Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.1 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹41.5 L+₹9,015 (0.22%)Rejected-Finance | L2 | Rejected-Finance HIGHER THEN L1 BIDDER |
Tender Value
₹37.9 L
EMD Value
₹80,000
Closing Date
1 Jun 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE
HQ 136 WORKS ENGINEERS PIN - 914136 C/O 99 APO
SPL REPAIRS TO ROAD FROM MAIN GATE TO CERTAIN AREA (300 MTR APPROX) OF 5 MILE UNDER GE GANGTOK
2022_MES_499778_5
CWE/136-WE/43 OF 2021-22
Open Tender
Civil Works - Roads
Item Rate
180 days
Gangtok
Class D, Category a(v)
8 documents required · 8 mandatory
₹500
GE Gangtok
₹80,000
Yes
9 Jun 2022
4 May 2022
2 Jun 2022
4 May 2022
1 Jun 2022
11 May 2022
4 May 2022 - 9 May 2022
60 days
Amount
M&L Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area n.exc 400 sqm and depth exc 50 mm and n.exc 100mm complete all as specified and as directed.
M&L 100 mm thick Moorum/Red bajri filling as in Granular Sub Base and light wearing surface & well ramming incl watering as reuired complete all as specified and as directed.
Rough excavation n.exc 1.5 m deep and getting out in soft/loose soil complete all as specified and as directed.
Forming embankments including raising (or lowering) earth(Soil),spreading in layers n exc. 30 cm thick; watering, ramming/rolling and finishing to required size, shape,etc., n exc. 1.5 m high from base complete all as specified and directed.
Spreading & levelling in layers n.exc 25 cm thick & well ramming incl watering as reuired complete all as specified and as directed.
Soling (or sub base) 100 mm thick with broken boulders or quarried stone, inter stices filled, surface formed and rolled with Power roller exc 5 tonne but n.exc 8 tonne ,consolidated to required gradient and camber etc complete all specified and as directed.
Soling (or sub base) 100 mm thick with broken boulders or quarried stone, inter stices filled, surface formed and rolled with Power roller exc 5 tonne but n.exc 8 tonne ,consolidated to required gradient and camber etc but except materials complete all specified and as directed.
M&L for 75mm thick (compacted thickness) WBM, with coarse aggregate Limestone, sand stone,Flint or Quartzite of grading 2 (63 to 40mm size) or of grading 3 (50 to 20mm size), spread, rolled consolidated to required gradient and camber using 8 to 10 tonne power roller complete all as specified and directed.
M&L for 75mm thick (compacted thickness) WBM, with coarse aggregate Limestone, sand stone,Flint or Quartzite of grading 2 (63 to 40mm size) or of grading 3 (50 to 20mm size), spread, rolled consolidated to required gradient and camber using 8 to 10 tonne power roller but except materials complete all as specified and directed.
Preparing unsurfaces WBM by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. complete all as specified and as directed.
Applying evenly a priming/tack coat with paving bitumen (VG-10) at 10kg per 10 sqm using paving bitumen complete all as specified and directed.
M&L Premix bituminous macadam laid & rolled and compacted to required gradient and camber, consolidated thickness n.exc 75mm, using paving bitumen (VG-30) binder complete all as specified and directed.(Note:-The unit rates are worked out on the basis of binder content of 4% by weight of total mix).
Preparing black top surfaces by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. complete all as specified and as directed.
Applying evenly a priming/tack coat with paving bitumen (VG-10) at 5kg per 10 sqm using paving bitumen complete all as specified and directed.
M&L for bituminous premixed carpet 40 mm thick consolidated thickness with 0.54 cum of stone chipping & mixed with 29.2 Kg of binder rolled with 8 to 10 ton power roller and compacted to required camber and gradient using paving bitumen (VG-30) all as specified and as directed.
M&L for liquid seal coat with paving bitumen grade (VG-30) @ applying evenly binder @ 9.8 kg per 10 sqm blinding with 6.3mm size stone chippings @ 0.09 cum per l0 sqm and rolled to a uniform smooth surface complete all as specified and as directed.
Demolition of precast concrete block/brick walling built in cement mortar etc complete all as specified.
M & L for precast cement concrete block masonry with solid blocks type C1 1:3:6 (20mm graded aggregate) of size not less than 300x200x100mm as in continuous road edging width equal to depth of the pre cast concrete block laid dry on edge complete all as specified and directed.
M & L for precast cement concrete block masonry with solid blocks type C1 1:3:6 (20mm graded aggregate) of size not less than 300x200x100mm as in continuous road edging width equal to depth of the pre cast concrete block laid dry on edge except materials complete all as specified and directed.
M & L for 100mm thick Cement concrete type C-2, 1:3:6 (40mm graded aggregate) as in path/ hardstanding finished cement concrete surfaces fair and even complete all as specified and directed.
Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc. complete all as specified and directed.
M&L PCC (1:3:6) type C2 (40 mm graded aggregate ) in surface chanel and drain including demolition Cement concrete (unreinforced) of any description and in any position not otherwise specifically provided for complete all as specified and as directed.
M&L extra for forming fair finished drain or channel 30 cm inner girth in cement concrete using extra cement including forms, moulds , mitred / stopped ends complete all as specified and as directed.(Note:-Add or deduct for each 25 mm girth or part thereof over or under 30cm shall be adjusted in measurement).
M & L Walling of random rubble, uncoursed, well bonded, bedded and solidly hearted, built in Cement mortar 1:6 complete all as specified and as directed.
M & L Cement concrete Type D2 1:4:8 (40 mm graded aggregate) in foundations,filling and mass concrete complete all as specified and as directed.
M & L Providing, cement concrete(CAST-IN-SITU)in copings including weathering, slightly rounded or chamfered angles and throating, Type B0 1:2:4 (12.5 mm graded aggregate) complete all as specified and as directed.
M & L Reinforced cement concrete (nominal mix)Type B1 1:2:4 (20 mm graded aggregate) in cover slab of manhole complete all as specified and as directed.
M & L use and waste of formwork to soffits of suspended slabs such as roof slabs, floor slabs, landings and similar work;not exceeding 200mm thick (Horizontal or sloping)rough finished surfaces concrete complete all as specified and directed.
M & L TMT bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and as directed.
M & L TMT bars 5mm dia and over upto and including 10mm dia in stirrups, spacers and binders complete all as specified and as directed.
M & L rendering 15mm thick Cement plaster(1:6) on fair faces of brick work or concrete surfaces finished even and smooth (without using extra cement) complete all as specified and as directed.
Demolition of cement concrete (Unreinforced) of any description and in any position not otherwise specially provided for etc. complete all as specified and as directed.
Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits,manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out soft/loose soil complete all as specified and directed.(Note:- (a) Unit rate shall include for dressing/trimming sides and levelling/grading and ramming of bottoms of excavation.(b) The depth for any particular length of an excavation for the purpose of lift shall be the average depth at two ends).
M & L for returning filling in including spreading, levelling, watering and well ramming in layers n.exc 25cm in soft/loose soil complete all as specified and directed.(Note:-Measurements shall be those of the borrow pits,trenches, etc. from which the material is obtained. If this is found difficult or impracticable, measurements of the finished embankment, traverse of earth filling shall be taken after consolidation and 10% deducted to allow for increase in bulk after excavation. No deduction shall however be made in case of consolidated fills in confined places such as floors. Where the consolidation is done by heavy mechanical machinery or to the specified standard proctor density under optimum moisture conditions, deduction shall be 5 percent).
M & L for Removing of excavated materials of soils n.exc 50m and depositing where directed at a level n.exc 1.5m above the starting point complete all as specified and directed.(Note:-(a) The removal of spoil resulting from excavation performed by the Contractor shall be paid for, on the basis of solid contents measured before excavation. If measuring of the solid contents is found difficult or impracticable, the following percentage deductions shall be made to arrive at equivalent solid contents :- (i) 10 per cent deduction in all cases of consolidated fills except where the consolidation is done by heavy mechanical machinery or to the specified standard proctor density not less than 95 per cent under optimum moisture conditions, in which case the deduction shall be 5 per cent.(ii) No deduction shall be made in the case of consolidated fills in confined situations like floors.(iii) 20 per cent deduction when spoil excavated from soft/loose soil or hard/dense soil is measured in loose stacks or in carts or lorries. (iv) No deduction shall be made when spoil excavated is sand.(v) 50 per cent deduction when spoil excavated from soft/disintegrated rock or hard rock is measured in loose stacks or in carts or lorries. (b) In working out lead for large areas of excavation, the excavated areas shall be divided into suitable blocks and for each block the distance from the centre of block to the centre of placed earth pertaining to the corresponding block shall be taken as lead.(c) Theunit rates for removal of spoil include for loading into and unloading from barrows, carts, baskets, etc., or mechnical transport vehicles. In the case of spoil heaps which, in the opinion of the GE, have consolidated and require loosening before removal half the rate for rough excavation in soft soil shall be allowed in addition. However, this additional payment shall not be permitted for spoil heaps requiring loosening due to Contractor’s default. Decision of GE whether a spoil heap needs loosening or not, shall be final and binding.(d) Removal shall be assumed to be done by the shortest practicable route, and payment shall not necessarily be made for the route actually taken. No additional payment shall be allowed for roads in bad repair,gradients, or carting over consolidated ground .(e) In case excavated materials are removed to the place of use or disposed directly without being first placed clear of the edge of excavation, no adjustment shall be made in the unit rates for removal of spoil.).
M/s SUNIL THAKURI
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .