Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹39.5 LAdmitted-Finance | -1.00% | ₹39.5 L | L1 | Admitted-Finance |
| 2 | L2₹39.9 LAdmitted-Finance | +0.00% | ₹39.9 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Reject |
Tender Value
₹39.9 L
EMD Value
₹79,800
Closing Date
22 Jan 2026, 12:00 pmClosed
EXECUTIVE OFFICER
NAGAR PALIKA PARISHAD HAPUR
Ward no- 39 masjid pura road per Haji Ayub ke karyalay ke pass se gali number 9 ke pass Tak RCC ka kaward nala ka Nirman karya
2026_DOLBU_1106482_3
1629/23/PWD/2025_26 Dt. 14_01_202
Open Tender
Miscellaneous Works
120 days
Hapur
Tender Fee, EMD and Other documents as per the tender document/NIT
2 documents required · 2 mandatory
₹4,720
EO NPP HAPUR
₹79,800
16 Feb 2026
16 Jan 2026
22 Jan 2026
16 Jan 2026
22 Jan 2026
16 Jan 2026
Dismantling of old brick work with cement mortar and including stacking of materials as directed by the Engineer in charge with in a distance of 60 metre.(sor no=17.01-692)
Making Of Bandha including Labour T & P
Providing of empty cement bag field by carted earth for making banda with straching putting earth filling including of all work complete.
Dsilting of silt from exesting drain clearance etc and including of all work complete .(S.I -251+25% for silt clearance.)
Disposal of surplus material and cartage up to 5 km only.
Earth work in excavationin / silting of mud and soil mix mooram,shingal kankar etc and includingof all work complete .(S.I -252)
Earth work in filling with cartage up to 8 km only.(anly)
P.C.C 1:4:8 cement core sand and stone Ballast in foundation and under floors including supply of all materials labour tools and plants etc. required for proper completion of the work..(sor no=5.08=281)
R.C.C. Work with cement, approved coarse sand & 4cm gauge approved stone ballast proportions of 1:1.5:3 in rafts foundation and footing with . (sor no=5.14=287)
R.C.C. Work with cement, approved coarse sand & 2cm gauge approved stone grits proportions of 1:1.5:3 in wall/ column . (sor no=5.16=288)
R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:2:4 in slabs. (sor no=5.11=284)
M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage. Bend hooks, and authorised overlapping shall be measured and including cost of bindng wire.(sor no=10.05=504).
M.s work in heavy size such as trusses built up gates,record racks, roof work, gates etc. including rivetting or welding where necessary rectangular tubes 76.2x38x3.25 mm and including of all work complete.
P/F of 110 mm P.V.C pipe 6 kg/cmsqm for weep hole and including supply & all work complete.(sor rate 33-160mm)
Hire charges of Pump set of capacity 4000 litres/hour DSR_0011-2018
Diesel Cost market rate
S/F of black granite display board including supply & all work complete.(anly)
Deduction of 100% old Brick Bats.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.40 MB
BOQ_2041496.xls
BOQ • 0.27 MB
TD1629.pdf
Tender Documents • 0.84 MB
Download all tender documents and submit your bid