Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.4 CrAccepted-AOC 14 BILASIPARA P O P S BILASIPARA DIST DHUBRI ASSAM PIN 783348 | DHUBRI | ASSAM | 783348 | ₹65.4 Cr | L1 | Accepted-AOC Accept |
| 2 | L1₹65.4 CrRejected-AOC 8TH FLOOR SETHI TRUST BUILDING UNIT II BHANGAGARH G S ROAD GUWAHATI 781005 | KAMRUP METRO | ASSAM | 781005 | ₹65.4 Cr | L1 | Rejected-AOC Reject |
| 3 | Rejected-Technical BHASKAR NAGAR BYE LANE NO 2 GUWAHATI 21 | SOUTH SALMARA MANCACHAR | ASSAM | 783127 | - | - | Rejected-Technical Reject |
| 4 | Rejected-Technical | - | - | Rejected-Technical Reject |
Tender Value
₹72.7 Cr
EMD Value
₹1.5 Cr
Closing Date
27 Feb 2019, 12:00 pmClosed
Chief Engineer, PWD (Roads), Assam, Chandmari
O/o the Chief Engineer, PWD (Roads), Assam, Chandmari, Guwahati, 781003
Assam Mala/Nalbari/01 Improvement and Widening of Ghograpar Damodardham Bijulighat Road including construction of Bridges and other CD works
2019_PWD_12080_1
CE/Maint/Assam Mala/300/2019/5
Open Tender
Civil Works
548 days
Nalbari
Please refer Tender documents.
6 documents required · 6 mandatory
₹10,000
Empowered Officer ASRB
₹1.5 Cr
Yes
15 Jun 2020
20 Feb 2019
27 Feb 2019
20 Feb 2019
27 Feb 2019
20 Feb 2019
20 Feb 2019 - 21 Feb 2019
Amount
Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to beused or auctioned up to lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm thickness. (I) By Manual Means:- A. In area of light Jungle
Scarifying existing bituminous surface to a depth of 50 mm by mechanical means (Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres.)
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 metres (I) Dismantling Brick / Tile work (b) In Cement mortar
(i) (C ) Prestressed / Reinforced Cement Concrete Grade M-20 & above.
(IX) Removing all types of hume pipes and stacking within a lead f 1000 metres including earthwork and dismantling of masonry works (b) Above 900mm dia
EARTHWORK:-(Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 metres.) Qnty. 20000.00x2x1.625x0.325
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirment of table 300-2 ( including compensation of earth.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) (a) From private land
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table (300-2) ( including compensation of earth.)(a), (Including cost of testing of materials at site and laboratory as directed by the deptt.)
BASE AND SUB-BASE COURSES:-Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density,complete as per cl. 401( with an initial lead of 5 Km.)( Including cost of testing of materials at site and laboratory as directed by the deptt.)
Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sb-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant )
BITUMINOUS COURSES:- Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of specified quantity using mechanical means.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) B. Primer@ 1.00kg per sqm (ii) With bitumen emulsion CSS-1h
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.)
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix and filler transporting the hot miox to work site,laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no. 507. complete in all respect. (including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.)
Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no.509. complete in all respect. ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant ) (Including cost of testing of materials at site and laboratory as directed by the deptt.)
Inter locking concrete Block pavement Providing and laying shaded interlocking concrete block pavement having thickness 80mm as per IS 15658 2006(Compressive strength 47.2N/mm sq.
Providing and laying M-40 grade cement concrete Edge Block/ Edge restraints compete as per Technical specification Clause 1504
Construction of Double Hume Pipe culvert :- Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Rate as per SOR (SH&MDR) 2018-19
Plain cement concrete 1:3:6 nominalmix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. Rate as per SOR (SH&MDR) 2018-19
Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing and technical specifications Rate as per SOR (SH&MDR) 2018-19
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 Rate as per SOR (SH&MDR) 2018-19
Providing & laying Reinforced cement concrete pipe NP4/NP3/prestressed concrete pipe for culverts on first class bedding of granular material /cc M-15 in double row including fixing collar with cement mortar 1:2,and cost of granular bedding but excluding excavation, protection works, backfilling, concrete and masonry work in head wall and parapet,cost of pipe and cost of CC bedding. (B) 1000 mm dia
Construction of Single Hume Pipe culvert :- Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Rate as per SOR (SH&MDR) 2018-19.
Plain cement concrete 1:3:6 nominalmix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. Rate as per SOR (SH&MDR) 2018-19.
Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing and technical specifications. Rate as per SOR (SH&MDR) 2018-19
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 Rate as per SOR (SH&MDR) 2018-19.
Providing & laying Reinforced cement concrete pipe NP4/NP3/prestressed concrete pipe for culverts on first class bedding of granular material /cc M-15 in double row including fixing collar with cement mortar 1:2,and cost of granular bedding but excluding excavation, protection works, backfilling, concrete and masonry work in head wall and parapet,cost of pipe and cost of CC bedding. (B) 1000 mm dia Rate as per SOR (SH&MDR) 2018-19.
Providing, laying and positioning Standard single cell precast box culverts along with wing walls, parapet walls, etc. including necessary earthwork in excavation in all type of soil/ rock and refilling, transportation, erection, jointing by grouting, etc complete as per the Assam Standard Culverts drawings and Specifications. (Measurement shall be for the completed culvert in position from top edge to top edge of running length of the boxes). ASC ( 1 cell x 1.5 m x 2.0 m)
ASC ( 1 cell x 2.0 m x 2.0 m)
ASC ( 1 cell x 3.0 m x 2.0 m)
PROTECTION WORKS:- Construction of Retaining walls/breast walls in cement mortar 1:5 as per drawing and technical specifications Clause 1604.:- Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinaru Soil, Upto 3m Depth
Plain Cement Concrete M15 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. II. In 1:4 cement mortar
Providing weep holes in masonry work with 100 mm dia AC pipe
Filter Material behind retaining / breast wall as per specification 1204.3.8 in a width of 600mm
Br. No. 2/1:- Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department.
Excavation for Structures (Earth work in excavation for foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. I) Ordinary soil, B. Mechanical Means, Upto 3 m depth(Without dewatering)
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-1000 mm
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). As per technical specification of MORTH section no 1100, a). Initial and Routine load test.
Levelling course for Pile cap
Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification of MORTH section no 1100, 1500 & 1700, A.RCC Grade M20 (i) Using Concrete Mixer
Supplying, fitting and placing uncoated TMT bar reinforcement in foundation complete as per drawing and technical specifications of MORTH section no 1100, 1500 & 1700, b) With TATA make TMT rebar
Plain/Reinforcedcement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork of MORTH section no 1500, 1700 & 2200, E) a)RCC Grade M30, I)Height upto 5m Case-I:Using concrete Mixer
Supplying, fitting and placing TMT bar reinforcement in substructure complete as per drawing and technical specifications of MoRTH section no 1600, 2200, b)With TATA make TMT rebar
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork. B.RCC Grade M35, Case I : Using Concrete Mixer, b)Height 5m to 10m
Reinforcement in Super Structure: Supplying, fitting and placing TMT bar reinforcement in super-structure including splicing complete as per drawing and technical specifications 1600 of MORTH specification of roads and bridge works for superstructure works, b) With TATA make TMT rebar
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications 2702 of MORTH specification of roads and bridge work.
Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequat space between vertical posts for expansion, complete as per approved drawings and technical specifications.
Drainage Spouts complete as per drawing and Technical specification clause 2705 of MORTH Specification of roads and bridge work for suoerstructure works
Compression Seal Joint (Providing and laying of compression seal joint consisting of steel armoured nosing at two edges of the joint gap suitably anchored to the deck concrete and a preformed chloroprene elastomer or closed cell foam joint sealer compressed and fixed into the gap with special adhesive binder to cater for a horizontal movement up to 40mm and vertical movement of 3mm.)
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid in dry in front of toe of embankment complete as per drawing and Technical specification
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification
Providing and laying boulder apron on river bed for protevtion against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.
Sub Soil Investigation (CE's Accepted Rate)
Bridge No-6/1, Labour for dismanteling all members of the timber bridge (except piles) and stacking them at sutiable places as directed( all members will be under custody of the contractor till taken over by th department.)scarfing and joining piles 25 cm to 30 cm dia Dressed to heartwood 90 cm. In length includng supplying, fitting and fixing with 2 nos. of 50 mmX 10 mm MS FI clamps and 16 mm dia MS bolts and nuts etc. complete as directed
Labour for taking out old piles of the bridge and stacking them at suitable places as directed.
Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department.
Excavation for Structures (Earth work in excavation for foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material., I) Ordinary soil, B. Mechanical Means, Upto 3 m depth(Without dewatering)
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-1000 mm
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). As per technical specification of MORTH section no 1100, a). Initial and Routine load test.
Levelling course for Pile cap
Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification of MORTH section no 1100, 1500 & 1700, A.RCC Grade M20 (i) Using Concrete Mixer
Supplying, fitting and placing uncoated TMT bar reinforcement in foundation complete as per drawing and technical specifications of MORTH section no 1100, 1500 & 1700, b) With TATA make TMT rebar
Plain/Reinforcedcement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork of MORTH section no 1500, 1700 & 2200, a)RCC Grade M30, I)Height upto 5m Case-I:Using concrete Mixer
Supplying, fitting and placing TMT bar reinforcement in substructure complete as per drawing and technical specifications of MoRTH section no 1600, 2200, b)With TATA make TMT rebar
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork., B.RCC Grade M35, Case I : Using Concrete Mixer, b)Height 5m to 10m
Reinforcement in Super Structure: Supplying, fitting and placing TMT bar reinforcement in super-structure including splicing complete as per drawing and technical specifications 1600 of MORTH specification of roads and bridge works for superstructure works, b) With TATA make TMT rebar
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications 2702 of MORTH specification of roads and bridge work.
Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequat space between vertical posts for expansion, complete as per approved drawings and technical specifications.
Burried Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instruction for installation).
Drainage Spouts complete as per drawing and Technical specification clause 2705 of MORTH Specification of roads and bridge work for suoerstructure works
RCC approach slab including and from work complete as per drawing and technical specification clause 1500, 1600, 1700 & 2704 of MORTH specification of roads and bridge works for superstructure work, with TATA make TMT frade rebar
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid in dry in front of toe of embankment complete as per drawing and Technical specification
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification
Providing and laying boulder apron on river bed for protevtion against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.
Bridge No-1/1:- Labour for dismanteling all members of the timber bridge (except piles) and stacking them at sutiable places as directed( all members will be under custody of the contractor till taken over by th department.)scarfing and joining piles 25 cm to 30 cm dia Dressed to heartwood 90 cm. In length includng supplying, fitting and fixing with 2 nos. of 50 mmX 10 mm MS FI clamps and 16 mm dia MS bolts and nuts etc. complete as directed
Labour for taking out old piles of the bridge and stacking them at suitable places as directed.
Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department.
Excavation for Structures;- Excavation for Structures (Earth work in excavation for foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. I) Ordinary soil, B. Mechanical Means, Upto 3 m depth(Without dewatering)
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m., Pile diameter-1000 mm
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). As per technical specification of MORTH section no 1100, a). Initial and Routine load test.,
Levelling course for Pile cap
Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification of MORTH section no 1100, 1500 & 1700, A.RCC Grade M20 (i) Using Concrete Mixer
Supplying, fitting and placing uncoated TMT bar reinforcement in foundation complete as per drawing and technical specifications of MORTH section no 1100, 1500 & 1700, b) With TATA make TMT rebar
Plain/Reinforcedcement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork of MORTH section no 1500, 1700 & 2200, E) a)RCC Grade M30, I)Height upto 5m Case-I:Using concrete Mixer
Supplying, fitting and placing TMT bar reinforcement in substructure complete as per drawing and technical specifications of MoRTH section no 1600, 2200, b)With TATA make TMT rebar
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork., B.RCC Grade M35, Case I : Using Concrete Mixer, b)Height 5m to 10m
Reinforcement in Super Structure: Supplying, fitting and placing TMT bar reinforcement in super-structure including splicing complete as per drawing and technical specifications 1600 of MORTH specification of roads and bridge works for superstructure works, b) With TATA make TMT rebar
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications 2702 of MORTH specification of roads and bridge work.
Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequat space between vertical posts for expansion, complete as per approved drawings and technical specifications.
Burried Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instruction for installation).
Drainage Spouts complete as per drawing and Technical specification clause 2705 of MORTH Specification of roads and bridge work for suoerstructure works
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid in dry in front of toe of embankment complete as per drawing and Technical specification
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification
Providing and laying boulder apron on river bed for protevtion against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.
Sub Soil Investigation
Bridge Design
Construction of RCC covered drain as per design and specification.:- Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Sand Filling in Foundation Trenches as per Drawing & Technical Specification
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork.
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork. (A) RCC Grade M20
Reinforcement in Super Structure: Supplying, fitting and placing TMT bar reinforcement in super-structure including splicing complete as per drawing and technical specifications
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
PROTECTION WORKS:- Supplying, filling and laying in loose with Geo-textile bags of Type-A (1.30x0.70 M) made of Geo textile non woven fabric sheets of 400 GSM manufactured from polyster/ polypropylene conforming to relevant ISO standard filled with specified sand/ silt from flood plain or adjacent char within a distance of 90 m of the work site including excavation, filling Geo bags with sand weighing 126.00 kg after filling, stitching the mouth of the filled bags with polypropylene or polyster complete as per technical specifications and as directed. Without Boat
Supply, Stitching and Laying of Non wooven Geo textile Fabric sheet of 400 gsm
TRAFFIC SIGNS, MARKINGS AND ROAD APPURTENANCES & MISCELLANEOUS ITEMS:- RCC guard post: Supplying,fitting and fixing RCC guard post size 15 cm dia,150cm long,75cm above the ground and 75cm below the ground, with 4-12mm Tor steel main steel and 6mm MS stirrups at 15cm c/c tied in position with annealed black wire, cement concrete proportin 1:2:4 with broken stone aggregate up to 20mm size including centering,moulding the top.curing,painted black and white alternately in 23cm strips upto 0.75m from the top having reflective band 2 nos. of desired shade etc. as per design and direction complete. '30 cm dia with 6-12mmTor bar
Road Marker : Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the MoSrt&H specifications
Painting Lines, Dashes, Arrows etc on Roads in Two Coats on New Work (Painting lines, dashes, arrows etc on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous surface, including cleaning the surface of all dirts, dusts and other foreign matter, demarcation at site and traffic control.) Over 10 cm in width
Providing reflective pavement marker with Micro prismatic lens in both direction having thermoplastic body adhering to the specification and guidelines of MoSRT&H’s fixed to the road surface using the adhesives and the procedures recommended by the manufacturers with three months replacement warranty and free maintenance.
Providing ‘Sparkle Solar Road Studs, manufactured by Tata B.P. Solar India Ltd. Of size (125mmx125mm), 90mm height (from bottom of shank to the top of stud) with detachable battery, m6LEDs-three on each side for Bi-directional studs/3 LEDs on one side for unidirectional studs, ultra bright LED in amber and red colour, weight per stud 700+25 gms, flash rate of 50-65 times per minute completely water resistant and weather proof with replacement warranty and free maintenance fro one year from the date of installation of stud on road-(installation should be made using adhesives and procedures recommended by manufacturer under the supervision of their competent technician).
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mmX75mmX5mm, 330mm long complete as per clause 810.)
Cast in Situ Cement Concrete M20 kerb (Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408. Using Concrete Mixer
Providing, fitting and fixing mild steel complete as per drawing and Technical Specification
Retro reflectorised Traffic sign: Providing and erecting of Retro-Reflectrorised cautionary, mandatory & informatory sign as per IRC: 67 made of high intensity encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick fixed on an angle iron of 25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly design foundation with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing and sign. ( All the Steel work must be Tata/Sail/or any other approved brand) 90cm equilateral traingle
60cm circular
Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) 5th kilometre stone (precast)
Ordinary Kilometer stone (Precast)
Shree Gautam Construction Co Ltd
Rana Construction and Engineers Pvt. Ltd.
ANUPAM NIRMAN PVT. LTD.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid