| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.8 CrAccepted-AOC 11 JAMES HICKEY SARANI 2ND FLOOR KOLKATA 700069 | KOLKATA | KOLKATA | WEST BENGAL | 700069 | ₹29.8 Cr | L1 | Accepted-AOC BEING L1, BID ACCEPTED BEING OVERALL REASONABLE |
| 2 | L2₹31.3 Cr+₹1.5 Cr (5.15%)Rejected-Finance 2ND FLOOR 9 EZRA STREET KOLKATA WEST BENGAL 700001 | KOLKATA | KOLKATA | WEST BENGAL | 700001 | ₹31.3 Cr+₹1.5 Cr (5.15%) | L2 | Rejected-Finance OTHER THAN L1 |
| 3 | Rejected-Technical 3A RAM MOHAN MULICK GARDEN LANE UNIT NO 6A 3RD FLOOR KOLKATA 700010 | KOLKATA | WEST BENGAL | 700010 | - | - | Rejected-Technical not fulfilling NIT criteria |
| 4 | Rejected-Technical | - | - | Rejected-Technical not fulfilling NIT criteria |
| Sl No | Description | Qty | Unit | D R STEEL CONSTRUCTION COMPANY PRIVATE LIMITED L1 | surendra infrastructure pvt ltd L2 |
|---|---|---|---|---|---|
| 1.00SCHEDULE "A" | |||||
| 2.00SCHEDULE "A" Part-I (Building/Structures) (To be quoted by the Contractor) Building Works mentioned at item no 1 is in DESIGN AND BUILD Mode. Contractors has to carry out the detailed engineering design of these buildings, procure all the equipments and materials necessary and then construct to deliver a fully functional facility to the MES department. | |||||
| 3.00 | Item No 1: Designing and construction of block of Single Men Barracks For Agniveers including cook house, dining hall, ante room with precast construction technology all as per design basis report, drawing, SBC detailed in scope of work and other documents of the tender complete all specified and directed. | 1 | Lump sum | 22,78,44,485 ₹22,78,44,485 | 22,01,45,692.5 ₹22,01,45,692.5 Lowest |
| 4.00 | Sch 'A' Part-II (External Electric Supply) Lump sum price worked out by the contractor for (External Electric Supply) as listed in Schedule 'A' Part-II against the lump sum price inserted by the MES. | 1 | Lump sum | 42,95,685 ₹42,95,685 | 41,43,843 ₹41,43,843 Lowest |
| 5.00 | Sch 'A' Part-III (External Water supply) Lump sum price worked out by the contractor for (External Water supply) as listed in Schedule 'A' Part-III against the lump sum price inserted by the MES. | 1 | Lump sum | 2,24,385 ₹2,24,385 Lowest | 2,92,123 ₹2,92,123 |
| 6.00 | Sch 'A' Part-IV (Road Path Culvert) Lump sum price worked out by the contractor for (Road Path Culvert) as listed in Schedule 'A' Part-IV against the lump sum price inserted by the MES. | 1 | Lump sum | 96,71,825 ₹96,71,825 Lowest | 1,51,05,396 ₹1,51,05,396 |
| 7.00 | Sch 'A' Part-V (Sewage Disposal) Lump sum price worked out by the contractor for (Sewage Disposal) as listed in Schedule 'A' Part-V against the lump sum price inserted by the MES. | 1 | Lump sum | 19,68,425 ₹19,68,425 Lowest | 24,36,313 ₹24,36,313 |
| 8.00 | Sch 'A' Part-VI (Area Drainage) Lump sum price worked out by the contractor for (Area Drainage) as listed in Schedule 'A' Part-VI against the lump sum price inserted by the MES. | 1 | Lump sum | 12,36,810 ₹12,36,810 Lowest | 17,79,466 ₹17,79,466 |
| 9.00 | Sch 'A' Part-VII (Security Fencing & Gate) Lump sum price worked out by the contractor for (Security Fencing & Gate) as listed in Schedule 'A' Part-VII against the lump sum price inserted by the MES. | 1 | Lump sum | 88,845 ₹88,845 Lowest | 91,908 ₹91,908 |
| 10.00 | Sch 'A' Part-VIII (Summer & cooling Applinces) Lump sum price worked out by the contractor for (Summer & cooling Applinces) as listed in Schedule 'A' Part-VIII against the lump sum price inserted by the MES. | 1 | Lump sum | 25,67,190 ₹25,67,190 Lowest | 33,55,728 ₹33,55,728 |
Tender Value
₹27.7 Cr
EMD Value
₹15 L
Closing Date
7 Nov 2025, 6:00 pmClosed
Chief Engineer Jabalpur Zone
HQ Chief Engineer Jabalpur Zone Ridge Road Jabalpur Cantt 482001
PROVN OF SINGLE MEN BARRACKS INCLUDING COOK HOUSE IN EPC MODE FOR AGNIVEERS AT 1 STC JABALPUR
2025_MES_725970_1
752986A PROVN OF SINGLE MEN BARRACKS INCLUDING COOK HOUSE IN EPC MODE FOR AGNIVEERS AT 1STC JABALPUR
Open Tender
Civil Works
Lump-sum
548 days
JABALPUR
AS PER NIT
8 documents required · 8 mandatory
₹3,000
GE P No 1 Jabalpur
₹15 L
Yes
14 Aug 2026
12 Sept 2025
14 Nov 2025
12 Sept 2025
7 Nov 2025
31 Oct 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SCHEDULE "A" | - | - | - | - |
| 2 | SCHEDULE "A" Part-I (Building/Structures) (To be quoted by the Contractor)
Building Works mentioned at item no 1(A), Item No 1(B) & Item No 1(C) is in ENGINEERING PROCUREMENT CONSTRUCTION (EPC) Mode. Contractors has to carry out the detailed engineering design of these buildings, procure all the equipments and materials necessary and then construct to deliver a fully functional facility to the MES department. | - | - | - | - |
| 3 | Item No 1 (A): Designing (Structurally & Aesthetically) and construction of block of Single Men Barracks For Agniveers with precast construction technology (2D) permanent specification for (G+3) Storey RCC Framed Structure all as per design basis report, detailed in scope of work and other documents of the tender complete all specified and directed. | 1 | Lump sum | - | - |
| 4 | Item No 1 (B): Designing (Structurally & Aesthetically) and construction of block of Dining Hall & Anti Room For Agniveers with precast construction technology (2D) permanent specification for Storey RCC Framed Structure all as per design basis report, detailed in scope of work and other documents of the tender complete all specified and directed. | 1 | Lump sum | - | - |
| 5 | Item No 1 (C): Designing (Structurally & Aesthetically) and construction of block of Cook House For Agniveers with precast construction technology (2D) permanent specification for Storey RCC Framed Structure complete all as per design basis report, detailed in scope of work and other documents of the tender complete all specified and directed. | 1 | Lump sum | - | - |
| 7 | Sch 'A' Part-II (External Electric Supply) Lump sum price worked out by the contractor for (External Electric Supply) as listed in Schedule 'A' Part-II against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 8 | Sch 'A' Part-III (External Water supply) Lump sum price worked out by the contractor for (External Water supply) as listed in Schedule 'A' Part-III against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 9 | Sch 'A' Part-IV (Road Path Culvert) Lump sum price worked out by the contractor for (Road Path Culvert) as listed in Schedule 'A' Part-IV against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 10 | Sch 'A' Part-V (Sewage Disposal) Lump sum price worked out by the contractor for (Sewage Disposal) as listed in Schedule 'A' Part-V against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 11 | Sch 'A' Part-VI (Area Drainage) Lump sum price worked out by the contractor for (Area Drainage) as listed in Schedule 'A' Part-VI against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_817972.xls
BOQ • 0.44 MB
TENDER.pdf
Tender Documents • 8.71 MB
c22.pdf
PDF • 0.44 MB
752986.pdf
PDF • 0.18 MB
c20.pdf
PDF • 0.15 MB
c19.pdf
PDF • 0.15 MB
c18_merged.pdf
PDF • 0.83 MB
C_15.pdf
PDF • 0.18 MB
752986_001.pdf
PDF • 0.18 MB
986.pdf
PDF • 0.18 MB
752986.pdf
PDF • 0.18 MB
752986_C11.pdf
PDF • 0.18 MB
C_01.pdf
PDF • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .