Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹20.5 Laccepted-aoc | ₹20.5 L | accepted-aoc |
Tender Value
₹19.5 L
EMD Value
₹19,502
Closing Date
18 Jun 2026, 5:00 pmClosed
Superintending Engineer, IC, Sangareddy
Superintending Engineer, IC, Sangareddy
FDR Permanent Restoration of bund and weir of Pothula Kunta Sherpally Yelkurthi Village Tekmal Mandal Medak District
708121
10/2026-27, Dt:10.06.2026
OPEN
Similar Work
MEDAK
6 documents required · 6 mandatory
₹691
₹19,502
24 Jul 2026
10 Jun 2026
11 Jun 2026
Excavation in all kinds of soil including boulders upto 0.30 m dia for field channels, seating of embankment for field channels etc., including dressing of bed and sides to required profile, cost of all materials, machinery, labour, placing the excavated stuff for formation of service cost of all materials, machinery, labour, placing the excavated stuff for formation of service road / embankment as directed etc., complete with lead upto 10 m and lift upto 3 m.
Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning,etc.,complete with initial lead upto 1 km and all lifts.
Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm. Before compaction including cost of all materials, machinery, labour, all operations such as compacting to density control of not less than 90 percent or as stipulated using 2T roller etc., complete with initiallead upto 1 km and all lifts.
Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm. Before compaction including cost of all materials, machinery, labour, all operations such as compacting to density control of not less than 90 percent or as stipulated using 8T roller etc., complete with initiallead upto 1 km and all lifts.
Benching old embankment slopes 0.45 X 0.45 M
Providing cut-off trench filling using selected impervious soil from approved borrow areas in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil to specified thickness,breaking clods, sectioning, watering, compacting to density control of notless than 95 percent using Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller as stipulated etc., complete with initial lead upto 1 km and all lifts.
Providing and constructing 225 mm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing etc., complete( rubble stones : 0.2475 cum/sqm) (For Maintenance Works)
Excavation for Structures- Mechanical Means - Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of superplasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sqmm ) grade cement concrete using 20 mm downsize approved, clean, hard, graded aggregates for sub-structure / super-structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ-Pothula kunta,Tekmal (M).xls
TENDER_DOCUMENT • 0.27 MB
Bid Document-Pothula Kunta.doc
TENDER_DOCUMENT • 0.56 MB
Specification_Booklet.docx
TENDER_DOCUMENT • 5.88 MB
Schedule A Pothula kunta.xls
TENDER_DOCUMENT • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .