| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹75,440 (0.60%)Admitted-Finance 1ST 2ND FLOOR PLOT NO 13 C 13 3 RAMA ROAD SIDE INDUSTRIAL AREA NAJAFGARH ROAD DELHI 110015 INDIA | WEST | DELHI | 110015 | ₹1.3 Cr+₹75,440 (0.60%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 Cr+₹5.3 L (4.23%)Admitted-Finance 1 6 620 CHAITANYAPURI INDRA NAGAR DILSUKHNAGAR HYDERABAD TELANGANA 500060 UDYAM TS 09 0007870 37AAEPO0535A1Z8 B 36AAEPO0535A1ZA R MSME STATUS AS VERIFIED | RANGA REDDY | TELANGANA | 500060 | ₹1.3 Cr+₹5.3 L (4.23%) | L3 | Admitted-Finance |
| 4 | L4₹1.4 Cr+₹9.9 L (7.81%)Admitted-Finance 04 L BLOCK MARKET SECTOR 11 NOIDA 201301 UP GAUTAM BUDHA NAGAR | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹1.4 Cr+₹9.9 L (7.81%) | L4 | Admitted-Finance |
| 5 | L5₹1.4 Cr+₹13.5 L (10.7%)Admitted-Finance | ₹1.4 Cr+₹13.5 L (10.7%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GEPS PROJECTS L4 | Lahoty Buildcon Limited L1 | Sri Associates L5 | DPS sales and services india L3 | Vardhman Airport Solutions Private Limited L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00Supply, Fixing, testing and commissioning of Retrofitting of Emission Control Devices (RECD) using wet Scrubber/Electrostatic precipitator (ESP)/Catalytic conversion with output result of the RECD should be as per CPCB-II norms, irrespective of the manufacturer's technologies as per Govt of India, Ministry of Environment Forest and Climate Change (MOEF&CC), National Clean Air Programme (NCAP) for prevention, control and abatement of Air pollution levels having minimum specified Particulate Matter (PM) capturing efficiency of 70% type approved by CPCB recognised. (i) Capturing Chamber- Stainless steel (ii) Online Monitoring (iii) Sensor (Temp & Pressure) (vi) Back Pressure Limit for DG Set - 10.15 kpa (v) Stack Back Pressure <1 kpa With 4000 hours run or 6 years (whichever is earlier) Emission durability period for DG Sets manufactured/imported between 01 Jul 2004 to Jul 2014 of following capacity DG Sets. NOTE: (Applicable for all items):- 1 The bidders/contractors are advised to read tender document & all corrigendum / amendments and General conditions of contracts before entrying/quoting the rates. 2. Ensure that all data should be logged to a dedicated cloud and dedicated desktop of configuration at least i5 gen 12 processer 8 GB RAM, storage 1TB including laser jet printer to be provided by the contractor for data. 3. Contractor has to offer training (from OEM) to the MES staff to ensure smooth operation of the system. 4. Rates quoted deemed to be included for provision of above item No 1&2. | ||||||||
| 1.10Technical specification (i) Type of emission device (working principle of the PM reduction active element) : Electrostatic Precipitation (ESP) (ii) Emmision limits as per CPCB-II norms : PM 2.5 ≥0.2 g/k W-hr, Nox + HC <4.0 g/k W-hr, CO 3.5g/k W-hr, Smoke Limit (Light Absorption Co-efficient 0.7 m-1 (iii) praticulate Matter capturing efficiency : Greater than 70% (iv) Back pressure on engine : NO back pressure form RECD to Engine Exhaust system (v) Material of construction : SS202 for inlet chamber, Oxidation chamber, PRT chamber, Outlet chamber SS304 for PRV SS2062 Grade B for Inlet pipe, Outlet pipe, Structure, Removable ladder (vi) Emission monitoring from stack shall be tested from any NABL approved Lab (vii) Insulation on emmision device: Glass wool with aluminium cladding with 22G sheet (viii) RECD's power requirement : less than 1% of the capcity used for operation (ix) supply of 200 mm MS B-Class exhaust piping with insulation and aluminium sheet cladding on MS supports for extension to existing exhaust piping with bellows / connectors as required for the works. (x) Electric control panel with necessary wiring and all its accessories for smoth functioningof DG with RECD system | ||||||||
| 1.20(xi) Support provided by OEM : pre supply and inspection, installation feasibility study at site, Health check-up of existing DG, Type Approved RECD with complete Solution, Educating Dept Staff on usage and operation and maintenance procedure (xii) Installation and commisssioning of RECD by authorised and approved OEM only Scope of Work : (i) Emission control system with PRV , Inlet & outlet pipe, Structure with removable ladder and Electri panel with all accessories. (ii) Performance / Characteristic curves at rated load - Under vendor scope (iii) The output result of RECD shall be as per CPCB -II norms, irrespective of the manufacturer;s technology (vi) Secondary emission : Bidder shall submit the declaration that there is no secondary emission (V) Noise emission : No increase in noise level after installation of retrofit device (vi) No by-pass arrangement in RECD allowed to let the pollutants in open environment (vii) Testing -Genset shall be tested on all load pattern available at site during post RECD installation (viii) Warranty in all respect of 02 years post completion of work is applicable in RECD installation (ix) Contractor shall furnish manufacturer's written instruction and requirement about use and maintenance of RECD system, its operation and maintenance schedule. | ||||||||
| 1.30Notes :- (i) Retro -fit emission contrrol system should be as per Statutory Authorities recommendations to achive minimum specified particulate matter capturing efficiency of at least 70% The emission control system shall be type tested and approved from CPCB approved laboratories as per guideline of NGT and MOHUA(MINISTRY OF HOUSING AND URBAN AFFAIRS) (ii) Retro-fit emission control system of suitable rating or sizes shall be installed or retrofitted in existing exhaust pipe with required modifications and suitable design compatible for respective model of diesel engine prime mover of DG sets and have safty precautions to ensure no danger to the engine operations under any circumstances (iii) Safety system provided to engine from higher back pressure, engine vibration, and high temperature operations to aviod any malfunction, it should be within the limits as recommended by DG OEM. The retrofit system manufacturer to coordibate and submit certificate from DG OEM. Cost for the same is deemed to be included in the quoted cost. | ||||||||
| 1.40(iv) The emission reduction will be verfied after the installation of unit at site by any of the air pollution labs approved by CPCB. Contractor will submit the necessary certificate. Cost for the same is deemed to be included in the quoted cost.(v) The unit quoted cost includes all necessery RCC civil foundation/MS structure for installation of RECD structures as per recommendation of manufacturer and as directed by GE. (vi) Make of existing DG set -kirloskar Oiil Engine Ltd/Greaves. (vii) All RECD equipments of make and model numbers with technical specification along with detail drawing and test certificate shall be submitted to GE by the contractor before procurement of the equipemnt. (viii) The OEM should install the RECD system in the presence of representative detailed by AO and necessary test certificate shall be obtained as per CPCB norms. | ||||||||
| 2.00 | 08 KW (10KVA) DG Set | 1 | EACH | 1,96,700 ₹1,96,700 | 80,000 ₹80,000 | 1,87,500 ₹1,87,500 | 31,000 ₹31,000 Lowest | 49,000 ₹49,000 |
| 3.00 | 12 KW (15KVA) DG Set | 2 | EACH | 1,96,700 ₹3,93,400 | 90,000 ₹1,80,000 | 1,87,500 ₹3,75,000 | 46,500 ₹93,000 Lowest | 74,000 ₹1,48,000 |
| 4.00 | 16 KW (20KVA) DG Set | 1 | EACH | 1,96,700 ₹1,96,700 | 95,000 ₹95,000 | 1,87,500 ₹1,87,500 | 62,000 ₹62,000 Lowest | 99,000 ₹99,000 |
| 5.00 | 20 KW (25KVA) DG Set | 1 | EACH | 1,96,700 ₹1,96,700 | 1,20,000 ₹1,20,000 | 1,87,500 ₹1,87,500 | 77,500 ₹77,500 Lowest | 1,24,000 ₹1,24,000 |
| 6.00 | 24 KW (30KVA) DG Set | 2 | EACH | 2,18,000 ₹4,36,000 | 1,25,000 ₹2,50,000 | 1,87,500 ₹3,75,000 | 93,000 ₹1,86,000 Lowest | 1,49,000 ₹2,98,000 |
Tender Value
₹1.4 Cr
EMD Value
₹2.2 L
Closing Date
15 Jul 2024, 5:00 pmClosed
CWE (ARMY) SECUNDERABAD
Commander Works Engineers Mudfort, MES Office Complex Secunderabad-500 003
RETROFITMENT OF 37 DG SETS FOR POLLUTION CONTROL UNDER UNDER AGE EM NO II GE (U) SECUNDERABAD
2024_MES_655786_1
86270
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Secunderabad
As per NIT
7 documents required · 7 mandatory
₹1,000
GE (Utility) Secunderabad
₹2.2 L
Yes
25 Jul 2024
24 May 2024
22 Jul 2024
24 May 2024
15 Jul 2024
19 Jun 2024
Amount
Supply, Fixing, testing and commissioning of Retrofitting of Emission Control Devices (RECD) using wet Scrubber/Electrostatic precipitator (ESP)/Catalytic conversion with output result of the RECD should be as per CPCB-II norms, irrespective of the manufacturer's technologies as per Govt of India, Ministry of Environment Forest and Climate Change (MOEF&CC), National Clean Air Programme (NCAP) for prevention, control and abatement of Air pollution levels having minimum specified Particulate Matter (PM) capturing efficiency of 70% type approved by CPCB recognised. (i) Capturing Chamber- Stainless steel (ii) Online Monitoring (iii) Sensor (Temp & Pressure) (vi) Back Pressure Limit for DG Set - 10.15 kpa (v) Stack Back Pressure <1 kpa With 4000 hours run or 6 years (whichever is earlier) Emission durability period for DG Sets manufactured/imported between 01 Jul 2004 to Jul 2014 of following capacity DG Sets. NOTE: (Applicable for all items):- 1 The bidders/contractors are advised to read tender document & all corrigendum / amendments and General conditions of contracts before entrying/quoting the rates. 2. Ensure that all data should be logged to a dedicated cloud and dedicated desktop of configuration at least i5 gen 12 processer 8 GB RAM, storage 1TB including laser jet printer to be provided by the contractor for data. 3. Contractor has to offer training (from OEM) to the MES staff to ensure smooth operation of the system. 4. Rates quoted deemed to be included for provision of above item No 1&2.
Technical specification (i) Type of emission device (working principle of the PM reduction active element) : Electrostatic Precipitation (ESP) (ii) Emmision limits as per CPCB-II norms : PM 2.5 ≥0.2 g/k W-hr, Nox + HC <4.0 g/k W-hr, CO 3.5g/k W-hr, Smoke Limit (Light Absorption Co-efficient 0.7 m-1 (iii) praticulate Matter capturing efficiency : Greater than 70% (iv) Back pressure on engine : NO back pressure form RECD to Engine Exhaust system (v) Material of construction : SS202 for inlet chamber, Oxidation chamber, PRT chamber, Outlet chamber SS304 for PRV SS2062 Grade B for Inlet pipe, Outlet pipe, Structure, Removable ladder (vi) Emission monitoring from stack shall be tested from any NABL approved Lab (vii) Insulation on emmision device: Glass wool with aluminium cladding with 22G sheet (viii) RECD's power requirement : less than 1% of the capcity used for operation (ix) supply of 200 mm MS B-Class exhaust piping with insulation and aluminium sheet cladding on MS supports for extension to existing exhaust piping with bellows / connectors as required for the works. (x) Electric control panel with necessary wiring and all its accessories for smoth functioningof DG with RECD system
(xi) Support provided by OEM : pre supply and inspection, installation feasibility study at site, Health check-up of existing DG, Type Approved RECD with complete Solution, Educating Dept Staff on usage and operation and maintenance procedure (xii) Installation and commisssioning of RECD by authorised and approved OEM only Scope of Work : (i) Emission control system with PRV , Inlet & outlet pipe, Structure with removable ladder and Electri panel with all accessories. (ii) Performance / Characteristic curves at rated load - Under vendor scope (iii) The output result of RECD shall be as per CPCB -II norms, irrespective of the manufacturer;s technology (vi) Secondary emission : Bidder shall submit the declaration that there is no secondary emission (V) Noise emission : No increase in noise level after installation of retrofit device (vi) No by-pass arrangement in RECD allowed to let the pollutants in open environment (vii) Testing -Genset shall be tested on all load pattern available at site during post RECD installation (viii) Warranty in all respect of 02 years post completion of work is applicable in RECD installation (ix) Contractor shall furnish manufacturer's written instruction and requirement about use and maintenance of RECD system, its operation and maintenance schedule.
Notes :- (i) Retro -fit emission contrrol system should be as per Statutory Authorities recommendations to achive minimum specified particulate matter capturing efficiency of at least 70% The emission control system shall be type tested and approved from CPCB approved laboratories as per guideline of NGT and MOHUA(MINISTRY OF HOUSING AND URBAN AFFAIRS) (ii) Retro-fit emission control system of suitable rating or sizes shall be installed or retrofitted in existing exhaust pipe with required modifications and suitable design compatible for respective model of diesel engine prime mover of DG sets and have safty precautions to ensure no danger to the engine operations under any circumstances (iii) Safety system provided to engine from higher back pressure, engine vibration, and high temperature operations to aviod any malfunction, it should be within the limits as recommended by DG OEM. The retrofit system manufacturer to coordibate and submit certificate from DG OEM. Cost for the same is deemed to be included in the quoted cost.
(iv) The emission reduction will be verfied after the installation of unit at site by any of the air pollution labs approved by CPCB. Contractor will submit the necessary certificate. Cost for the same is deemed to be included in the quoted cost.(v) The unit quoted cost includes all necessery RCC civil foundation/MS structure for installation of RECD structures as per recommendation of manufacturer and as directed by GE. (vi) Make of existing DG set -kirloskar Oiil Engine Ltd/Greaves. (vii) All RECD equipments of make and model numbers with technical specification along with detail drawing and test certificate shall be submitted to GE by the contractor before procurement of the equipemnt. (viii) The OEM should install the RECD system in the presence of representative detailed by AO and necessary test certificate shall be obtained as per CPCB norms.
08 KW (10KVA) DG Set
12 KW (15KVA) DG Set
16 KW (20KVA) DG Set
20 KW (25KVA) DG Set
24 KW (30KVA) DG Set
28 KW (35KVA) DG Set
32 KW (40KVA) DG Set
40 KW (50KVA) DG Set
52.4 KW (62.5KVA) DG Set
80 KW (100KVA) DG Set
100 KW (125KVA) DG Set
128 KW (160KVA) DG Set
160 KW (200KVA) DG Set
200 KW (250KVA) DG Set
320 KW (400KVA) DG Set
Ditto all as per item no 1 above but with 4000 hours or 6 years (which ever is earlier) emission durability period for DG Sets manufactured/ imported after 01 Jul 2014 upto 320 KW DG Sets for following capacity DG Sets
16 KW (20KVA) DG Set
20 KW (25KVA) DG Set
32 KW (40KVA) DG Set
52.4 KW (62.5KVA) DG Set
52.4 KW (82.5KVA) DG Set
80 KW (100KVA) DG Set
100 KW (125KVA) DG Set
160 KW (200KVA) DG Set
256 KW (320KVA) DG Set
320 KW (400KVA) DG Set
Dismantaling and taking down old existing exhaust system in various capacity of DG Sets complete all as specified and directed by engineer in charge
Vardhman Airport Solutions Private Limited
DPS sales and services india
GEPS PROJECTS
Sri Associates
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
Tender86270.pdf
Tender Documents • 1.02 MB
BOQ_733801.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .