| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹90.8 LAccepted-AOC NO 31 MAIN ROAD PANDAVAKKAM UTHIRAMERUR 603 107 | UTHIRAMERUR | KANCHEEPURAM | TAMIL NADU | 603107 | L1 | Accepted-AOC L1 Tenderer | |
| 2 | L2₹91.1 L+₹34,450.94 (0.38%)Rejected-Finance | L2 | Rejected-Finance L2 Tenderer |
Tender Value
₹92.0 L
EMD Value
₹92,000
Closing Date
17 May 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director DRDA Kancheepuram
O/o The Project Director DRDA Kancheepuram
Strengthening Oddanthangal Road in KM 0/0 to 2/300 (R-87 ) In Oddanthangal Panchayat in Uthiramerur Panchayat Union in Kancheepuram District Package No TNKPM 28/2022-23 Under MGSMT 2022-23
2023_RDTN_308867_1
DIPR/2142/Tender/2023 dt.14.04.2023
Open Tender
Civil Works - Roads
Lump-sum
180 days
O/o The Project Director DRDA Kancheepuram
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹92,000
Yes
O/o The Project Director DRDA Kancheepuram
12 Jul 2023
29 Apr 2023
17 May 2023
29 Apr 2023
17 May 2023
29 Apr 2023
8 May 2023
Amount
Strengthening Oddanthangal Road in KM 0/0 to 2/300 (R-87 ) In Oddanthangal Panchayat cost of Construction cost Rs.83.67 Lakh & Maintaenance Cost Rs.8.28 lakh
Clearing the scrub jungle including all labour charges for burrying and burning etc
Picking the worn out BT including all other labour charges etc complete
Providing and laying spreading & Compacting graded stone aggeragate to Wet Mix Macadam specification including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface & Compacting with vibratory roller to achieve the desired as per MORT & H specification 406 IV revison
Applying Primecoat over WMB/WMM surface at 7.00kg of SS-1 Bitumen Emulsion / 10sq.m including labour for spraying, hire charges for bitumen sprayer etc comp
Applying Tack coat over the BT surface using with Emulsion bitumen binder 2.5kg/10 Sq.M., Including cost & conveyance of all Materials and all Labour charges etc complete
BC 25/30/40mm thick (Grade II) using VG 30 Bitumen and plastic waste providing and laying bituminous concrete to 30/40mm thick using 0.13 cum of 19.00-9.50mm 0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 46.28kg Per clause 507 of MORTH rev05
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for curring sidedrain etc complete as per SS20A
Collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site am labour charges etc
Filling of gravel for side berms including all cost and conveyance and labour charges etc complete
Provision For HM Stone
Provision For KM Stone
Construction of RCC Slab culvert 1.50m Span at ch 1950m
Earth work Excavation for Foundation of structures upto 3.00m depth as per drawing and technical specification clause 1104 including seting out construction of suring and bracing removal stumps and other deletarious methods dressing of sides and bottoms and back filling with approved material
Supply and filling foundation and basement with filling sand in layer not more than 15cm thick well ramed watered and compacted complete complying with standard specification
Cement conrete 1:4:8 mix using 40 MM HBG Metal for foundation including watering wherever necessary and laiding layers of not more than 50cm thick compacting etc. Complete complying with standard specification and as directed by the departmental officials
Cement conrete 1:3:6 mix using 40 MM HBG Metal for foundation including watering wherever necessary and laiding layers of not more than 50cm thick compacting etc. Complete complying with standard specification and as directed by the departmental officials
Supply and erecting centering shuttering including necessary support for plain surface in foundation and basebent and in all floors for RCC column footing, column plinth beem, beems, roof slabs, stair case steps, bedblocks, critical pier etc., using mild steel sheets of size 90x60cm and 10 gage stiff and melded with MS angles of size 25x3mm car boarding laid over silver oak scantlings of size 10cm by 6.5cm spaced of about 90cm c/cand supported by casurina props of 10cm to 13cm dia space at 75 cm C/C completed compyling with standard specification ans as directed by departmental offices etc. completed
Below Sill
Deck Slab
Supplying and Fabricating and placing in position MS steel or Ribbed Tor steel for all Reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors ect, complete complying with stanard specification
Cement conrete 1:2:4 mix using 20 MM HBG Metal for foundation including watering wherever necessary and laiding layers of not more than 50cm thick compacting etc. Complete complying with standard specification and as directed by the departmental officials
Cement conrete 1:1.5:3 mix using 20 MM HBG Metal for all item of RCC works including watering wherever necessary and laiding layers of not more than 50cm thick compacting etc. Complete complying with standard specification and as directed by the departmental officials
Supplying and Fabricating and placing in position mid / tor steel for all RCC works as per the design given including cost of all steel binding wire and labour forfabrication etc complete complying with standard specification
Providing and fixing 6mm bitumen felt for expansion joint Between Dirtwell & Deck wall
Providing and fixing kraft paper for bearing between bed block & Deck slab
Providing and fixing 20mm bitumen pad between bed block & drit wall
Provindg weepholes in brick masonry / stone masonry plain / reniforced concreteeee abultment wing wall retune wall with 100mm dia AC pipe extending through the full width of the structure with slope towards drawing face complete
Road making with hot applied Thermoplastic Compound with Reflectorising Glass beads on bituminous surface
Provision for 90cm equilateral triangle cautionary signboard
Provision for 60cm equilateral triangle cautionary signboard
Provision for speed Bareaker sign speed Breaker to be painted
Blind curve - Cautionary sign board need to be provided on Blind curve on RHS with Speed breaker
Provision for 60mm circle (Mandatory sign)
Provision for Star sign sticker
Provision for MGSMT scheme citizen board and Common Name board
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
RMD CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .