| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC | ₹1.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.6 CrRejected-AOC | ₹1.6 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹1.6 CrRejected-AOC | ₹1.6 Cr | L3 | Rejected-AOC L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non-responsive |
| 5 | Rejected-Technical | - | - | Rejected-Technical Non-responsive |
| Sl No | Description | Qty | Unit | Monjur Alam L2 | AMINUR RAHMAN L3 | DREAMZ IMPEX L1 |
|---|---|---|---|---|---|---|
| 1.00 | Civil works
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:
All kinds of soil | 240.7 | cum | 113.42 ₹27,300.19 | 113.42 ₹27,300.19 | 113.42 ₹27,300.19 |
| 2.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m | 461.91 | cum | 269.19 ₹1.2 L | 269.19 ₹1.2 L | 269.19 ₹1.2 L |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 77.11 | cum | 7,243.4 ₹5.6 L | 7,243.4 ₹5.6 L | 7,243.4 ₹5.6 L |
| 4.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 36.34 | cum | 8,866.05 ₹3.2 L | 8,866.05 ₹3.2 L | 8,866.05 ₹3.2 L |
| 5.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 91.42 | cum | 10,796.15 ₹9.9 L | 10,796.15 ₹9.9 L | 10,796.15 ₹9.9 L |
| 6.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 4.13 | cum | 11,362.46 ₹46,881.51 | 11,362.46 ₹46,881.51 | 11,362.46 ₹46,881.51 |
| 7.00 | Supplying, fitting and fixing in position reinforcement bars conforming to relevant I.S. Code for R.C.C. work/ R.B. walling including straightening, cleaning, cutting and bending to proper shapes and length as per details, supplying and binding with 20G annealed black wire and placing in position with proper blocks, supports, chairs, spacers etc. complete (upto 1st floor level).
TMT-Corrosion Resistant Steel (Fe-500) reinforcement bar | 5,769.17 | kg | 94.29 ₹5.4 L | 94.29 ₹5.4 L | 94.29 ₹5.4 L |
| 8.00 | Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete | 38.25 | sqm | 326.43 ₹12,485.95 | 326.43 ₹12,485.95 | 326.43 ₹12,485.95 |
| 9.00 | Centering and shuttering including strutting, propping etc. and removal of form for
Lintels, beams, plinth beams, girders, bressumers and cantilevers | 187.75 | sqm | 644.85 ₹1.2 L | 644.85 ₹1.2 L | 644.85 ₹1.2 L |
| 10.00 | CCentering and shuttering including strutting, propping etc. and removal of form for
olumns, Pillars, Piers, Abutments, Posts and Struts | 252.89 | sqm | 852.5 ₹2.2 L | 852.5 ₹2.2 L | 852.5 ₹2.2 L |
Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
5 Sept 2025, 2:00 pmClosed
Mission Director
SSA, Kahilipara, Guwahati
Construction of school building for upgradation from upper primary to secondary under Samagra Shiksha, Assam
2025_SSA_46720_1
E-686287/353
Open Tender
Civil Works - Building
SSA, Kahilipara, Guwahati
As per tender document
4 documents required · 4 mandatory
₹3,300
Yes
₹3.2 L
Yes
SSA, Kahilipara, Guwahati
17 Feb 2026
20 Aug 2025
5 Sept 2025
20 Aug 2025
5 Sept 2025
20 Aug 2025
21 Aug 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid