Blow Pipe for Welding and Cutting as per IS 7653 (V2) (Q3)
Acetylene Pressure Regulator as per IS 6901 (Q3)
Oxygen Gas Regulators (Version 2) (Q2)
Electrode Holder as per IS 2641 (Q3)
Welding Cable (V2) as per IS 9857 (Q2)
Rubber Welding Hoses as per IS 447 (Q3)
Flash Back Arrestor (Q3)
Gas Cutting Nozzles (Q3)
DARK GLASS FOR WELDER'S SCREEN (Q3)
Welder Gloves or Gauntlets as per IS 2573 (Q3)
Welding apron (Q3)
Electrical connection Lugs or thimbles (Q3)
Hose Clamp as per IS 4762 (Q3) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Experience Criteria
Certificate (Requested in ATC)
OEM Authorization Certificate
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Bid Number : GEM/2025/B/6447672 Dated : 08-08-2025 Bid Document 1/26 -- Minimum number of bids required to disable automatic bid extension 3
-- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Blow Pipe for Welding and Cutting as per IS 7653 (V2) Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 254432 Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting