| 1 | L-1₹28.4 LAccepted-AOC | ₹28.4 L | L-1 | Accepted-AOC Technocommercially eligible L-1 Bidder |
| 2 | L-2₹28.6 L+₹19,011.55 (0.67%)Rejected-Finance | ₹28.6 L+₹19,011.55 (0.67%) | L-2 | Rejected-Finance L-2 As per BOQ Summary details |
| 3 | L-3₹30.5 L+₹2.2 L (7.65%)Rejected-Finance SHIVPURI COLONY PO JODHADIH MORE DISTT BOKARO JHARKHAND 827013 | BOKARO | BOKARO | JHARKHAND | 827013 | ₹30.5 L+₹2.2 L (7.65%) | L-3 | Rejected-Finance L-3 As per BOQ Summary details |
| 4 | L-4₹30.6 L+₹2.2 L (7.93%)Rejected-Finance | ₹30.6 L+₹2.2 L (7.93%) | L-4 | Rejected-Finance L-4 As per BOQ Summary details |
| 5 | L-5₹31.9 L+₹3.5 L (12.3%)Rejected-Finance | ₹31.9 L+₹3.5 L (12.3%) | L-5 | Rejected-Finance L-5 As per BOQ Summary details |
Tender Value
₹49.0 L
EMD Value
₹61,300
Closing Date
2 Jun 2026, 10:00 amClosed
Staff Officer (Civil), NK Area.
Office of the General Manager, NK Area Dakra
Roof treatment with APP of 54 units B Type block and 40 Unit A- Type block in Purnadih Colony under Purnadih Project, NK Area.
2026_CCL_360047_1
SO(C)/NK/e-tender/26-27/68
Open Tender
Civil Works - Others
Percentage
60 days
Purnadih Project NK Area
As per NIT
3 documents required · 3 mandatory
₹61,300
24 Jun 2026
22 May 2026
3 Jun 2026
23 May 2026
2 Jun 2026
23 May 2026
23 May 2026 - 30 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Grading roof for water proofing treatment with Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size). | 196 | Cum | 7,562.7 | ₹14,82,289.2 |
| 2 | Providing and laying APP (Atactic Polypropylene Polymer) modified prefabricated five layer, 3 mm thick water proofing membrane, black finished reinforced with glass fibre matt consisting of a coat of bitumen primer for bitumen membrane @ 0.40 litre/sqm by the same membrane manufactured of density at 25°C, 0.87 - 0.89 kg/litre and viscocity 70 - 160 cps. Over the primer coat the layer of membrane shall be laid using butane torch and sealing all joints etc., and preparing the surface complete. The vital physical and chemical parameters of the membrane shall be as under : Joint strength in longitudinal and transverse direction at 23°C as 350/300 N/5 cm. Tear strength in longitudinal and transverse direction as 60/80N. Softening point of membrane not less than 150°C. Cold flexibility shall be upto -2°C when tested in accordance with ASTM, D - 5147. The laying of membrane shall be got done through the authorised applicator of the manufacturer of membrane :3mm thick. | 4,900 | Sqm | 450.3 | ₹22,06,470 |
| 3 | Removal of old tarfelt and disposal of debris with all leads complete job as per direction of E/I. | 4,900 | Sqm | 55.8 | ₹2,73,420 |
| 4 | 12 mm cement plaster of mix:1:4(1 cement: 4 fine sand). | 475 | Sqm | 245.9 | ₹1,16,802.5 |
| 5 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 285 | Sqm | 33.2 | ₹9,462 |
| 6 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply and all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. Internal work - Exposed on wall .25 mm nominal dia Pipes. | 95 | Meter | 332.05 | ₹31,544.75 |
| 7 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply and all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. Internal work - Exposed on wall.20 mm nominal dia Pipes. | 95 | Meter | 279.2 | ₹26,524 |
| 8 | Carriage of Materials By Mechanical Transport including loading,unloading and stacking Lime, moorum, building rubbish Lead - 5 km. | 25 | Cum | 179.25 | ₹4,481.25 |
| 9 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_372925.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.42 MB
BOQ_372925.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .