| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-Finance NO 6 76 EAST STREET THOPPUR MADURAI 625008 | MADURAI | MADURAI | TAMIL NADU | 625008 | L1 | Accepted-Finance L1 bidder |
| Sl No | Description | Qty | Unit | C RAJASEKARAN L1 |
|---|---|---|---|---|
| 1.00Improvement works with allied Civil works | ||||
| 1.01 | Removing and refixing of AC Sheet partition for Outer side patch plastering workTamil sagam section including cost of all materials, lead, lift etc., complete. | 10 | Nos | 90 ₹900 Lowest |
| 1.02 | Dismantling the IWC and surki around the closet and clearing the site and disposing the debris 1 Km away including the cost of all labour, lead, lift, T&P etc complete. | 2 | Nos | 945 ₹1,890 Lowest |
| 1.03 | Dismantling of existing damaged wall tiles without any damage to the existing structure including cost of labour, T & P safety arrangements, cleaning the site,lead,lift etc complete. | 22 | sqm | 72 ₹1,584 Lowest |
| 1.04 | Dismantling of existing damaged floor tiles without any damage to the existing structure including cost of labour, T & P safety arrangements, cleaning the site,lead,lift etc complete. | 6.5 | sqm | 72 ₹468 Lowest |
| 1.05 | Dismantling the Ex.wash basin and clearing the site and disposing the debris 1 Km away including the cost of all labour, lead, lift, T&P etc complete. | 1 | No | 468 ₹468 Lowest |
| 1.06 | Dismantling of existing damaged plain cement concreet in flooring, the cost including cost of all materials, hire charges for tools and plants, clearing the debris away from the site, needed safety arrangements, all leads, lifts etc complete. | 4 | cum | 567 ₹2,268 Lowest |
| 1.07 | Dismantling of existing damaged brick walls without any damage to existing Cr walls including cost of all materials, hire charges for tools and plants, clearing the debris away, needed safety arrangements, all leads, lifts etc complete. | 0.35 | cum | 333 ₹116.55 Lowest |
| 1.08 | Earth work excavating for foundation ( HGS 20 B ) and depositing on bank with an initial lead of 10 m & lift of 2 m in Hard stiff clay , stiff black cotton, hard red earth , shales murram. gravel, stoney earth and earth mixed with small size boulders SS 20 B, including cost of tools and plants etc, complete. | 1.15 | cum | 90 ₹103.5 Lowest |
| 1.09 | Supplying and filling for M sand in foundation with well watering and consolidation as per standard Specification etc complete., | 4.85 | cum | 1,971 ₹9,559.35 Lowest |
Tender Value
Refer Docs
EMD Value
₹1,980
Closing Date
6 Mar 2026, 2:00 pmClosed
SE/MEDC/Metro/Madurai
Race Course Road, TNEB Complex, K.Pudur, Madurai
Estimate for Improvement works such as flooring, Dooding in existing Ground and Second floor toilets, providing verified tiles flooring for the Assistant Engineer/Distribution cabin at Ground floor with new wiring works for Tamil Sangam section offic
2026_EB_658801_1
SE/MEDC/Metro/Mdu/017/2025-26
Open Tender
Civil Works
Works
Madurai
as in specification
2 documents required · 2 mandatory
₹0
₹1,980
Yes
10 Mar 2026
20 Feb 2026
7 Mar 2026
20 Feb 2026
6 Mar 2026
20 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Improvement works with allied Civil works | |||||
| 1.01 | Removing and refixing of AC Sheet partition for Outer side patch plastering workTamil sagam section including cost of all materials, lead, lift etc., complete. | 10 | Nos | - | - |
| 1.02 | Dismantling the IWC and surki around the closet and clearing the site and disposing the debris 1 Km away including the cost of all labour, lead, lift, T&P etc complete. | 2 | Nos | - | - |
| 1.03 | Dismantling of existing damaged wall tiles without any damage to the existing structure including cost of labour, T & P safety arrangements, cleaning the site,lead,lift etc complete. | 22 | sqm | - | - |
| 1.04 | Dismantling of existing damaged floor tiles without any damage to the existing structure including cost of labour, T & P safety arrangements, cleaning the site,lead,lift etc complete. | 6.5 | sqm | - | - |
| 1.05 | Dismantling the Ex.wash basin and clearing the site and disposing the debris 1 Km away including the cost of all labour, lead, lift, T&P etc complete. | 1 | No | - | - |
| 1.06 | Dismantling of existing damaged plain cement concreet in flooring, the cost including cost of all materials, hire charges for tools and plants, clearing the debris away from the site, needed safety arrangements, all leads, lifts etc complete. | 4 | cum | - | - |
| 1.07 | Dismantling of existing damaged brick walls without any damage to existing Cr walls including cost of all materials, hire charges for tools and plants, clearing the debris away, needed safety arrangements, all leads, lifts etc complete. | 0.35 | cum | - | - |
| 1.08 | Earth work excavating for foundation ( HGS 20 B ) and depositing on bank with an initial lead of 10 m & lift of 2 m in Hard stiff clay , stiff black cotton, hard red earth , shales murram. gravel, stoney earth and earth mixed with small size boulders SS 20 B, including cost of tools and plants etc, complete. | 1.15 | cum | - | - |
| 1.09 | Supplying and filling for M sand in foundation with well watering and consolidation as per standard Specification etc complete., | 4.85 | cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_790397.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .