| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC 1006 SECTOR 5 THANESAR 1006 SECTOR 5 THANESAR 136118 | KURUKSHETRA | HARYANA | 136118 | ₹2.2 Cr | L1 | Accepted-AOC Lowest |
| 2 | L2₹2.3 Cr+₹6.0 L (2.70%)Rejected-Finance | ₹2.3 Cr+₹6.0 L (2.70%) | L2 | Rejected-Finance Highest |
| 3 | L3₹2.3 Cr+₹12.9 L (5.85%)Rejected-Finance 125 126 OFFICER COLONY RAJGARH ROAD HISAR 125001 | HISAR | HISAR | HARYANA | 125001 | ₹2.3 Cr+₹12.9 L (5.85%) | L3 | Rejected-Finance Highest |
| 4 | L4₹3.0 Cr+₹76.8 L (34.8%)Rejected-Finance 796 AZAD NAGAR ROORKEE DISTT HARIDWAR UK | HARIDWAR | UTTARAKHAND | 247667 | ₹3.0 Cr+₹76.8 L (34.8%) | L4 | Rejected-Finance Highest |
Tender Value
₹2.1 Cr
EMD Value
₹4.3 L
Closing Date
24 Mar 2021, 5:00 pmClosed
Amit Manuja
Executive Engineer, Provincial Division No.1, PWD B and R, Kurukshetra
Thanesar to Ambala Hissar Road via Surmi , Bhagthala, Chanalheri and Telheri (Road ID 7844) RD 0.00 to 100.60 Km in District Kurukshetr
2021_HRY_165051_1
PWD/AMB/KKR-1/110115
Open Tender
Construction Works
Works
90 days
Kurukshetra
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
₹4.3 L
21 Jun 2021
19 Mar 2021
24 Mar 2021
19 Mar 2021
24 Mar 2021
19 Mar 2021
Amount
Providing and laying tack coat with bitumen VG-10 grade pressure distributor at the rate of 0.30 kg. per sqm. On the prepared bituminous surface cleaned with mechanical broom including cost of bitumen as per clause No.503 as per MoRT&H specification (5th edition) 2013. Instrution issued from time to time by MORT&H regarding bitumen VG-10 will be followed strictly. Package - I
Package - II
Providing & Laying 30 mm thick compacted Bituminous Concrete (BC) in one layer with 100-120 TPH batch type hot mix plant and with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with appropriate vibratory rollers to achieve the desired compaction as per clause No. 507 of MoRT&H specification (5th Revision) 2013 for road and bridge works (5th Revision)2013 using minimum 5.4% bitumen grade VG-30 and processed waste plastic @ 7% of bitumen content as per IRC SP -98 -2013 as binder content by weight of total mix, complete in all respects including cost of bitumen instruction issued from time to time by MoRT&H regarding machinery & bitumen will be followed strictly. The use of self propelled mechanical paver fitted with electronic sensor device conforming to MoRT&H specification in mandatory. If bitumen required more than 5.4% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work. Note :-1. Before carrying out bituminous work, coating & Stripping of bitumen aggregate mix is to be performed in accordance with IS-6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti-stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and noting extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-Charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor. Instruction issued from time to time regarding bitumen from MORD will be followed strictly. Note:- Where there is only BC on existing black top, cracks shall be sealed as MoRT&H specification 5th revision clause No. 3004.3, which may consists of (i) Fog seal /or (ii) crack filling and or (iii) patch woek repair as required at site in accordance with clause No.3004.3.3 and 3004.2 of MoRT&H specification . Proper measurement and consumption shall be entered in MB for cracks sealed but no payment on this account shall be made as crack filling is incidental to work. and nothing extra shall be payable. Package - I
Package - II
Preparation and formation of berms and slopes as per X-sections including filling of Earth work, excavation and cutting of earth in all kind of soils including dressing the bank, side slope to given levels and templates after breaking of clouds, including the cost of rolling and watering all allowances for labour hardness wetness irrespective of all lead and lift, but including Compensation for earth taken from private land, fields etc. and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305and to the entire satisfaction of the Engineer of the work conforming to PWD specification No. 6.2 and 6.3 and 3.2 and the other specification 1990 Ist edition. As per X-section attached at DNIT at Section -9. This item also includes E/W if required in sub grade for Widening and Shoulder. Earth used for sub grade, shoulder and berms should have minimum CBR of 8%. Note:-No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer. Package - I
Package - II
Providing & Marking center line / side line 2.5mm thick (minimum) with hot applied thermo-plastic road marking paint 10 cms wide/ 15cm wide complete in all respect such as furnishing all labour, materials, tolls equipments including all incidental costs necessary for carrying out in work at site confirming to the technical specification as clause No. 803 of MORT&H specification for road and bridge works (5th revision) of 2013/ Latest edition. Each container of the thermoplastic material shall have the name trademark or other means of identification of manufacturer, batch number, date of manufacture color maximum application temperature and maximum heating temperature. The thermoplastic paint material shall be of Asian Paint-Apcomark/Berger-Sigmarc/Prismo. The glass beads shall be of Potters/Sovitec/Fleolite. The thermoplastic material shall be sampled and tested in accordance with appropriate ASTM/BS method. The contractor shall furnish to the Engineer-in-Charge a copy of certified test reports from the manufacturer of the thermoplastic material meet all requirement of the specifications. The reflector zing glass beads shall meet the requirement of clause 803.4.2 and test methods mentioned in clause 803.4.2.4 shall be meticulously followed. The minimum thickness specified is exclusive of surface of glass beads the method of thickness measurement shall be in accordance with appendix B and C of BS:3262 (part-3). Note: - Before start of work the contractor shall give brand, batch number, manufacturing date of the material to be used along with a photocopy of bill duly signed by the contractor and get approved the same from Engineer-In-Charge before use. Package - I
Package - II
Routine MaintenanceRoutine Maintenance Cost after completion of Construction for Ist Year. Package - I (Fixed Rates 6547.9)
Package - II (Fixed Rates 6581.7)
Routine Maintenance Cost after completion of Construction for IInd Year. Package - I (Fixed Rates 13095.69)
Package - II (Fixed Rates 13163.22)
Routine Maintenance Cost after completion of Construction for IIIrd Year. Package - I (Fixed Rates 19643.6)
Package - II (Fixed Rates 19744.91)
Routine Maintenance Cost after completion of Construction for IVth Year. Package - I (Fixed Rates 26191.39)
Package - II (Fixed Rates 26326.44)
Routine Maintenance Cost after completion of Construction for Vth Year. Package - I (Fixed Rates 26191.39)
Package - II (Fixed Rates 26326.44)
Item no- 8 to 12 Note-The rates of routine maintenance as indicated in the bill of quantities are to be considered for financial evaluation and determining L-1 contractor irrespective of rates quoted by the contractors. If the rates quoted by contractor differ from fixed rates, then it will not be considered and base rates as fixed in the DNIT will be considered. However, the total amount of L-1 will not be increased from the amount quoted by the contractor and rebate to that extent shall have to be given by the contractor. Further, the payment for routine maintenance to the contractor shall be regulated based on his performance of maintenance activities as per chapter eleven of rural road in manual. (IRC-SP-20-2002). Note:- If any discrepancy found in the unit/ Nomenclature in the items of BOQ. The Nomenculature of HSR/ MoRT&H shall be applicable
Mohinder Singh Contractor
M/s Suraj Construction Company
M/s ajit Construction co
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .