineer RnB Ang
Construction of Central drain from H/O Altaf Ahmad to Mohd Yousuf Mir at Ganjiwara Anantnag
2026_PWDJK_311212_1
NIT 18 of RnB/Ang/2026-27/2059-68 Dt 30/05/26
Open Tender
Civil Works
30 days
Anantnag
Please refer Tender documents.
4 documents required · 4 mandatory
₹200
Executiver Engineer rnB Division Anantnag
₹8,160
30 May 2026
30 May 2026
5 Jun 2026
30 May 2026
4 Jun 2026
30 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of Labour for site clearence | 5 | no | - | - |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, All kinds of soil: | 41.62 | cum | - | - |
| 3 | P/I dry stone soling (inc. backfilling of drain blocks) duly hand packed & consolidated with hand rammers inc. all carriage complete job | 3.03 | cum | - | - |
| 4 | Providing and laying in position cement concrete of (1:4:8) ratio excluding the cost of centring, shuttering and carraige of all work in foundation using coarse sand and 40mm nominial size aggregate include carraige of materials complete job. | 3.56 | cum | - | - |
| 5 | Providing and laying in position cement concrete of (1:2:4) ratio excluding the cost of centring, shuttering and carraige of all work in foundation using coarse sand and 20mm nominial size aggregate include carraige of materials complete job | 19.03 | cum | - | - |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level, 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) incl carriage | 7.14 | cum | - | - |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth levelm Thermo-Mechanically Treated bars FE-500 D or more | 713.58 | kg | - | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for foundations | 124.91 | sqm | - | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for Suspended floors , Roofs landings | 15.61 | sqm | - | - |
| 10 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate incl carriage | 15.6 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_1007766.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid