Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹9.7 L
EMD Value
₹12,200
Closing Date
24 Oct 2026, 6:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
GENERAL MANAGER OPERATION CHIRIMIRI AREA
OFFICE OF GENERAL MANAGER OPERATION CHIRIMIRI AREA
Work of Masonry construction of 16 Nos ventilation stoppings to provide ventilation arrangement proper distribution and diversion of ventilating air from SeamIII to SeamII development panels and SeamIII pumping stations
2026_SECL_366906_1
e-tender/26-27/VW/R-13/13 Date 09.10.2026
Open Tender
Civil Works - Others
Percentage
90 days
Vijay West UG Mine, Chirimiri Area
REFER TENDER DOCUMENTS
4 documents required · 4 mandatory
₹12,200
10 Oct 2026
10 Oct 2026
26 Oct 2026
10 Oct 2026
24 Oct 2026
11 Oct 2026
10 Oct 2026 - 17 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in coal/shale/stone for grip cutting in side/bottom/top up gallery by using pick axe/chiseling of exposed Surface removal of estimated of coal/shale & stacking separately serviceable & unserviceable material within a distance of 50 mtrs. For Coal / Shale(Item No.-2(d) of GMSOR-2019) | 18.43 | m3 | 1,375.1 | ₹25,343.09 |
| 2 | Excavation in coal/shale/stone for grip cutting in side / bottom/top up gallery by using pick axe / chiseling of exposed Surface removal of estimated of coal /shale & stacking separately serviceable & unserviceable material within a distance of 50 mtrs. For Stone(Item No.-2(b) of GMSOR-2019) | 4.58 | m3 | 5,647.71 | ₹25,866.51 |
| 3 | Brick work using fly ash bricks of class designation 75 in foundation and plinth with cement mortar 1:6 (1 cement : 6 fine sand) including loading, unloading the materials into mine car/tub and carriage of materials by manual labour for a lead of 50 mtrs both at surface & underground. (Item No.-11 of GMSOR-2016) | 25.98 | m3 | 4,461.73 | ₹1,15,915.75 |
| 4 | Brick work using fly ash bricks of class designation 75 in superstructure above foundation and plinth with cement mortar 1:6 (1 cement: 6 fine sand) including loading, unloading the materials into mine car/tub and carriage of materials by manual labour for a lead of 50 mtrs both at surface & underground.(Item No.-12 of GMSOR-2016) | 82.46 | m3 | 5,868.63 | ₹4,83,927.23 |
| 5 | 12 mm thick cement plaster with cement mortar 1:6 (1 cement: 6 sand) including loading, unloading the materials into mine car/tub and carriage of materials by manual labour for a lead of 50 mtrs both at surface & underground.(Item No.-16 of GMSOR-2016) | 628.07 | m2 | 266 | ₹1,67,066.62 |
| 6 | Add for every additional lead of 50mtrs. or part thereof up to 0.50 KM.- Sand (01 lead)(Item No.-22(b) of GMSOR-2016) | 37.89 | m3 | 33.54 | ₹1,270.83 |
| 7 | Add for every additional lead of 50mtrs. or part thereof up to 0.50 KM.- Cement (01 lead) (Item No.-22(f) of GMSOR-2016) | 9.1 | MT | 16.47 | ₹149.88 |
| 8 | Add for every additional lead of 50mtrs. or part thereof up to 0.50 KM.- Brick (01 lead) (Item No.-22(c) of GMSOR-2016) | 54,220 | No. | 0.06 | ₹3,394.17 |
| 14 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.20 MB
Tendernotice_2.pdf
PDF • 1.66 MB
Tendernotice_3.pdf
PDF • 0.75 MB
BOQ_379848.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .