| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹64.3 L+₹32,687.20 (0.51%)Rejected-AOC | L2 | Rejected-AOC NOT L1 | |
| 3 | L3₹64.5 L+₹50,578.70 (0.79%)Rejected-AOC FLAT NO 7 MHAMBRE BLDG DR FRANCISCO LUIS GOMES ROAD VASCO DA GAMA GOA 403 802 | SOUTH GOA | GOA | 403802 | L3 | Rejected-AOC NOT L1 | |
| 4 | L4₹68.7 L+₹4.7 L (7.35%)Rejected-AOC FLAT NO 03 PANCHAVATI BUILDING ADARSH NAGAR CHICALIM GOA 403711 | SOUTH GOA | GOA | 403711 | L4 | Rejected-AOC NOT L1 | |
| 5 | L5₹72.2 L+₹8.3 L (12.9%)Rejected-AOC FLAT NO 4 VIRGINIA CO OP HOUSING SOCIETY AIR PORT ROAD CHICALIM VASCO DA GAMA GOA 403 711 | SOUTH GOA | GOA | 403711 | L5 | Rejected-AOC NOT L1 |
| Sl No | Description | Qty | Unit | M/s. R.S. LAWANDE L1 | M/S jvsr constructions L5 | M/s J.D. DESAI L3 | M/S DUBAL CONSTRUCTION L7 | M/S G.N.POWAR L6 | M/s. P S REDDY L4 | K M SUBHANAIAH L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of reinforced cement concrete cover slab and removing the debris to a distance not exc 500m as complete all as specified and directed. | 4 | Cum | 800 ₹3,200 | 990 ₹3,960 | 950 ₹3,800 | 900 ₹3,600 | 500 ₹2,000 Lowest | 900 ₹3,600 | 900 ₹3,600 |
| 2.00 | Material and labour for precast cement concrete 1:2:4 type B1 using 20 mm graded stone aggregate for cover slab set in CM 1:4 including necessary formwork complete all as specified and directed. | 4 | Cum | 9,500 ₹38,000 | 9,900 ₹39,600 | 9,000 ₹36,000 | 10,000 ₹40,000 | 9,000 ₹36,000 | 6,500 ₹26,000 Lowest | 9,000 ₹36,000 |
| 3.00 | Material and labour for mild steel TMT bars 10mm dia and over, cut to length bend to shape required including cranking bending spirally for hopping for columns hooking ends and binding with and clips complete all as specified and directed. | 600 | Kg | 100 ₹60,000 | 99 ₹59,400 | 97 ₹58,200 | 120 ₹72,000 | 105 ₹63,000 | 110 ₹66,000 | 90 ₹54,000 Lowest |
| 4.00 | Demolition of stone /boulder masonry, built in cement mortar including all quoins, arches, pillars, etc., but excluding ashlar facings, dressed stonework and precast concrete articles complete all as specified and directed. | 15 | Cum | 500 ₹7,500 | 630 ₹9,450 | 600 ₹9,000 | 900 ₹13,500 | 800 ₹12,000 | 500 ₹7,500 | 270 ₹4,050 Lowest |
| 5.00 | Pre - cast cement concrete 1:3:6 type C-1, (20mm graded stone aggregate) block masonry with solid blocks built in cement mortar 1:4 complete all as specified and directed. | 15 | Cum | 7,100 ₹1,06,500 | 7,200 ₹1,08,000 | 6,900 ₹1,03,500 | 6,500 ₹97,500 Lowest | 7,200 ₹1,08,000 | 7,000 ₹1,05,000 | 6,750 ₹1,01,250 |
| 6.00 | Demolition of un-reinforced cement concrete of any description and in any position not otherwise specifically provided for complete all as specified and directed. | 5 | Cum | 450 ₹2,250 Lowest | 765 ₹3,825 | 600 ₹3,000 | 1,200 ₹6,000 | 800 ₹4,000 | 750 ₹3,750 | 450 ₹2,250 Lowest |
| 7.00 | Material and labour for PCC type C2 1:3:6 (40cm graded aggregate) as in foundation of drains complete all as specified and directed. | 2 | Cum | 5,700 ₹11,400 | 5,400 ₹10,800 | 6,000 ₹12,000 | 9,000 ₹18,000 | 6,500 ₹13,000 | 6,500 ₹13,000 | 4,950 ₹9,900 Lowest |
| 8.00 | Material and labour for PCC type B0 1:2:4 (12.5mm graded aggregate) as in haunching including weathering, slightly rounded or chamfered angles and throating complete all as specified and directed. | 1 | Cum | 6,100 ₹6,100 | 5,850 ₹5,850 | 6,200 ₹6,200 | 11,000 ₹11,000 | 5,500 ₹5,500 | 7,500 ₹7,500 | 5,400 ₹5,400 Lowest |
| 9.00 | Material and labour for PCC type B1 1:2:4 (20 mm graded aggregate) as in coping including weathering, slightly rounded or chamfered angles and throating as directed | 2 | Cum | 6,100 ₹12,200 | 6,300 ₹12,600 | 6,300 ₹12,600 | 11,000 ₹22,000 | 6,500 ₹13,000 | 7,500 ₹15,000 | 5,400 ₹10,800 Lowest |
| 10.00 | Rendering 15 mm thick in cement mortar (1:4) on brick surface and finishing plastered surface with using extra cement, complete all as specified and directed. | 5 | Sqm | 400 ₹2,000 | 360 ₹1,800 | 390 ₹1,950 | 450 ₹2,250 | 500 ₹2,500 | 350 ₹1,750 Lowest | 396 ₹1,980 |
Tender Value
₹80 L
EMD Value
₹1.4 L
Closing Date
4 Oct 2025, 6:00 pmClosed
COL SAIKAT DE CWE NAVY VASCO
CWE NAVY VASCO VASCO DA GAMA GOA 403802
REPAIR TO DRAIN, PATH, EMERGENCY LINK AND OTHER MISCELLANEOUS B/R WORKS AT AIRFIELD AT INS HANSA UNDER GE NW VASCO
2025_MES_728466_1
85998
Open Tender
Civil Works
Item Rate
Vasco
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,000
GE (NW) Vasco
₹1.4 L
Yes
10 Nov 2025
29 Aug 2025
6 Oct 2025
29 Aug 2025
4 Oct 2025
19 Sept 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .