Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.0 LAccepted-AOC | ₹51.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹51.5 LRejected-AOC | ₹51.5 L | L2 | Rejected-AOC L2 |
Tender Value
₹51.8 L
EMD Value
₹1.0 L
Closing Date
27 Apr 2026, 2:00 pmClosed
General Manager, Zone-7, Lucknow
General Manager, Zone-7, U.P. Projects Corporation Ltd. Lucknow. Gomti Barrage, Left Bank, Gomti Nagar Lucknow.
Work Proposed Sound Proofing A.C. and Sitting Arrangement in auditorium at Autonomous State Medical College Auraiya District-Auraiya (U.P.)
2026_UPPRC_1139643_1
13/UPPCL/GM-7/E-TENDER/2026-27 Dated-10.04.2026
Open Tender
Civil Works - Others
Percentage
120 days
District-Auraiya (U.P.)
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
₹1.0 L
12 Jun 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work Proposed Sound Proofing A.C. and Sitting Arrangement in auditorium at Autonomous State Medical College Auraiya District-Auraiya (U.P.) | - | - | - | - |
| 2 | Providing and Fixing of gattone Channelled Wood works perforated panels of width 133mm, thickness of 15mm and length 2440 mm or as per site requirement, made of a medium density fibre board with minimum 800 Kg/M3 density substrate with a laminated facing as per the approved shade/ species & finish and a melamine balancing layer on the reverse side. The back of the perforated panel shall have sound absorbing non-woven acoustical fleece having NRC upto 0.85. The panels shall be mounted on special aluminium splines using clips approved by the client.The contractor should submit shop drawing before execution, if asked by the Engineer. Any Undulations in the Walls to taken care by the Interior Acoustics Contractor for proper packing. (As per Quotation attached) | - | SQM | - | - |
| 3 | Providing and Fixing of FR grade gattone 9mm thick non wooven composite panel by using 12mm thick BWR PLY. GI frame work of 48mm GI Studs using 0.5mm thick and stud channels at 610mm x
610mm, 0.5mm thick, fixed with MS angle cleats 1220x610mm centers to wall by using metal fasteners, backed with 24 SWG x 12.5mm GI Chicken Wire Mesh as per detailed drawing. The frame work to be filled with non wooven polyster wedding of 50mm thick of 500gsm. After that install the 12mm BWR Ply with help of gypsum screw as per requirement. And fixing of Panel with help of adhesive. Fire Retardant as per ASTM- E84. The product is light weight, with a density of 218 kg/m3. No odor, Formaldehyde free and a smoke development index of 300 by ASTM –E84. Any Undulations in the Walls to taken care by the Interior Acoustics Contractor for proper packing. - NRC upto-0.9 (As per Quotation attached) | - | SQM | - | - |
| 4 | Providing & fixing of phlexi loop pile 800gsm carpet free from toxic materials, environmentally safeand hygienic, made with premium brand Polycarbonate or Nylon 100% recyclable, fire resistant, odorless, easy washable with soap and water, Stain smart soil protection, fade resistant, abrasion resistance, resist to soiling, crushing, breaking strength, distortion, elongation’s loop strength, performing against flame spread, wear & tear and color fastness when it is exposed to atmospheric changes, built in antimicrobial treatment. Carpet to be with anti slip Polycarbonate .Carpet to meet PAR (Performance Assessment Rating)by walk tested to determine the most accurate assessment of its expected durability and ARR (Appearance retention rating ). The higher the rating the better the expected performance Carpets to meet TARR (Texture Appearance Retention Rating) to test carpet’s ability to retain the tuft’s original shape and orientation and, in the case of cut-pile constructions, not bloom, burst, or loose twist excessively. Higher pile density effects the look of carpet and durability, more comfort underfoot, improves resistance to crushing and matting. Rate shall be inclusive of installation by using low VOC content adhesive or approved make and covering with protective sheet. (As per Quotation attached) | - | sqm | - | - |
| 5 | Brick work in super-structure above plinth level including necessary cutting and moulding of bricks as required and also including honey comb brick work thickness of wall not to be less than 1.5 brick thick. (1:6 cement & coarse sand). | - | CUM | - | - |
| 6 | 15 mm cement plaster in single coat on rough side of single or half brick wall for interior plastering up to floor two level including internal rounded angles not exceeding 80 mm in girth and finshed even and smooth. (1) 1 cement : 6 coarse sand. | - | SQM | - | - |
| 7 | Providing and laying in position ready mixed or sitebatched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana /Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.. All works above plinth level M-20 | - | CUM | - | - |
| 8 | P/F Mild steel or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and and over lapping & hooks. | - | QTL. | - | - |
| 9 | Cement concrete flooring 1:2:4 (1 cement :2 coarse sand :4 graded stone aggregate 12-20mm nominal size laid in one layer neat cement (40 mm thick floor). | - | SQM | - | - |
| 10 | Distempering (Two coat) with oil bound distemper of approved brand and manufacture & of required shade on undecorated wall surface to give an even shade over & including a priming coat with cement primer of approved brand & manufacture such as Berger,J&N, Shalimar, Asian paints after thoroughly brushing the surface free from mortar droppings & other foreign matters & also including preparing the surface even with plaster of paris or approved synthetic material & sand papered smooth including cost of all materials. (For Internal wall surface) | - | SQM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.67 MB
BOQ_2127882.xls
BOQ • 0.35 MB
BIDDC13.pdf
Tender Documents • 20.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].