Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.6 LAdmitted-Fee/PreQual/Technical/Finance | -41.20% | ₹8.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹9.2 L+₹59,674.58 (6.96%)Admitted-Fee/PreQual/Technical/Finance ASANSOL | ASANSOL | -37.11% | ₹9.2 L+₹59,674.58 (6.96%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹9.9 L+₹1.3 L (15.1%)Admitted-Fee/PreQual/Technical/Finance | -32.32% | ₹9.9 L+₹1.3 L (15.1%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹10.4 L+₹1.9 L (21.6%)Admitted-Fee/PreQual/Technical/Finance VILL AMDIHA PO LALGANJ DIST PASCHIM BARDHAMAN STATE WEST BENGAL PIN 713359 | PASCHIM BARDHAMAN | WEST BENGAL | 713359 | -28.48% | ₹10.4 L+₹1.9 L (21.6%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹10.6 L+₹2.0 L (23.1%)Admitted-Fee/PreQual/Technical/Finance | -27.60% | ₹10.6 L+₹2.0 L (23.1%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14.6 L
EMD Value
₹18,300
Closing Date
11 Sept 2026, 5:00 pmClosed
Area Engineer Civil, Salanpur Area
Office of the General Manager, Salanpur Area, Lalganj. 713359
Providing and fixing a precast R.C.C post signboard for land demarcation at Salanpur Area. (2000 Nos.)
2026_ECL_364512_1
SLN/GM/AE(C)/E-Tender/26-27/15 Dated 29.08.2026
Open Tender
Civil Works - Others
Percentage
60 days
Salanpur Area
as per NIT documents.
3 documents required · 3 mandatory
₹18,300
14 Sept 2026
31 Aug 2026
12 Sept 2026
1 Sept 2026
11 Sept 2026
1 Sept 2026
1 Sept 2026 - 4 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). RCC Post with sign board to be casted as one unit and written as ECL LAND. | - | cum | 8,573.75 | - |
| 2 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | kg | 98.9 | - |
| 3 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work | - | sqm | 79.5 | - |
| 4 | Fitting and fixing guard post incorrect position as directed,true to line and level with embedment of 53cm. to 68cm.(asdirected) into the ground including making hole, repackingthe same thorough thoroughly and including carriage of the guard post of the site. a) With carriage upto 150 metr | - | each | 50 | - |
| 5 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.21 MB
Tendernotice_2.pdf
PDF • 0.86 MB
BOQ_377430.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .