Loading…
Loading…
Tender ID
Tender Value
₹4.9 L
EMD Value
₹4,919
Closing Date
20 Apr 2026, 10:00 amClosed
Sr.Executive Engineer
O/o Sr.Executive Engineer,CMD HPSEBL Bhabanagar
Demolition and restoration of damaged existing RCC Foundation of Unit-II , Unit-IV i,c and repair, reconstruction of Tail Race side wall and bottom floor of Unit No-1 at Rongtong Power House under CMD Bhabanagar
2026_HPSEB_134103_1
HPSEBL/CMD/WK-24/2026-27-04
Open Tender
Civil Works
Percentage
Rongtong, Rangrik
Please refer Tender documents.
7 documents required · 7 mandatory
₹590
₹4,919
10 Apr 2026
10 Apr 2026
20 Apr 2026
10 Apr 2026
20 Apr 2026
10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in charge. | 16.49 | Cum | - | - |
| 2.01 | Applying epoxy of Dr. Beck/Fixit double coat complete as per specification | 7.7 | Sqm | 1 | ₹7.69 |
| 3.01 | Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm,so as to give a fair finish including centring, shuutering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 Mtrs. and removal of same for insitu-reinforced concrete & plain concrete work in: Vertical surfaces such as walls (any thickness) partitions and the like including attached pilasters, buttresses, plinth and string courses and the like. | 58.6 | Sqm | - | - |
| 4.01 | Providing and placing free flow micro concrete Renderoc RG / Sika MicroConcrete-2 or equivalent product of after fixing slurry tight shuttering. The micro concrete should be mixed mechanically while maintaining water, powder ratio of 0.16 strictly in accordance with the manufacturer's instructions and as per the direction of the Engineer-in-charge. The micro concrete should develop a compressive strength of 10 N/mm2 within 1 day, 40 N/mm2 within 7 days and 50 N/mm2 within 28 days. The cost is inclusive of materials, transportation, labour, taxes etc. all complete. | 3.74 | Cum | - | - |
| 5.01 | 10.2 Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 207.69 | Cum | - | - |
| 6.01 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchorblocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing
1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 29.88 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
BOQ_198319.xls
BOQ • 0.28 MB
tenderdocument04.pdf
Tender Documents • 0.76 MB
corrigendum04.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .