| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67,153.02Rejected-Finance | L1 | Rejected-Finance L1 | |
| 2 | L2₹81,365.46+₹14,212.44 (21.2%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | ANUNAY KUMAR DUBAY L2 | M/s Raja Ram Shukla Contractor L1 |
|---|---|---|---|---|---|
| 1.00 | Cutting narkul & moonj in both side at regulator including proper disposal beyond 100 mts . | 370 | M2 | 6.5 ₹2,405 | 5 ₹1,850 Lowest |
| 2.00 | Earth Work in cutting for clearance of drain with partial dressing both side of regulator including cost of all labour and T&P etc.required for comlection of work. | 74.3 | M3 | 66 ₹4,903.8 | 45 ₹3,343.5 Lowest |
| 3.00 | Earth Work in fiilling in all type soil i/c loading, unloading, carriage with proper manual compaction and dressing etc including cost of all labour and T&P etc.required for comlection of work. | 208.26 | M3 | 224 ₹46,650.24 | 190 ₹39,569.4 Lowest |
| 4.00 | Cleaning of regulator pipe portion sthool ,kachara and other etc complete. | 3 | No | 495 ₹1,485 | 450 ₹1,350 Lowest |
| 5.00 | Oiling & greesing of flapper gate | 3 | No | 600 ₹1,800 | 580 ₹1,740 Lowest |
| 6.00 | Painting of flapper with two coat including cost of all materials,labour and T&P etc.required for completion of work. | 4.62 | M2 | 203 ₹937.86 | 170 ₹785.4 Lowest |
| 7.00 | Distempering of flapper gate of abutment,wing wall,para pet with two coat oil bound distemper of approved make of Burger ,Jenson & Nicholsen ,Shaimar,Asian,Nerolac over on priming coat of cement primer on new surface after throughly brushing the surface free from morter dropping and other foreign matter and also including preparing the surface even with plaster of paris /shiting and sand papered smooth including cost all material ,labour and T&P ect.required for completion of works. | 173.88 | M2 | 61.2 ₹10,641.46 | 44 ₹7,650.72 Lowest |
| 8.00 | 1st class brick work in 1:4 cement mortar with new brick s, chopan coarse sand including all cost of material, labour and T&P erc complete for complition of work. | 1.94 | M3 | 6,465 ₹12,542.1 | 5,600 ₹10,864 Lowest |
Tender Value
₹81,000
EMD Value
₹2,000
Closing Date
12 Jun 2026, 2:00 pmClosed
Assistant Engineer-II, Flood Work Div-1,Basti
Assistant Engineer-II, Flood Work Div-1,Basti
CLEANING ,PAINTING AND REPAIR OF REGULATOR AT KM 5.800, 11.850 and 15.590 OF C.H. BUND ON RIGHT BANK OF RIVER MANWAR IN DISTT BASTI
2026_UPIDC_1157733_4
01/A.E-II/2026-27
Open Tender
Civil Works
Item Wise
7 days
Basti
Please refer Tender documents.
2 documents required · 2 mandatory
₹559
₹2,000
31 Jul 2026
6 Jun 2026
12 Jun 2026
6 Jun 2026
12 Jun 2026
6 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting narkul & moonj in both side at regulator including proper disposal beyond 100 mts . | 370 | M2 | - | - |
| 2 | Earth Work in cutting for clearance of drain with partial dressing both side of regulator including cost of all labour and T&P etc.required for comlection of work. | 74.3 | M3 | - | - |
| 3 | Earth Work in fiilling in all type soil i/c loading, unloading, carriage with proper manual compaction and dressing etc including cost of all labour and T&P etc.required for comlection of work. | 208.26 | M3 | - | - |
| 4 | Cleaning of regulator pipe portion sthool ,kachara and other etc complete. | 3 | No | - | - |
| 5 | Oiling & greesing of flapper gate | 3 | No | - | - |
| 6 | Painting of flapper with two coat including cost of all materials,labour and T&P etc.required for completion of work. | 4.62 | M2 | - | - |
| 7 | Distempering of flapper gate of abutment,wing wall,para pet with two coat oil bound distemper of approved make of Burger ,Jenson & Nicholsen ,Shaimar,Asian,Nerolac over on priming coat of cement primer on new surface after throughly brushing the surface free from morter dropping and other foreign matter and also including preparing the surface even with plaster of paris /shiting and sand papered smooth including cost all material ,labour and T&P ect.required for completion of works. | 173.88 | M2 | - | - |
| 8 | 1st class brick work in 1:4 cement mortar with new brick s, chopan coarse sand including all cost of material, labour and T&P erc complete for complition of work. | 1.94 | M3 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.61 MB
BOQ_2169658.xls
BOQ • 0.27 MB
Buklet.pdf
Tender Documents • 1.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .