| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36 CrAccepted-AOC 103 KUNJ KUTIR COMPLEX NEAR TULSIDHAM CHAR RASTA MANJALPUR VADODARA 390011 GUJARAT | VADODARA | VADODARA | GUJARAT | 390011 | ₹36 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹41.8 Cr+₹5.8 Cr (16.2%)Rejected-Finance F 31 INDUSTRIAL AREA PHASE VIII SAS NAGAR MOHALI 160071 | S A S NAGAR | PUNJAB | 160071 | ₹41.8 Cr+₹5.8 Cr (16.2%) | L2 | Rejected-Finance L2 |
| 3 | L3₹42.5 Cr+₹6.5 Cr (18.1%)Rejected-Finance 807 PEARL BUSINESS PARK NETAJI SUBHASH PLACE PITAMPURA DELHI | DELHI | DELHI | ₹42.5 Cr+₹6.5 Cr (18.1%) | L3 | Rejected-Finance L3 |
| 4 | L4₹47.7 Cr+₹11.7 Cr (32.5%)Rejected-Finance | ₹47.7 Cr+₹11.7 Cr (32.5%) | L4 | Rejected-Finance L4 |
| 5 | L5₹57 Cr+₹21 Cr (58.3%)Rejected-Finance RG METRO ARCADE SECTOR 11 ROHINI DELHI 110085 | DELHI | NORTH WEST DELHI | DELHI | 110085 | ₹57 Cr+₹21 Cr (58.3%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | Anand Associates L4 | Hydrotech Paryavaran India Pvt. Ltd. L1 | PULKIT PROJECTS PRIVATE LIMITED L3 | Radikale Engineeing Pvt. Ltd L2 | ENVIRO INFRA ENGINEERS LIMITED L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Design and Construction of 20 MLD Capacity STP based on activated sludge process SBR technology including inlet chamber, mechanical screen, fine bar screen, grit chamber, distribution chamber, SBR with tertiary treatment, chlorination tank with Tonner Yard, gravity sludge thickener, sludge sump and pump house, polymer dosing tanks, centrifuge platform, centrifuge feed pumping station, supernatant and concentrate collection sump, blower room, Electric Sub-station room, LT/HT panel room, Staff Quarter, Admin Building, providing and laying 600mm dia DI K-9 Pipeline, PLC and SCADA control as per CPHEEO norms to meet CPCB/NGT standards/latest guidelines. | 1 | Job | 36,70,00,000 ₹36,70,00,000 | 29,28,80,000 ₹29,28,80,000 Lowest | 32,70,00,000 ₹32,70,00,000 | 32,40,00,000 ₹32,40,00,000 | 40,00,00,000 ₹40,00,00,000 |
| 9.00 | Operation & Maintenance - Operation and maintenance cost for STP, all other works created under the contract for 10 years as well as for defect liability period of 12 months which includes basic service charges having expenditure and expenses required to be incurred on labour, repair and / or replacement of materials, equipments, consumable items, water and all other matters and items of what so ever nature, essential and desirable to run the system satisfactory, Administration and Management, Running of Office, Comprehensive Operation, Maintenance and Repairs including Preventive Maintenance, other Consumables (except Polyelectrolyte and chlorine taken separately in BOQ) as per Scope of Work & terms and conditions of contract etc. complete. | 1 | Job | 11,00,00,000 ₹11,00,00,000 | 12,55,20,000 ₹12,55,20,000 | 9,81,00,000 ₹9,81,00,000 | 9,70,00,000 ₹9,70,00,000 Lowest | 17,00,00,000 ₹17,00,00,000 |
Tender Value
Refer Docs
EMD Value
₹90 L
Closing Date
4 Sept 2025, 5:00 pmClosed
ANKIT BHARDWAJ
Division FMDA
Designing, Construction and Commissioning of 20 MLD capacity STP on SBR technology with Tertiary Treatment to achieve the required parameters with 03 Months trial run, 10 years of O and M after completion of 1 year DLP
2025_HRY_459772_1
2025563D171D BCDE 4C9D AA1F 1B5D43AE03351851002
Open Tender
Civil Works
Works
545 days
Faridabad (MC)
2 documents required · 2 mandatory
₹1,180
₹90 L
Yes
FMDA Office, SCO-28-32, Sector-12, Faridabad
1 May 2026
19 Jul 2025
5 Sept 2025
19 Jul 2025
4 Sept 2025
19 Jul 2025
19 Jul 2025 - 21 Jul 2025
24 Jul 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Design and Construction of 20 MLD Capacity STP based on activated sludge process SBR technology including inlet chamber, mechanical screen, fine bar screen, grit chamber, distribution chamber, SBR with tertiary treatment, chlorination tank with Tonner Yard, gravity sludge thickener, sludge sump and pump house, polymer dosing tanks, centrifuge platform, centrifuge feed pumping station, supernatant and concentrate collection sump, blower room, Electric Sub-station room, LT/HT panel room, Staff Quarter, Admin Building, providing and laying 600mm dia DI K-9 Pipeline, PLC and SCADA control as per CPHEEO norms to meet CPCB/NGT standards/latest guidelines. | 1 | Job | - | - |
| 9 | Operation & Maintenance - Operation and maintenance cost for STP, all other works created under the contract for 10 years as well as for defect liability period of 12 months which includes basic service charges having expenditure and expenses required to be incurred on labour, repair and / or replacement of materials, equipments, consumable items, water and all other matters and items of what so ever nature, essential and desirable to run the system satisfactory, Administration and Management, Running of Office, Comprehensive Operation, Maintenance and Repairs including Preventive Maintenance, other Consumables (except Polyelectrolyte and chlorine taken separately in BOQ) as per Scope of Work & terms and conditions of contract etc. complete. | 1 | Job | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 18.70 MB
BOQ_537505.xls
BOQ • 0.24 MB
BOQ.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .