Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical 1 165 2 ADARSH NAGAR AURI MORE ANPARA SONBHADRA UTTAR PRADESH 231225 | SONBHADRA | UTTAR PRADESH | 231225 | Rejected-Technical NOT AS PER PQC |
Tender Value
₹2.6 L
EMD Value
₹5,500
Closing Date
30 Apr 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE OMC-IV BTPS OBRA
OFFICE OF S.E., OMC-IV, BTPS, OBRA-SONEBHADRA (UP), PIN-231219, PHONE-9415900033
Overhauling work of Generator, bus duct and its Auxiliaries of 200MW Unit No. 11
2024_RVUNL_921278_1
T2/OMC-IV/EMD-I/6000005115
Open Tender
Electrical Works
Fixed-rate
30 days
EMD-I BTPS OBRA
Please refer tender doc
3 documents required · 3 mandatory
₹296
Dy CAO CFA and BO BTPS OBRA
₹5,500
28 May 2024
4 Apr 2024
1 May 2024
4 Apr 2024
30 Apr 2024
4 Apr 2024
Amount
Following works shall be carried out on Generator during O/H of unit no.11
O/H & preventive maintenance of 15.75KV bus duct inside T.G.hall
H2 Gas purging & recharging.
O/H work of Gen. P.T. cubicle protection metering & auxiliary PT cubical of R, Y, & B phases.
O/H work of earthing transformer & neutral grounding reactors:
Decoupling, removal, remounting alignment and coupling of AC/DC seal oil pumps
Attending leakage of oil from AC/DC seal oil pumps including replacement of seal if required.
Maintenance and greasing of bearings in A.C. seal oil pump.
Reconditioning of all 15.75kv bus duct perplex containers.
Monitoring and maintaining the level of hydraulic seal oil tank round the clock manually by opening and closing the adjacent valve after float valve (when required) from charging of Gen seal till completion of overhauling work.
Normalizing seal oil system and draining oil from Gen. casing and hydraulic seal oil tank round the clock (when required) from charging of Gen seal till completion of overhauling work.
Repair of cooling pipe circuit of mechanical seal of AC/DC Seal oil pump.
Fabrication and installation of ladder from 0m to 8m cable trench.
Repairing of fencing around earthing transformer and NGR.
Repairing of fencing around 15.75 bus duct excitation cable portion at zero meter near NGR.
Isolation and reconnection of 15.75KV bus duct outside T.G. Hall from manhole near A-Axis wall.
Cleaning & Double coat painting work in Bus duct from general to a-axis of the turbine hall (phase & neutral side) with structure.( approx260 M2 )
Cleaning & Double coat painting work in Neutral grounding transformer with reactor and fencing.(approx. 75 M2 )
Cleaning & Double coat painting work in P. T. cubical box and its duct. (approx. 84 M2 )
Cleaning & painting work of Generator stator. (Approx. area 170 Sq.M.)
Painting and Cleaning work of Seal oil system (including Damper Tank, & all associated pipelines), expansion tank (including all associated pipelines), Gas system (including all associated pipelines), Excitation duct (Approx. area 400 Sq.M.)
M/s Neha Conditioning & Refrizration Services
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .