| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.0 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹32.4 L+₹35,271.76 (1.10%)Accepted-Finance NO 165 50B KAMARAJAR NAGAR UTHANGARAI KRISHNAGIRI DISTRICT 635207 | UTHANGARAI | KRISHNAGIRI | TAMIL NADU | 635207 | L2 | Accepted-Finance Accepted |
Tender Value
₹32.6 L
EMD Value
₹33,000
Closing Date
22 Dec 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development officer
BDO Office Uthangarai
Krishnagiri District Uthangarai Block Under AGAMT II 2022 - 2023 9 Works at Pudur Punganai Panchayat Package No UTG AGAMT 11
2022_RDTN_272717_1
ROCNO5214_2022_R10_12_10_2022
Open Tender
Civil Works - Others
Item Rate
180 days
Uthangarai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹33,000
BDO Office Uthangarai
29 Dec 2022
15 Dec 2022
22 Dec 2022
15 Dec 2022
22 Dec 2022
15 Dec 2022
16 Dec 2022
Amount
Rejuvanation of Pond Near Punganai Mariyamman Kovil desilting, Bund strengthening inlet channel and out let channel desilting (50m) and Revetment Construction( 50m),H/O Pudur Punganai Estimate Amount : 3.500Lakhs
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth up to 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earthwork in all soils except hard rock requiring blasting and conveying with initial lead of 0 to 100 m by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deployed and not exceeding 23cm thickness, benching of slopes prior to placement of earth fill, breaking of clods, formation of bund, breaking clods and sectioning with extra watering to OMC and compaction of each layers to 95% of proctor density through deployment of appropriate compaction equipment (8-10 ton vibratory power roller/short width (+0.90M width drum) power roller or vibratory power roller/fuel-operated or electrical operated vibratory plate compactors ensuring compaction of designed bund section compaction complete as per technical specifications etc., complete as directed by the Departmental Officers.
Volume of Earth Work in Existing Bund (including Consolidation using Power Roller)
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., all complete WRO SOR 2022-23 SLNO .56
Construction of Revetment
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)
Provision for Boundary stones
Provision for Name Board charges
2.Rejuvanation of Thruvalan Pond at Pudur desilting, Bund strengthening inlet channel and out let channel desilting and Revetment Construction( 75m),H/O Pudur Punganai Estimate Amount : 5.00 Lakhs
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth up to 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earthwork in all soils except hard rock requiring blasting and conveying with initial lead of 0 to 100 m by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deployed and not exceeding 23cm thickness, benching of slopes prior to placement of earth fill, breaking of clods, formation of bund, breaking clods and sectioning with extra watering to OMC and compaction of each layers to 95% of proctor density through deployment of appropriate compaction equipment (8-10 ton vibratory power roller/short width (+0.90M width drum) power roller or vibratory power roller/fuel-operated or electrical operated vibratory plate compactors ensuring compaction of designed bund section compaction complete as per technical specifications etc., complete as directed by the Departmental Officers.
Volume of Earth Work in Existing Bund (including Consolidation using Power Roller)
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., all complete WRO SOR 2022-23 SLNO .56
Construction of Revetment
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)
Provision for Boundary stones
Provision for Name Board charges
3. Rejuvanation of Kuthimaduvu Pond at Punganai desilting, Bund strengthening inlet channel and out let channel desilting (50m) and Revetment Construction( 30m),H/O Pudur Punganai Estimate Amount : 3.00 Lakhs
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth up to 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earthwork in all soils except hard rock requiring blasting and conveying with initial lead of 0 to 100 m by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deployed and not exceeding 23cm thickness, benching of slopes prior to placement of earth fill, breaking of clods, formation of bund, breaking clods and sectioning with extra watering to OMC and compaction of each layers to 95% of proctor density through deployment of appropriate compaction equipment (8-10 ton vibratory power roller/short width (+0.90M width drum) power roller or vibratory power roller/fuel-operated or electrical operated vibratory plate compactors ensuring compaction of designed bund section compaction complete as per technical specifications etc., complete as directed by the Departmental Officers.
Volume of Earth Work in Existing Bund (including Consolidation using Power Roller)
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., all complete WRO SOR 2022-23 SLNO .56
Construction of Revetment
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)
Provision for Boundary stones
Provision for Name Board charges
4. Rejuvanation of Karuppan Kuttai at Pudur desilting, Bund strengthening inlet channel and out let channel desilting (30m) and Weir Construction H/O Pudur Punganai Estimate Amount : 5.00 Lakhs
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth up to 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earthwork in all soils except hard rock requiring blasting and conveying with initial lead of 0 to 100 m by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deployed and not exceeding 23cm thickness, benching of slopes prior to placement of earth fill, breaking of clods, formation of bund, breaking clods and sectioning with extra watering to OMC and compaction of each layers to 95% of proctor density through deployment of appropriate compaction equipment (8-10 ton vibratory power roller/short width (+0.90M width drum) power roller or vibratory power roller/fuel-operated or electrical operated vibratory plate compactors ensuring compaction of designed bund section compaction complete as per technical specifications etc., complete as directed by the Departmental Officers.
Volume of Earth Work in Existing Bund (including Consolidation using Power Roller)
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., all complete WRO SOR 2022-23 SLNO .56
Construction of Surplus Weir
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Provision for Boundary stones
Provision for Name Board charges
5.Construction of Girls Toilet at Konapatti High School H/o Pudur Pungani Estimate Amount : 5.910 Lakhs
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers
Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement using New Stones including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications.
Refilling in foundation Basement With Excavation erat in layer of not more then 15cm thick
Supply and Filling in Foundation and Basement with filling M-sand including water Consolidating etc
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. .
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
For Lintel & Roof level Beam
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Finishing the exposed surface of RCC item of work such as slabs beams, sunshade, facia, canopy slab, staircase waist slab etc., with CM 1:3, 10mm thick. etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Paving the floor with Sctrach Proof Ceramic Tiles of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
Distembering two coats including priming coat with best approved distember and primer including costand conveyance of all materials to site and all labour charges etc
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting two Coats over New iron Works using best quality of enamel paint including cost and conveyance of materials and labour charges etc complete. - 10.00 Sqm.
Towards water supply and Sanitary arrangements including all cost and conveyance of all site etc complete
4" PVC pipe 6Ksc
4" PVC Tee
4" PVC Y junction
3" PVC Air pipe
PVC tap 3/4"
PVC Elbow 3/4"
PVC pipe 3/4"
500 liter sintex tank
Wash basin
Steel mesh for incinerator
Supply of steel doors of following size including all cost at site etc., complete
Steel Door
Steel Door
Towards fixing of steel doors of following size including all cost at site etc., completeion
Steel Door
Supply of RCC Jolly
Roofing with best quality Tuflon sheet
MS square tube of 25.0x25.0x2.60 mm allround
Provision for RCC cover slab for inspection chamber
Provision for writing Name board
6.Construction of Boys Toilet at Konapatti High School H/o Pudur Pungani Estimate Amount : 5.300 Lakhs
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers
Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement using New Stones including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications.
Refilling in foundation Basement With Excavation erat in layer of not more then 15cm thick
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. .
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
For Lintel & Roof level Beam
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Finishing the exposed surface of RCC item of work such as slabs beams, sunshade, facia, canopy slab, staircase waist slab etc., with CM 1:3, 10mm thick. etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Paving the floor with Sctrach Proof Ceramic Tiles of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting two Coats over New iron Works using best quality of enamel paint including cost and conveyance of materials and labour charges etc complete. - 10.00 Sqm.
Towards water supply and Sanitary arrangements including all cost and conveyance of all site etc complete
4" PVC pipe 6Ksc
4" PVC Tee
4" PVC Y junction
3" PVC Air pipe
PVC tap 3/4"
PVC Elbow 3/4"
PVC pipe 3/4"
500 liter sintex tank
Wash basin
Urinal
Supply of steel doors of following size including all cost at site etc., complete
Steel Door
Steel Door
Towards fixing of steel doors of following size including all cost at site etc., completeion
Steel Door
Supply of RCC Jolly
Roofing with best quality Tuflon sheet
MS square tube of 25.0x25.0x2.60 mm allround
Provision for Soak pit for septic tank
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete
Collection and supply of sand filling into the basement including cost and conveyance to the site and labour charges
Collection and supply of filling the stones in soakpit including cost and conveyance to the site and all labour charges
Provision for RCC cover slab for inspection chamber
Provision for writing Name board
7.Construction of Horizontal filter at Punganai AD Colony H/o Pudur Punagani Estimate Amount : 1.57 Lakhs
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete
Inspection Chamber
Drain
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid .
Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)
Plastering with Cement Mortar 1:4(One cement and Five M.Sand), 20mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supply and Filling with sand including all cost of conveyance etc complete
Supply and Filling of 40 mm Metal from Approved Qurry including Cost and Conveyance
Collection and supply of gritty graval from appd qurry including cost and conveyance of all materials to site including all labour charges for filling
Supply and Filling of Char Coal including all labour charges
Supply and Fixing of 0.60x0.60m Vertical Filter steel Fabrication including cost and Conveyance
supplying and fixing of 110mm dia 6ksc pvc pipe including all cost and conveyance etc., all complete
supplying and fixing of 63mm dia 6ksc pvc pipe including all cost and conveyance etc., all complete
Colour Wash Two Coat with App. Colour pigment including all cost and conveyance etc., all complete
Provision for writing Name board
8.Construction of Drainage with Horizontal filter at Mannadipatti village near SHG Building (17m) H/o Pudur Punagani Estimate Amount : 2.50 Lakhs
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders And Hard Gravelly Soil As per SS 20b
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete.
Supplying & Erecting steel centering for Plane surface RC slab, beam lintal bed block
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 20mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Provision for Horizontal fillter
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete
Inspection Chamber
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid .
Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supply and Filling with sand including all cost of conveyance etc complete
Supply and Filling of 40 mm Metal from Approved Qurry including Cost and Conveyance
Collection and supply of gritty graval from appd qurry including cost and conveyance of all materials to site including all labour charges for filling
Supply and Filling of Char Coal including all labour charges
Supply and Fixing of 0.60x0.60m Vertical Filter steel Fabrication including cost and Conveyance
supplying and fixing of 110mm dia 6ksc pvc pipe including all cost and conveyance etc., all complete
supplying and fixing of 63mm dia 6ksc pvc pipe including all cost and conveyance etc., all complete
Colour Wash Two Coat with App. Colour pigment including all cost and conveyance etc., all complete
Provision for writing Name board
9.Providing fencing to additional Horticalture nursery at Pudur village H/o Pudur Punaganai Estimate Amount : 0.78 Lakhs
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers
Cement concrete 1:2:4 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers .
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Colour Wash Two Coat with App. Colour pigment including all cost and conveyance etc., all complete
Supply and fixing of barbed wire including all cost and conveyance etc all complete
Provision for erection charges for precast concrete vertical post including all charges
Provision for grill gate including all cost and all labour charges
Provision for writing Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Sri Sivasakthi Associates
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .