Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹64,599Accepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹70,720+₹6,121 (9.48%)Rejected-AOC BHAGWATI NAGAR JAMMU | 2 | Rejected-AOC L2 | |
| 3 | 3₹73,500+₹8,901 (13.8%)Rejected-AOC 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | 3 | Rejected-AOC L3 | |
| 4 | 4₹77,860+₹13,261 (20.5%)Rejected-AOC | 4 | Rejected-AOC L4 |
Tender Value
₹80,000
Closing Date
30 Nov 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer MID Akhnoor/Nowshera
Office of the Executive Engineer MID Akhnoor/Nowshera
Up gradation replacement of copper Aluminum cables with allied works at LIS Nazla Chak.
2021_IFC_147338_1
87/MID/AN
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
45 days
Akhnoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Executive Engineer MID Akhnoor/Nowshera
Exempted
Office of the Executive Engineer MID Akhnoor/Nowsh
27 Dec 2021
10 Nov 2021
1 Dec 2021
10 Nov 2021
30 Nov 2021
11 Nov 2021
15 Nov 2021
180 days
Replacement of Aluminum cable ( 38mtrs) at LIS Nazla Chak. The job involves disconnecting the power supply and thereafter disconnecting of worn-out/damaged 400mm2 single core aluminum cable from transformer to fuse system and from fuse system to pole no. 1 by using skilled labour and suitable tool/tackles. The job includes replacement of 400mm2 single core aluminium cable from transformer to fuse system( 18 mtrs.) and from fuse system to pole ( 20 mtr. Approx. ) by providing/laying of new 400 mm2 single core aluminium cable ( 38 mtr. Approx. ) of any reputed make conforming to relevant ISO/ISI standards. The job also involves replacement of damaged/ burnt thimbles and providing and fitting of new thimbles of suitable size properly crimped and taped . Complete job includes the cost of cable and allied material, transportation charges, fitting and skilled labour charges at the site of LIS complete Complete Job .
Providing, fitting and laying by way of replacement of damaged/worn-out 50 mm2 copper cable ( 15 mtrs.) from starter to motor of pumping unit no. 03 . The job involves disconnecting the power supply and thereafter disconnecting of worn-out/damaged copper cable single core from starter to motor by using skilled technicians & suitable tools & tackles . The job includes providing/fitting/laying of new 50 mm2 copper cable ( 15 mtrs.) of any reputed make conforming to relevant ISO/ISI standards. The job also involves replacement of damaged/ burnt thimbles and providing and fitting of new thimbles of suitable size properly crimped and taped . Complete job includes the cost of cable and allied material, transportation charges, fitting and skilled labour charges at the site of LIS Complete Job.
M/S FASTTRACK ENGINEERS
NATIONAL ELECTRO-MECH COMPANY
M/s RK Elect. Mech. Engg and fabrication works
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .