Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.7 LAccepted-AOC POLICE LINE HOUSE NO 8 GULAB BAGH BAJRANG NAGAR KOTA | KOTA | RAJASTHAN | ₹74.7 L | L1 | Accepted-AOC Work order attached |
| 2 | L2₹78.0 L+₹3.3 L (4.43%)Rejected-Finance 101 GROUND FLOOR MEHTA BHAVAN DURGA NURSARY RAOD UDAIPUR RAJASTHAN 313001 | UDAIPUR | RAJASTHAN | 313001 | ₹78.0 L+₹3.3 L (4.43%) | L2 | Rejected-Finance Document attached |
| 3 | L3₹81.9 L+₹7.2 L (9.61%)Rejected-Finance | ₹81.9 L+₹7.2 L (9.61%) | L3 | Rejected-Finance Document attached |
Tender Value
₹75 L
EMD Value
₹1.5 L
Closing Date
5 Nov 2022, 10:00 amClosed
Dean SKNCOA Jobner
Dean SKNCOA Jobner
E-tender for supply and installation of network equipment at SKNAU campus , Jobner (Rajasthan).
2022_SKNAU_302186_1
ETENDER/NAHEP/SKNAU/2022-23/16
Open Tender
Miscellaneous Works
Item Rate
365 days
Dean SKNCOA Jobner
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
PI, IDP-NAHEP, SKNAU JOBNER
₹1.5 L
Yes
8 Dec 2022
20 Oct 2022
5 Nov 2022
20 Oct 2022
5 Nov 2022
21 Oct 2022
Amount
Network Switch
Fiber Switch
Access Switch
Network Access Gateway
Digital subscriber line access multiplexer
Access Points indoor
Access Points
Access Points Outdoor
SFP Trans receiver
LIU 48 port (Loaded)
LIU 24 port (Loaded)
LIU 12 port (Loaded)
SC LC Patch Cords
CAT 6 cable
I/o points
Wall Network Rack 12U
OFC cable 48 core armoured
OFC cable 12 core armoured
Fiber cable Laying campus wide
Consumables items,& Electrical Work etc • Supply and installation of 1 MM ISI marked Wire. • Supply and Installation of 3 Socket 6 AMP electricity Board. • Electrical Panel Integration with electricity board. • Testing of electricity circuit up to each component at rack location. • Testing of Volt leakage and power leakage at each rack location. • Integration of existing power backup with Electrical panal power supply. • Integration of power backup with Electrical panal power supply. • Electrical Earthing testing.
Cabling Work 1. Floor & Wall Furnishing After cabling with cement And Suitable Material (Under finishing works) like The Cabling must include 1 inch PVC pipe, with PVC clamps and PVC flexible pipe 2. Supply and installations of required RJ45 connectors. With all required terminations at site. 3. IT includes all testing of terminated cables. 4. Installation of SC connectors and SM pigtails and Fixing of all LIUs into racks. 5. Splicing and terminations of required OFC segments cores into LIUs by identifying each core and respective connectivity. Management of OFC cables near Racks. 6. Mounting Racks at proper height, it includes all consumables required to install and run the rack. 7. Tagging of CAT6 and OFC by identifying each segment. 8. Mounting switches into racks and installation for each location. 9. Ground survey for Digging at site. 10. Depth and terrain analysis of site. 11. Path marking for Cable Laying at site. 12. Digging/ Drilling the Pilot bore. 13. Installation of HDPE Duct pipe.. 14. Cementing of open heads at peer locations. 15. Clamping the pipes in open area with wall/surrounding structure. 16. Drilling and filling holes in walls and civil structures. 17. Complete Project documentation after completion of Project.
HDPE Duct
Inverter UPS
R S Enterprise
eNetwork Solutions
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .