| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.2 LAdmitted-Fee/PreQual/Technical/Finance | -16.76% | ₹8.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹8.7 L+₹44,392.25 (5.41%)Admitted-Fee/PreQual/Technical/Finance VILLAGE JAITPUR PO JAYANT DISTT SINGRAULI MP 486890 | JAYANT | SINGRAULI | MP | 486890 | -12.26% | ₹8.7 L+₹44,392.25 (5.41%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹8.7 L+₹46,957.14 (5.72%)Admitted-Fee/PreQual/Technical/Finance SECTOR NO C NANDGAON NIGAH DISTT SINGRAULI MP 486 886 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486886 | -12.00% | ₹8.7 L+₹46,957.14 (5.72%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹9.3 L+₹1.1 L (12.8%)Admitted-Fee/PreQual/Technical/Finance VILL GHURITAL PO WAIDHANI DISTT SINGRAULI MP PIN 486886 | SINGRAULI | MADHYA PRADESH | 486886 | -6.10% | ₹9.3 L+₹1.1 L (12.8%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹9.4 L+₹1.2 L (14.1%)Admitted-Fee/PreQual/Technical/Finance | -5.00% | ₹9.4 L+₹1.2 L (14.1%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.9 L
EMD Value
₹12,400
Closing Date
8 Sept 2026, 11:00 amClosed
S.O. Civil Block B Area NCL Singrauli
CIVIL ENGG. DEPT. BLOCK B AREA NCL Singrauli
Platform for Baba Saheb Ambedkar Statue at Block-B Project
2026_NCL_364276_1
NCL/CIVIL/BLB/26-27/ETN/12 Dated 25.08.2026
Open Tender
Civil Works - Others
Percentage
90 days
CIVIL ENGG. DEPT. BLOCK B AREA NCL Singrauli
Refer NIT
4 documents required · 4 mandatory
₹12,400
9 Sept 2026
27 Aug 2026
9 Sept 2026
27 Aug 2026
8 Sept 2026
28 Aug 2026
27 Aug 2026 - 1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Item Description/ Heading | - | - | - | - |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as
directed, within a lead of 50 m. All kinds of soil. | 10.13 | cum | 206.7 | ₹2,093.87 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 3.38 | cum | 170.25 | ₹575.44 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.34 | cum | 5,402.95 | ₹18,045.85 |
| 6 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 1.48 | cum | 1,634.25 | ₹2,418.69 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 3.14 | cum | 6,908.3 | ₹21,692.06 |
| 8 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natu- ral sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.22 | cum | 8,147.5 | ₹1,792.45 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 2.9 | cum | 8,482.4 | ₹24,598.96 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars | 626 | kg | 101.25 | ₹63,382.5 |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete | 12.48 | sqm | 218 | ₹2,720.64 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.92 MB
BOQ_377185.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .